_tr GANESH MORE ARCHITECTS & ASSOCIATES \_ SAIBHAVAII, OPP,BOB BAI,|K ANANONAGARCORNER, NANDE0431602, 94 22 55466 2,99 22 4 0 4 662 FORM 1 (See Regulation 3) Reg.No.CA,/2002/30293 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing project and for withdrawal of Money from the Designated nccoiunt) Date: 20/07/2025 To, The M/s Shree Rama Construction, Nanded. subject: certificate of percentage of compretion of construction work of shree Rama Township having rvlahaRERA Registration Number p511000774g6 being developed by M/s Shree Rama Construction e3 (Oct_De c) 2OZ4_25 Sir, I/l#e.Ar.Ganesh More have undertaken assignment as Arch itect/Licensed Surveyor of certifying percentage of Completion of construction work shree Rama Township having MahaRERA Registration Number ps11000774gG being developed by M/s Shree Rama Construction. Based on Site Inspection. wath respect to Layout / each of the Building/Wing of the aforesaid Rear Estate project. I certify thit as on the date of this .1.tiri.]t", the Percentage of work done for each of the buirding/wing of the Rear Estate Project under MahaRERA is as per Tabre A herein ber6w. rhe p"rcentage oi ihe work executed with respect to each of the activity of the entire phase iJ detaired in Table B. Page l1 Table A Lavout/Buildin g/Wing Number "Shree Rama Township,, (to be prepared separately for each Layout /Buildino /Wino of the project) Percentage Sr. of Actual work No Tasks /Activity done (as on the (1) (2) date of certificate) (3) 1 Excavation 100 2 Basements if an 100 3 Pod iu ms if an NA 4 Plinth 00 5 Stilt Floor 100 6 Slabs of Su er Structu re 30 7 Internal walls, Internal Plaster, Floorings, Doors and 00 Windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 00 9 Staircases, Lifts Wells and Lobbies at each Floor level 00 Overhead and Underground Water Tanks 10 The external plumbing and external plaster, elevation, 00 completion of terraces with waterproofing of the Building/Wing. 11 Installation of lifts, water pumps, Fire Fighting Fittings 00 and Equipment as per CFO NOC, Electrical fittings, I mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities Page l2 TABLE-B Common A as ( Interna I & Extern I Develooment Works) in ResDect of the Reoistered Phase/Droiect number Percentage of Actual Sr. Proposed Work done Common areas and Details No. (Yes/ No) (as on the (1) Facilities (2) (s) (3) date of certificate) (4) 1. Internal Roads & No NA Footpaths I 2 Water Supply Yes 00 3 Sewerage (chamber, Yes 00 lines, Septic Tank, STP) 4. Storm Water D ra ins Yes 00 5 La ndsca ping & Tree No NA Planting 6 Street Liq htinq No NA 7 Community Buildings No NA 8 Treatment and disposal No NA of sewage and sullage water 9 Solid Waste No NA management & Disposal I 10. Water conservation/ Yes NA Rain water ha rvesting 11 Energy management No NA 72 Fire protection and fire Yes 00 safety requirements 13. Electrical meter room, Yes 00 sub-station rece iving station 74. Others ( option to add No NA more) I Page l3 Yours faithfu lly, For, Ganesh More and Associates u )t, f' e l. Ganesh S. I/ore \a Ar. Ganesh More ts.Arch. 4: (Proprietor) CN2A02130293 7 \ Local Authority License No.:- CA/2002/3O2 U Agreed and Accepted by: M/s Shree Rama Construction atlRIE RAlrlA CiN$Tr,!rlTi! :i t, ?ture of Promoter Name: Mr. Kamlesh Ashokrao Amravatkar Dare: 20/01 /2025 Page l4