Ar. Hitesh Patel & Associates B.Arch. A. l.l.A., M.C.O.A. ARCHITECT ENGINEERS INTERIOR LANDSCAPE DESIGNER PROJECT MANAGEMENT Add : Shop. No.21, Shukla Complex, Opp. Oxford English School Maganpura, New Mondha NANDED - 431602 Cell :09823410242 email id : umagroup,nnd@gmail.conr, hitesh.shivji@gmail.com FORM 1 (See Regulation 3) ARCHITECT'S CERTI FICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from the Designated Account) Date: 3t/O3/2026 To, M/s. Shikhar lnfra Sanman Prestige Station Road, Nanded. PAN:AFAFS8070F Subject: Certificate of Percentage of Completion of Construction Work of "Kala Mandir Trust Auditorium, Cultural Halls and Commercial Complex " having MahaRERA Registration Number P511OOO79717 being developed by M/s. Shikhar lnfra Sir, I/\I#e. Ar. Hitesh thiviibhai Patel have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of "Kala Mandir Trust Auditorium, Cultural Halls and Commercial Complex " having MahaRERA Registration Number P5t1OOO79717 being developed by M/s. Shikhar lnfra. Based on Site Inspection. with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. -j&we Page | 1 Table A Lavout/ Buildi nglWin g N umber "Kala Mandir Trust Auditorium, Cutturat Halls and Commercial Complex,, Percentage Sr. of Actual work No Tasks /Activity done (as on the (1) (2) date of certificate) (3) 1 Excavation 100 2 Basements (if any) 100 3 Podiums (if anv) NA 4 Plinth 100 5 Stilt Floor 00 6 Slabs of Super Structure 1B 7 Internal walls, Internal ptasteffi 1B Windows within Flats/premises B Sanitary Fittings within the Flat/premises 10 9 Staircases, Lifts Wells and Lobbies at eaih- floor level 1B Overhead and Underground Water Tanks 10 The external plumbing and exte@ 00 completion of terraces with waterproofing of the Building/Wing, 11 Installation of lifts, water pum@ 00 and Equipment as per CFO NOC, Electricai fittingi, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any oiher 8ar) activities !,xd_ la 'Q 6") '/o8, SoTsrV +3.88 \\ Page | 2 TABLE-B Percentage of Actual Sr. Proposed Work done No. Common areas and Details Facilities (2) (Yes/No) (as on the (1) (3) date of (s) certificate) (4) 1. Internal Roads & Yes 0 Work stage not footpaths reached 2. Water Supply Yes 00 Work stage not reached 3. Sewerage (chamber, Yes 00 Work stage not ]1!e9, Septic Tank, STp) reached 4. Storm Water Drains Yes 00 Work stage not reached 5. Landscaping & Tree yes 0 Work stage not Planting reached 6. Street Lighting yes 0 Work stage not reached 7. Community Buildings No 0 Work stage not reached B. Treatment and disposal yes 0 Work stage not of sewage and sullage reached water 9. Solid Waste No 0 Work stage ndt management & Disposal reached 10, Water conservation/ Yes 0 Work stage not Rain water harvesting reached 11. Energy management No 0 Work stage not reached 12. Fire protection and fire Yes 10 Hydrant and safety requirements detection work started 13. Electrical meter room, Yes 00 Work stage not sub-station receiving reached station 74. Others (option to add No 0 Work stage not more) reached I & Xre\ IIE. ,g W ,1*Wv ) la^ ---. paeel3 \ \ Yours faithfully, For: Ar. Hitesh Patel & Associates Local Authority License No.:- CA12013158781 Agreed and Accepted by: For: M/s Shikhar lnfra Date: 12/05/2026 Page | 4