Shyam N Kadam Mb. 7620620428 Consultant Eng. Re8.No.TP^'IWMC/S1-91 KADAM ASSOCIATES ADD : At. Sambhaji Chowk, Cidco Nanded Email Id : shyamkadam 169(agnail. com FORM 2 (UT) ENGINEERS CERTIFICATE (To be submitted at the time of Registration of ongoing Project and for withdrawal of Money from Designated Account - Project wise) Date:20.09.2019 To, The Kishor B. Puved, At Kamtha (KD). To. & Dist. Nanded. Subject: Certificate of Cost lncurred for Development of (Project Name) for Construction of Residential building (s) qlwing (s) ot the gaPhase Situated on the Plot bearing C.N. No./CTS no./ Final Plot no Gut No -123 PIot demarcated by its boundaries (latitude and longitude ofthe end points) Eqad to the North, Propertv of Teachers Colonv to the South, Plot No. - 41 to the East & Propertv of Jadhav to the Wesi ofVillage Taroda (kh) Taluka Nanded District Nanded Pin 4gl!!5 admeasuring 278.81 sq.mts: Area beino developed bV K K Builders & Developers. 8qL: lvlaha RERA Registr!:ti)r Number: Applyinq for Reqistration Sir, lA /e Shvam. N. Kadarn have undertaken assignment of certifying Estimated Cost for ihe Subject Real Estate Project proposed to be registered under I\,4ahaRERA, being Residential Building Ql Wing of the 0'1 Phase situateci on the Plot bearing C.N. No./CTS PaBe l of4 no./Survey no./ Final Plot no. Gut no.123 Plot no.42 of Village Taroda (Kh.) Taluka Nanded District Nanded Pin 431605 admeasuring 27B.Bl sq.mts. Area being development byKK Builders & developers. Following technical professional are appointed by Owner / Promoter : i. M/s /Shri /Smt Raikumar c.Ranvirkar L.S / Architect ; ii. [/]/s/ Shri / Smt as Structural Consultant iii. lvl/s /Shri/Smt as MEP Consultant iv. M/s / Shri /Smt Eleltgllwagh m re as Ouaftity SJrveyor' a We have esiimated the cost of the completion to obtain Occupation Certificate / Comp eiion cost calculations, of Civil, [,4EP and Allied Works, of the Building of the Project. Our estimaied cosi calculations are based on the Drawings/ plans made available io us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Pramod Waohmare quaniity Surveyol appointed by Developer / Engineer, and the assurnptlon of the cost of material, labour and other inputs made by developer, and the siie insoection carried out by us. 3. We estimate Total Estimated Cost of completion of the building of the aforesald project under reference as Rs. 60,99.000.00 (Total of Table A & B). The estimated Total Cost of Project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion Certificate for the building form the being the Plarnirg Autl-o .ty urder trrose jurisdiction the aforesaid project is being imp emented. 4. The Eslimated Cost lncurred till date is Calculaied at Rs.60,99,000.00 (Total of TableA & B). The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance Cost of Completion of Civil, EP and Allied works of ihe Building (s) of the l\.4 subject project to obtain Occupation Certificate / Ccrnpletion Certificate frorn (Planning Auihority) is estimated at Rs. 60, 99,000.00 (Total of Table A&B). 6 I Cedify that the Cost of the Civil , N,4EP and al ied work for the aforesaid Projeci as completed on the date of this Cenificate is as given in Table A and B below: Page 2 of4 OCIATES Shyam N. Kadem CONSULIITiG EXGIIIEER Rsg.l{o. TP/IIWICrS.I 9i rABLE A Building / Wing bearing Number qlor called 01 (To be prepared separately for each Building / Wing of the Real Estate Project) Sr. No. Particulals Amounts 1 Total Estimated cost of the building / wing AS on Rs.60,99,000 20/09/20'19 date of Registration 2 Cost incurred as on 20.09.2019 Rs. 9,14,850 (based on the Estimated Cost) 3 Work done in Percentage 15.00 % 4 Balance Cost to be lncurred Rs. 51,84,150 5 Cost lncurred on Additional / Extra ltems AS on RS, NIL 20.09.2019 not included in the Estimated Cost. TABLE B (to be prepared for each registered phase of the Real Estate Project) Sr.No. Particulars Amou nts Total Estimated cost of the internal & external RS, N IL development works including amenities & Facilities in the layout as on 20.09.2019 date of Registration is 2 Cost incurred as on 20 09.2019 Rs. NIL (based on the Estrrnat-^d Cost) 3 Work done in Percentage Rs NIL 4 Balance Cost to be lncurted RS, NIL 5 Cost lncurred on Additional / Extra ltems on Rs. NIL 20.09.2019 noi included in the Esiimated Cosi. Yours Faithfully $rL rnomKs6crnres Shyam N. Kadall- pdgp3ot4 CCNSULTING EiIGINEER ri"g.r,lo. rprruwiiiili;r Note 1. The scope oi work is to complete entire Real Estate project as per drawings approved from time to time so as to obtain Occupation Certificate / Completion Certificate. 2 (.) Quantiiy Surveyor can be done by office of Engineer or can be done by an independent Quantity Surveyor. ln Case of lndependent quantity Surveyor being appointed by Developer the name has to be mentioned at the place marked (*) and in case quantity are being calculaied by office of calculated should be mentioned at the place marked (*). The estimated cost includes all labour, material, equipment and machinery required io carry out eniire work. As this is an estimated cost , any deviation in quantity required for development of the real estate Project will resuli in amendment of the cost incurred/ to be incurred. All components of work wiih specification are indicative and not exhaustive l{3D IATES Snyan l+. faaiar .cottlSULTi4(; er,lcl}rlin jieg.No. Tptr,tWMC/S-I 9.1 Page 4 of4