lPr: GANESH MORE ARCHITECTS & ASSOCIATES SAIBHAVAI'I, OPP.BOB BANK ANANONAGARCORNER, NANOED43r502. 22554652,9922404662. FORM 1 (See Regulation 3) Re9.No.CA,/2002/30293 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing project and for wlthdrawal of Money from the Designated Account) Date:20/O4/2O25 To, The M/s Shree Rama Construction, Nanded. subject: certificate of Percentage of completion of construction work of shree Rama Township having MahaRERA Registration Number p51100077486 being developed by M/s Shree Rama Construction e4 (Jan-March) ZO24-25 Sir, I/l#e.Ar,Ganesh More have undertaken assignment as Arch itect/Licensed surveyor of certifying Percentage of compretion of construction work shree Rama Township having MahaRERA Registration Number p5I1000774g6 being developed by M/s Shree Rama Construction. Based on Site Inspection. with respect to Layout / each of the Building/Wing of the aforesaid Real Estate project. I certify that as on the date of this certiricite, the Percentage of work done for each of the building/wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase iJ detailed in Table B. Page l1 Table A Lavout/Buildin g/wing Number "Shree Rama Township,, (to be prepared separatelv for each Lavout /Buildino /Winq of the project) Percentage Sr. of Actual work No Tasks /Activity done (as on the (1) (2) date of certifacate) (3) L Excavation 100 2 Basements (if any) 100 3 Podiums (if any) NA 4 Plinth 00 5 Stilt Floor 100 6 Slabs of Su per Structu re 50 7 Internal walls, Internal Plaster, Floorings, Doors and 10 Windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 00 9 Staircases, Lifts Wells and Lobbies at each Floor level 00 Overhead and Underground Water Tanks 10 The external plumbing and external plaster, elevation, 00 completion of terraces with waterproofing of the Building/Wing, 11 Installation of Iifts, water pumps, Fire Fightjng Fittings 00 and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities Page | 2 TAB LE- B Common as (Internal & Extern I DeveloDment Works) in Respect of the Reoistered Phase/proiect number Percentage l,.l In". Common areas and Proposed (Yes/ No) of Actual Work done (as on the Deta i ls Facilities (2) l (3) date of (s) l,',1 certificate) (4) 1 Internal Roads & No NA I Footpaths 2 Water Supply Yes 00 3 Sewerage (chamber, Yes 00 I lines, Septic Tank, STP) 4 Storm Water Drains Yes 00 5. Landscaping & Tree No NA P la ntin q 6 Street Liq htinq No NA 7 Community Buildings No NA 8 Treatment and disposal No NA of sewage and sullaqe water e. Solid I Waste No NA management & Disposal I 10 Water conservation/ Yes NA Rain water ha rvesting 11. Energy management No NA t2 Fire protection and fire Yes 00 safety req u irements 13. Electrical meter room, Yes 00 sub-station receiving station I t4. Others (option to add No NA more) I Page I3 Yours faithfully, For, Ganesh More and Associates anesh S. More I C:tt B.Arch. Ar. Ganesh More C;,12002i30293 j.r (Proprietor) Local Authority License No.:- CA/2O02/30293 Agreed and Accepted by: M/s Shree Rama Construction gHREE RA]IA CONSTRUCTIOI{ SigfilttlUof Promoter Name: Mr. Kamlesh Ashokrao Amravatkar Dare: 20/04/2025 Page l4