Ar. Hitesh Patel & Associates B.Arch. A.l.l.A., M.C.O.A. ARCHITECT ENGINEERS INTERIOR LANDSCAPE DESIGNER PROJECT MANAGEMENT Add : Shop. No.21, Shukla Complex, Opp. Oxford English School Maganpura, New Mondha NANDED - 431602 Cell : 09823410242 email id : umagroup.nnd@gmail.com, hitesh.shivji@gmail.com FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing project and for withdrawal of Money from the Designated Accolnt)- Oatei 30/05/2026 To, M/s. Shikhar lnfra Sanman Prestige Station Road, Nanded. PAN: AFAFS8070F subject: certificate of percentage of compretion of construction work of ,,Kara Mandir Trust Auditorium, curturar Ha[s and commercial comprex " having MahaRERA Registration Number p5r1ooo79717 being deveroped by M/s, shikhar lnfra Sir, I/V+e. Ar. tlitesh Shiviihhai patel ^ . have undertaken assignment as Arch itect/ Licensed surveyor ot certiryingferce.tage of compretion of c-onstruction work of "Kala Mandir Trust Auditorium, curturar Ha[s and commerciar complex " having MahaREM Registration Number p511OOO79717 being developej by M/s. Shikhar lnfra. Based on Site Inspection. with respect to Layout each of / the Building/Wing of the aforesaid Real Estate project. I certify that'as on the date of this Percentage of work done for each of the buirding/wing ciruficaie, the of the Rear rrt.t"-ei61".i under. MahaREM is as per Table A herein bel6w. Tlie percentage of the work executed with respect to each of the activity of the entire phase is d;taired in raute B. ffi'.\m Pase l1 Table A Lavout/Building/Wing Number "Kala Mandir Trust Auditorium, Cultural Halls and Commercial Complex,, (to be prepared separatelv for each Lavout /Buildino /Wing of the proiect) Percentage Sr, of Actual work NO Tasks /Activity done (as on the (1) (2) date of certificate) (3) 1 Excavation 100 2 Basements (if any) 100 3 Pod iumg (if any) NA 4 Plinth 100 5 Stilt Floor 00 6 Slabs of Su per Structure 42 7 Internal walls, Internal Plaster, Floorings. Doors and 42 Windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 15 9 Staircases, Lifts Wells and Lobbies at each Floor level 42 Overhead and Underground Water Tanks 10 The external plumbing and external plaster, elevation, 00 completion of terraces with waterproofing of the Building/Winq, 11 installation of lifts, water pumps, Fire Fighting Fittings 10 and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale, Any other a ctiv ities Page l2 TABLE- B Percentage of Actual Sr, Proposed Work done Common areas and Details No. Facilities (2) (Yes/No) (as on the (1) (3) date of (s) certificate) GI 1. Internal Roads & Yes 0 Work stage not Footpaths reached 2. Water Su pply Yes 00 Work stage not reached 3. Sewerage (chamber, Yes 00 Work stage not lines, Septic Tank, STP) reached 4. Storm Water Drains Yes 00 Work stage not reached 5. Landscaping & Tree yes U Work stage not Planting reached 6. Street Lig hting yes 0 Work stage not reached 7. Community Buildings No 0 Work stage not reached 8. Treatment and disposal yes 0 Work stage not of sewage and sullage reached water o Solid Waste No 0 Work stage not management & Disposal reached 10. Water conservation/ Yes 0 Work stage not Rain water harvesting reached 11. Energy management No 0 Work stage not reached t2. Fire protection and fire Yes 15 Hydrant and safety req u irements detection work started 13. Electrical meter room, Yes 05 Internal Cabling sub-station receiving Work started station 74. Others (option to add No U Work stage not more) reached Page l3 You rs faithfu lly, For : Ar. Hitesh Patel & Associates (Proprietor) Local Authority License No.:- CA|2013158787 Agreed and Accepted by: For : M/s Shikhar lnfra Siddhant Satish Maheshwari Partner Dare: 13/07 /2026 Page l4