YASHODEEP Associates & Consultants Yashodeep Complex, Opp. Bank of Maharashtra, Shani mandir Chowk, Jalna M - 9823039696 Form 1 (See Regulation 3) ARCHITECTS CERTIFICATE (To be submitted at the time of registration of ongoing projects and for withdrawal of Money from designated Account) Date: 20.04.2019 Ref: MD / Rera / 01 To, Morya Developers, H-1, RH-4, Sec-6, Vashi, Navi Mumbai-400703 Subject: Certificate of percentage completion of work of ‘Manor’ - (by Morya Developers) situated at Gut No. 171, 172,173 of village Dhavedi, Taluka & District Jalna demarcated by its boundaries 19°55’01”N-75°55’30”E (West); 19°55’00”N-75°55’43”E (East); 19°55’08”N- 75°55’39”E (North); 19°54’57”N-75°55’32”E (South). Admeasuring 13,099 SQM being developed by M/s Morya Developers. Dear Sir, I Mr. H.R. Hushe have undertaken assignment as an Architect of certifying percentage of completion of construction work of Manor, situated on Gut No. 171, 172,173 of village Dhavedi, Taluka & District Jalna being developed by M/s Morya Developers. Following technical professional are appointed by Owner / Promoter: 1. Mr. H.R. Hushe as Architect 2. Structural Consultant – Not Applicable in layout scheme) Based on site inspection, with respect to the layout the aforesaid Real Estate Project, I certify that as on date of this certificate, percentage of work done for the layout of above said project is as per Table A here in below. The percentage of work executed with respect to each of the activity of the entire phase is detailed in table. Page 1 of 3 YASHODEEP Associates & Consultants Yashodeep Complex, Opp. Bank of Maharashtra, Shani mandir Chowk, Jalna M - 9823039696 Document for Maha RERA Process M/s Morya Developers Date: 20.04.2019 H-1, RH-4, Sec-6, Vashi, Navi Mumbai-400703 Ref: MD / Rera / 01 TABLE – A Sr. TASKS / ACTIVITY PERCENTAGE OF No. WORK DONE 1 Excavation 100 % 2 Number of Basement(s) and 1 Plinth N.A. 3 Number of Podiums N.A. 4 Stilt Floor N.A. 5 Number of slabs of super structure N.A. 6 Internal walls, Internal Plaster, Floorings within Flats / N.A. Premises, Doors and windows to each of the Flat / Premises 7 Sanitary Fittings within the Flat / Premises; Electrical fittings N.A. within the Flat / Premises 8 Staircases, Lift wells, and lobbies at each floor level N.A. connecting staircases and lifts, Overhead and underground water tank. 9 The External Plumbing & external plaster, elevation, N.A. completion of terraces with waterproofing of the building / wing. 10 Installation of Lifts, Water Pumps, Fire fighting fittings and N.A. equipment as per CFO NOC, Electrical fittings to common areas, Electro-Mechanical equipment, compliance to conditions of environment, CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to building / Wing, Compound wall and all other requirements as may be required to obtain occupation / completion certificate. Page 2 of 3 YASHODEEP Associates & Consultants Yashodeep Complex, Opp. Bank of Maharashtra, Shani mandir Chowk, Jalna M - 9823039696 Document for Maha RERA Process M/s Morya Developers Date: 20.04.2019 H-1, RH-4, Sec-6, Vashi, Navi Mumbai-400703 Ref: MD / Rera / 01 TABLE – B S COMMON AREAS AND FACILITIES PROPOSED PERCENTAGE OF DETAILS No AMENITIES (YES/NO) WORK DONE 1 Internal roads and footpaths Yes 94% In Process 2 Water Supply Yes 100% 3 Sewerages (chamber lines, septic No N.A. N.A. tank, STP) 4 Storm Water Drains YES 100% 5 Landscaping & Tree Planting YES 100% 6 Street Lighting YES 100% 7 Community Buildings NO N.A. N.A. 8 Treatment and disposal of sewage and NO N.A. N.A. sullage water 9 Solid waste management and disposal NO N.A. N.A. 10 Water conservation, Rain water NO N.A. N.A. harvesting 11 Energy Management NO N.A. N.A. 12 Fire Protection and Fire safety NO N.A. N.A. requirements 13 Electrical meter room, sub station, YES Pending In Process receiving station 14 Others (Options to add more) NO N.A. N.A. Thanking You, Yours Sincerely, Ravindra Hushe Page 3 of 3