MnHssnl Brsreru Annexure A FORM 1 ISee Regulation 3l ARCHITECT,S CERTIFICATE (To be submitted at the time of Re8istration of Ongoing Project & for Withdrawal of Money from Designated Account) Datet 05/04/2022 To, Mr. Ashok Baheti Plot No.l Flat No.1, The Rose, Town Center, CIDCO, Aurangabad. Subject: Certificate of Percentage of Completion of Construction Work of Hrim Ssky City Phase I Building called as Hrim Ssky City A-1 Building having MahaRERA Registration Number P51500003143 being developed by Mr. Ashok Bahetl, Sir, We M/s Manggal Design have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of Hrlm Ssky City Phase I , Building called as Hrim Ssky City A-1 Building having MahaRERA Registration Number P51500003143 being developed by Mr. Ashok Baheti Based on the Site lnspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percenta8e of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-8. TABLE.A-1 To Be Prepared For BUILDING A -1 "Hrim Sskv Ciw-Phase l" March-2022 5r. Tasks/Activity Percentage of work No done 1 Excavation 100% 2 Number of Podiums N.A, 3 Number of Plinth LOO% 4 stiltfloor - FABKIN& 700% 5 1f Number of Slabs of Super Structure 700% ffiH# N@*& TH Mnrusenl EksrrN 6 lnterna I Masonry walls 700% 7 lnterna I Plaster ro0% 8 Flooring within Flats/Premises \Q)/o 9 Doors and Windows to each of the Flat/Premises 700% 10 Sanitary Fitting within the Flat/Premises,Electrical Fittings 700% within the Flat/Premises 11 Staircases, Lifts Wells and Lobbies at eachFloor level connecting Staircase and Lifts,Overhead and Underground 100% Water Tanks 12 The external plumbing and external plaster,elevation, completion of terraces with waterproofing ofthe 100% Building/Wing 13 lnstallation of lifts, water pumps, Fire Fighting Fittingsand Equipment as per CFO NOC, Electrical flttings tocommon Areas, electro, [4e€hanka+---eq!+4Ect,Complian€€--+e- cenditidns of environmFqt/CRz Ne€rFinishing to entrance L00% lobby/s, plinth protection, paving of areasAppurtenant to Building/Wing, Compound Walland all other requirements as may be required to obtainoccupation / Completion certificate TABLE.B Common Areas (lnternal & External Development Works) in respect of the Registered Phase / Project Number P51500003143 Common areas and Facilities, Proposed Percentage of Details 5r. Amenities (Yes/No) work done No. 1 lnternal Roads & Footpaths No NA 2 Water Supply Yes L00% Boring 3 Sewerage (chamber, lines, Yes to)% Drainage Line Till Septic Tank, STP) Corporation Line 4 Storm Water Drains NA NA 5 La ndscaping & Tree Planting Yes 1.O0% Tree Plantation for interna I ilE RNSEFL Erstgu project 6 Street Lighting Yes roo% For lnternal Project 7 Community Buildings NA NA 8 Treatment and disposal of Yes LOO% Bio-digester sewage and sludge water System 9 Solid Waste management & NA NA Disposal 10 Water Conservation, Rain water Yes LOO% Rain Water harvesting Harvesting As per Norms 11 Energy management NA NA t2 Fire protection and fire safety Yes 700% As per Fire requirements Norms 13 Electrical meter room, Yes tOOYo As per MSEB Substation, receiving station Norms t4 Others( option to add more) Yours fa ithfully, M/s. Manggal Design License Number ( Agreed & Accepted by: ah-t-otl* 9322\ Hffi +ffi tu Signature of Promot Name: Mr. Ashok Baheti Oate: 05l04/2022