Satish V. Patil Chitalkar CHrnxnn a Assocnrrs B.E.(CtVtL)ArutE Stucfurd Engineer CIVIL & STRUCTURAL CONSULTANT Charlered Engineer r Consulting Engineer . Creative 3D Elevations . Surveyo(,lnterior r N.W.C.M.C. Licensed Engineer r Govt. Contractor r Estimates & Valuation . Builder & oeveloper (Lic. No. NWCMC/TP/ST-21 ) Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) Dalei25l07l2026 To, SHREE RAMA CONSTRUCTION Nanded, MAHARASHTRA,43l 605 Subrect: Certiflcate of Cost lncurred for Development of SHREE RAMA TOWNSHIP having MahaRERA Registration Number P51'100077486 (Only Applicable after project Registartion) being developed by SHREE RAMA CONSTRUCTION Ql (April-June) FY 2026-27 Sir, l/!Ve Satish Vilas chitalkar have of Certifying Estimated Cost for SHREE RAMA ToWNSHIP having MahaRERA Registration Number P51 100077486 (Only Applicable after proiect Registration, being developed by SHREE RAMA CoNSTRUCTTON ) 2.We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as p,er specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor. appointed by Developeri Engineer, the assumption ofthe cost of material,labour and other inputs made by developer,and the site inspection carried out by us to ascertain / conlirm the above analysis given to us. 3. We estimate Total estimated the Cost of completion of thc aforesaid project under reference at Rs. 83537952.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to thc Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & exlernal works,as per specifications mentioned in agreements of sale anb for the purpose of the obtaining occupation certificate / completion certificate for the Building(s) /Wing(s)/ Layout /Plotted Development from the NANDED WAGHALA CITY MUNICIPAL CORPORATION being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. 4.The Estimated Cost incured till date is calculated at Rs. 38200000.00 (Total of Table A and B).The amount of Estimated Cost incurred is calculated on the basis of input materjals/services used and unit cost of these items. Page l of4 Nanded' shop No. 1, First Floor, Khandelwal Complex, Opp. Marutadi Dharmshala, Vazirabad' Mob. : 8793250111, 9850760860 | Email : satishchitalkar@gmail com 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate Complition of internal & external works, as per speciflcation mentioned in agreement of sale, of the Project is estimated at Rs 45337952.00 (Total of Table A and B) 6. I certify that the Cost of the Civil, MEP and allied works the for the apartments and proportionate ate internal & external works,as per specification mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Table-A Building/ Wing /Layout Plotted Development bearing Number :SHREE RAMA TOWNSHIP/NA 1 Total Estimated Cost of the Building/VVing/Layout 83537952.00 Plotted Development as on date of Reqistration is 2 38200000.00 Cost incurred as on date of certificate 3 Work done in Percentaqe (as Percentage of the estimated cost) 45.73 4 Balance Cost to be lncurred..(Based on Estimated Cost) 45337952.00 5 Cost lncurred on the Add itiona l/Extra items not included in the 0 Estimated Cost (Table-C) Page 2 ol4 Table B lnternal and External Development Works in respect of the Registered Phase Sr. No. Particulars Amount (ln Rs.) (1) 1 Total Estimated Cost of the Building,ryVing/Layout 0 Plotted Development as on date of Reqistration is 2 Cost incurred as on date of certiricate 0 3 Work done in Percentaqe (as percentaqe of the estimated cost) 0 4 Balance Cost to be lncurred.t(Based on Estimated Cost) 0 5 Cost lncurred on the Additional/Extra items not included in the Estimated Cost (Tablc -C) Yours Faithfully 'sAfi$firYtrtdfi i0tiiili{ t KA L srsngr,ulE { [ffi$fiU"ffif;tns) with stamp or Ens,neer ' tl\tot.lesttqro?thh-ts"SighFlhlder or equivalent as per scction 2(u) or thc Acrl .r.,.flr't I . ,.) [. C.i.T r,rG.i;, .-t oqar Auinori&iiiJnsurlu.rTPlNwcMc/sr/ENG/21 (if appticabte) ,;: I i ir r, -. Date of Certificate:25107 12026 Agreed and Accepted by: x2-=- ffiS,Il#ttrffit"ta$EuBr,o, Date:2510712026 'l.The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2.(') Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor,whose certificate of ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (') and in case quantity are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). 3.(-') Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4.All components of work with speciflcations are indicative and not exhaustive 5.Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Page 3 ot 4 TABLE C List of Extra/Additional/Deleted ltems considered in Cost. (which were not part of the original Estimate of Total Cost) Page 4 of 4