GANESH MORE ARCHITECTS & ASSOCIATES OPP.BOB BAITK ANAI{ DIIAGARCSRTI ER, N^NOE0431502. 9422551662,9922404*2 FORM 1 Reg ' No'cA/2002/30293 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of RegistratLn of Ongoing project and for withdrawal of Money from the Designated -ncco"unt;- Date: 20/07 /2025 To, The M/s Shree Rama Construction, Nanded. Subject: certificate of percentage of compretion of construction work of shree Rama Township having MahaRERA Registration Number p511000774gG being developed by M/s Shree Rama Construction e1 (Apr_Jun) 2025-26 S ir, I/l#e.Ar.Ganesh More have undertaken assignment as Arch itect/Licensed surveyor of certifying percentage of completion of construction work shree Rama Township having I4ahaRERA Registration Number p511000774g6 being developed by M/s Shree Rama Construction. Based on Site Inspection. with respect to Layout each of / the Building/Wing of the aforesaid Rear Estate project. r certify th;t as on the date of this .i.tiri.lt", the Percentage of work done for each of the buirding/wing of the n""r Project under rvrahaRERA is as per Tabre A herein ber6w. rn" p"r."ntug" -i irLt" work executed with respect to each of the activity of the entire phase ih" iJ detaired in Table B. PaBe l1 Table A Lavout/Building/Wing Number "Shree Rama Township" G) be prepared separately for each Lavout /Building /Wing of the Prolect) Perce nta ge Sr. of Actual work Tasks /Activity done (as on the No (1) (2) date of certificate) (3) 1 Excavation 100 2 Basements (if any) 100 I 3 Pod iu ms (if any) NA 4 Plinth 00 5 Stilt Floor 100 6 Slabs of Super Structu re 70 7 lnternal walls, Internal Plaster, Floorings, Doors and 30 I Windows within Flats/Prem ises 8 Sanitary Fittings within the Flat/Premises 00 I Staircases, Lifts Wells and Lobbies at each Floor level 00 Overhead and Underground Water Tanks t' I I I I l"l The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing, 00 I 11 Installation of lifts, water pumps, Fire Fighting Fittings 00 and Equipment as per CFO NOC, Electrical fittings, I mechanical equipment, Compliance to conditions of I environment /CRZ NOC, Finishing to entrance lobby/s, I plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as 1 per specifications in agreement of sale. Any other activities Page l2 TABLE-B Common Areas f nternal & External DeveloDment orks) in ResDect of the Reo stered P h ase / Droiect number Percentage l,.l I of Actual Common areas and Proposed work done Details No. (Yes/ No) (as on the (1) Facilities (2) (3) (s) date of I certificate) (4) 1 I nterna I Roads & No NA Footpaths I 2 Water Supply Yes 00 Sewerage (chamber, 13 lines, Septic Tank, STP) | Yes 00 I I 1 Storm Water Drains Yes 00 I 5 La ndsca ping & Tree No NA Planting 6 Street Liq htinq No NA 7 Community Buildings No NA 8 Treatment and disposal No NA I I of sewage and su llage water I 9 Solid Waste No NA management & Disposal 10. Water co nse rvation/ Yes NA Rain water ha rvesting 11 Energy management No NA I I 12. Fire protection and fire Yes 00 safety req u irements I 13. Electrical meter room, Yes 00 sub-station receiving I I station I 14. Others (option to add No NA I more) I I Page l3 Yours faithfu lly, For, Ganesh More and Associates .{; ,l Ar.Ganesh S. iiore 'c.i \g Ar. Ga nesh ore ) (Proprietor) -/ 4 Il( Local Authority License No.:- CA/2O02/3O293 Agreed and Accepted by: M/s Shree Rama Construction SHREER.ATA c0l{sTRUCnoil k-- $g?ilyre of Promoter Name: Mr. Kamlesh Ashokrao Amravatkar Date: 20/07 /2025 Page l4