-fir-&"Jil-&iil (D.c E ) CIVIL ENGIN EERING CONSULTANT i Planning i Estimates * Supervision & Turn Key Works Ref.No. 4. The Estimated cost incurred till date is calculated at Rs.00 lfotat of rable A & B), The of Estimated Cost lncurred is calculated on the basis of input m ateria ls/service used and unit cont of these items. 5. The Balance cost of Completion of the Civil, MEP and Allied works for completion of the apartment and proportionate completion of internal & external works as per specifications mentioned in agreement of saleof the project is estimated at RS 23,15,0OPOO{- (Total of Table A & B). 6. I certify that the Cost of the Civil, MEP and allied work for the apartment and proportionate & external works as per specifications mentioned in agreement of sale aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABTE A Building /wing/Layout/Plotted Development bearing CTS Number-3419 or called_!\!\@![!!! TRUST AUDITORIUM. CULTURAL HALL AND COMMERCIAL COMPLEX Sr. Particulars Amount (ln Rs. ) No. 1 Total Estimated cost of the bu ilding/wing/Layout/Plotted 23,15,00,000.0 Development as on date of Registration is 2 Cost incurred as on the date of certificate 00 3 Work done in Percentage (as Percentage of the estimated cost) 4 Balance Cost to be incurred** (Based on Estimated Cost) 23,15,00p00.0 5 Cost lncurred on Additional / Extra ltems not included in the Estimated Cost (Table - C) I!Dl! q lnternal & External Development Works in Respect of the Registered Phase Sr. No. Particu lars Amounts (ln Rs.) 1 Total Estimated cost of the lnternal and External NA Development Works including amenities and Facilities in the layout as on date of Registration is 2 Cost lncurred as on date of certificate NA 3 Work done in Percentage (as Percentage of the estimated NA cost) 4 Balance Cost to be incurred (Based on Estimated Cost) NA 5 Cost lncurred on Additional / Extra ltems not included in NA The Estimated Cost (Table -C) H.No. 1 -23-56, Rauf Colony,Near Royal Rose,Chaitanya Nagar,NANDED. cell:9766412844 Email:musayyabadit@gmail.com BTE Certificate No.066/CR/297040 -$r.&"JU-&iil (D.c.E.) CIVIL ENGINEERING CONSU LTANT * Planning I Estimates * Supervision & Turn Key Works ENG INEER'S CERTIFICATE Date:3Ll2.2021 To SHIKHAR INFRA,NANDED. Subject: Certilicate of Cost Incurred for Re Development of KALAMANDIRru AUDITORIUM. CULTURAL HALL AND COMMERCIAL COMPLEX having Maha RERA Registration Number:............. being developed by SHIKHAR INFRA, NANDED. Sir. I/ Alvi Musayyab Adil have undertaken assignment of Certi$ing Estimated Cost for COMPLEX having Maha RERA Registration Number ....,..........being developed by SHIKHAR INFRA NANDED, 2. We have estimated the cost of Civil, MEP and allied works required for completion of the apartment and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer /Consultants. The Schedule of items and quantity required for the entire work as calculated by me as quantity Surveyor* appointed by Developer/ Engineer, and the assumption of the cost of material, labor and other anputs made by developer, and the site inspection carried out by us to ascertain / confirm the above analysis given to us 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference as Rs.23,15,00p00.0 (Total of Table A & B) at the time on Registration. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required for completion of the apartment and proportionate completion of internal & external works as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate / completion certificate for the building(s) /wing(s) /Layout/Plotted Development from the NANDED WAGHALA Clry MUNICIPAL CORPORATION being the Planning Authority under whose jurisdiction the aforesaid project is being implemented, H,No. 1 -23-56, Rauf Colony,Near Royal Rose,Chaitanya Nagar,NANDED. Cell:9766412844 Email :musayyabadil@gmail.com BTE Certificate No.066/CR/297040 pr-&"Jfl-&hil(D.c.E.) CIVI L ENGINEERING CONSULTANT * Planning * Estimates * Supervision & Turn KeyWorks ,rI. w. Adit B rf Crr,t r.rto iv(,.96f . E. sisnature & Name (tN ,,-oa* l-rr?[frllffR+ stamp of Engineer INot Less than Bachelor's Degree Holder or equivalent as per Section 2(u) of the Act] Local Authority license No. (lf applicable) AB,""d by, "nd ".."pt"d Signature of Promoter Na^e, Si//Aanl S"l,:sA lla]"sl"t "i_ 7"f'4 ffarb,". o1 n/s' ShkA"r Date: Jr7be./zaz4. Note: 1. The scope of work is to complete Registered Real Estate as per drawings approved from time to time and as per specifications mentioned in agreement of sale 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*) 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result is amendment of the cost incurred/to be incurred. 5. All components of work with specifications are indicative and not exhaustive. 6. Please specify if there are any deviations/qualifications. Example: Any deviations in input material H.No. 1 -23-56, Rauf Colony,Near Royal Rose,Chaitanya Nagar,NANDED. cell:9766412844Email:musayyabadit@gmait.com BTECertificateNo.066/cR/297040