Siddiqui Sarfazuddin Ayaz B.E. Civil Bunglow No. B-2, Iqra Appartment, Near Nurani Masiid, Bhadkal Gate, Aurangabad. Mobile No. : 98900077O0 Date : to /a'>/2017. ENGINEER'S CERTIFICATE To, The Vision Ventures Through Its Partner, Ashutosh Navandar and others Subject: Certificate of Cost Incurred for Development of Orchid building Situated on the Plot no. 30,31 bearing CTS No. 15840/90, 1,5840/91,, Garkheda, Aurangabad demarcated by its boundaries flatitude and longitude of the end points) to the North Latitude L9.86048,4 Longitude 75.348122 to the South Latitude D.86A262, Longitude 75.348034, to the East Latitude 19.860383 Longitude 75.3481,89. to the West Latitude 19.860318, Longitude 75.347873 of Village Aurangabad taluka Aurangabad District Aurangabad Pin 4.31001 admeasuring 12.25 sq.mts, area being cieveloped by Vision Ventures Tlirough its partner Ashutosh Navandar and others. Ref : RERA Registration Number Applied For Sir, I Ayaz Siddiqui have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, being Orchid Building of the Project situated on the Plot No, 30 & 31, C,T,S. No, 1584A/90 & C.T.S. No. 1.5840191, Garkheda Village Aurangabad Taluka Aurangabad Distract Aurangabad Pin 4.31001 admeasuring 1225.5 sq. mts. area being developed by Vision Venture through Partner Ashutosh Navandar & Others. 1. following technical professionals are appointed by Owner / Promoter :- i) Shri Deepesh Parkar as L.S. / Architect : iiJ Shri Rajesh H. Vargantwar as Structural Consultant iii) Shri Ayaz S. Siddiqui as MEP Consultant iv) Shri Uttan |adhav as Quantity Surveyor. olc /L+' -L 2) We have estimated the cost of the completion to obtain Occupation Certificate / Completion Certificate, of the Civil, MEP and Allied and Allied Works, of the Building of the project. Our estimated cost calculations are based on the Drawings/ plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Uttam Jadhav quantity Surveyor appointed by Developer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3) We estimate Total Estimated Cost of Completion of the building of the aforesaid project under ref'erence as Rs. 2,7B,OO,OOO/-.The estimated Total Cost of project as reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building[s) from the Aurangabad Municipal Corporation being the Planning Authority under whose jurisdiction the project is being implemented. 4) The Estimated Cost Incurred till date is calculated at Rs. 80,00,000/-. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimate, 5) The Balance cost of Completion of the Civil, MEP and Allied work of the Buildings the subject project to obtain 0ccupation Certificate I Completion Certificate from Aurangabad Municipal Corporation [planr-ring Authority) is estimated at Rs. 1,98,00,000/- 6l I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project I as completed on the date of this certificate is as given in Table A and B below. 7) TABLE A 0rchid building Sr. No. Particulars Amounts Total Estimated cost of the building Rs. 2,78,00 ,000 /- Cost Incurred as on 1,0 /07 12017 [based on Rs. 80,00,000/- the Estimated cost) Work done in Percentage [as Percentage of o/] e */,v the estimated cost) 28.77 4. I Balance Cost to be Incurred [Based on Estimated Cost) Rs. 1,98,00 ,000 l- 5. I Cost Incurred on Additional / Extra Items as on not included in the I Rs. NIL Estimated Cost [Annexure A) TABLE B Orchid building: Not Applicable Sr. No. Particulars Amounts 1. Total Estimated cost of the Internal and Rs. External Development Works including amenities and Facilities in the layout as on date of Registration is, 2. Cost incurued as on [based on Rs. the Estimated cost) 3. Work done in Percentage [as Percentage of o/o the estimated cost) 4. Balance Cost to be Incurred [Based on Estimated Cost) 5. Cost Incurred on Additional / Extra Items Rs. NIL as on not included in lhe Estimated Cost [Annexure AJ Yours Faithfully , ,lO /Lx -L Signature Engineer [Licence No._ 1..The Scope of work is to complete entire Real Estate Project as per drawing approved from time to time so as to obtain Occupation Certificate / Completion Certificate 2. Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked and as in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked. 3. The estimated const includes all labour, material, equipment and machinery required to carry out entire work --v"k 4. As this is an estimated cost, any deviation in quantity required for development of the real has to estate Project will result in amendment of the cost incurred/ to be incurred. 5. All Components of work with specifications are indicative and not exhaustive. >')k