GANESH MORE ARCHITECTS & ASSOCIATES SAt BHAVAN, OPP, OENA BAI{K AIIAND NAGAR CORNER. NANDEO 431602. 94 225 546 62.992240 4662 Annexure A FORM 1 [see Regulation 3] ARCHITECTS CERTIFICATE (To be submitted at the time of Registralion of Ongoing ProJect and for withdrawal of Money from Designated Account) Oatet 2510712026 To, SHREE RAMA CONSTRUCTION NANDED, MAHARASHTRA, 431 605 Subject : Certificate oI percentage of Work of completion of construclion work of SHREE RAMA TOWNSHIP having MahaRERA Registration Number P51 '100077486 (Only Applicable after project Registartion) being devetoped by SHREE RAMA CONSTRUCTION Ql (April-June) FY 2026-27 Sir, l/We GANESH MORE have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of SHREE RAMA TOWNSHIP having MahaRERA Registration Number P51100077486 (Only Applicable after project Registration, being developed by SHREE RAMA CONSTRUCTION ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Pro.iect under MahaRERA ls as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Buildingrvving Number: SHREE RAMA TOWNSHtp/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of lhe Certificate) (1) (2\ (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) 0.00 4 Plinth, 0.00 5 Stilt Floor 100.00 6 Slabs of Super Structure 100.00 7 Internal walls, lnternal plaster, Floorings, FIoors and windows within 60.00 Flals/Premises Sanrtary Fitting within the FlauPremises 40.00 Page 1of3 Sr. No. Tasks/Activity Percentage of Actual Work Done I Staircases. lifts Wells and Lobbies at each Floor level Overhead and 30.00 Underqround Water Ianks 10 External plumbi ng and external plaster, elevation, completion of terraces with 10.00 waterproofinq of the Buildino/wino. 11 lnstallation of Lifts, water pumps, Fire Fighting Fittangs and Equipment as per 0.00 CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environmenuoRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant lo Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specificatjons in agreemeni of Sale. Anv olher activities. Page 2 of3 o o TableB-CommonAreas (lnternal and External or ks) in respect of Registered Phase / Project Number) Sr.No Common areas and facililies ls Available Percentage of Actual Details (Yes / No) Work Done (As on date of the Ceriificate) (1) t2t (3) (4) (5) T lnternal Roads & Footpaths No 0.00 NA 2 Water Supply Yes 0.00 WORK NOT YET TO BE STARTED 3 Sewerage (Chamber, Lines, Septic Tank, STP) Yes 0.00 WORK NOT YET TO BE STARTED 4 Storm Water Draans No 0.00 NA 5 La n & Tree Planti No 0.00 NA 6 Street No 0.00 NA 7 Commu Buildi No 000 NA B Treatment And of And Sul Water No 0.00 NA I Solid Waste M menl And No 0.00 NA 10 Waler conservation /Rain water ha No 0.00 NA 11 E ma No 0.00 NA 12 F ire and fire aements No 0.00 NA 13 Eleclrical meter room, sub-station, receiving statjon Yes 0.00 WORK NOT YET TO BE STARTED 14 499!'egale area of recrealional Open Space No 0.00 NA 15 Open Parkinq No 0.00 NA Yours Faithfully T, lt :,.More r \:.A(Ai tr\] GAtlCt II{OEB(i?e3 Signature & Name (lN BLOCK LETTERS) of L.S/ Architect ( License No: CN20O21302931 Date of Certificate: 2510712026 Agreed and accepted by: Signatu16 ffi,., Name: SHREE RAMA CONSTRUCTION Oale: 2510712026 Page 3 of3