Mobiie 0q890899598 R. R. ASSOCIATES lTsl,Lusr_rI"L & cr vr L CoNSULTANCY I\, W.C"M.C. RFCD,ENC YADAV SANKUI,, V.I.P. ROAD NEW MONDHA ,O*;; - rajkumarranvirkar253@gmail.com ANNEXURE- A Ref No. FORM 1 (Ur) (ARCHITECT CERTIFICATE, Date:- (To be submitted at the time of Registration of ongoing project and for withdrawal of money from Designated Account ) To Date:_ The Kishor B. puyed At. Kamtha (Kd) Tq. & Dist.Nanded subject:- certificate of the p€rcenwe of construction work of Residential No. of Building {s) or wings of the 01 phase of the Project { Maha RERA Registration Number situated } on the plot bearing C.N. No. / CfS N9.6uvery No./Finat plot No. Gut No. 123 ptot No. 42 demarcated by its boundaries (ratitude and rongitude of the end points) Road to the North Teacher colony the south plot No. 4t to the East................ To the West of village Jadhav Home Taluka Nanded Distirct Nanded prN 431G05 admeasuring z7g,gt sq Mts area being developed by {promoters Name I . 7 filf 4t^u ;W Sir, l/We Rajkumar G. Ranvirkar have undertaken assignment as Archietct / Licensed Sureveyor of certifying percentage of Completion of Construction Work of the Rest Building (2) Wings of Phase of the project situated on the plot bearing C.N. /CTS No. Survey Noo/ Final Plot No. Gut No. 123 plot No 42 of village Taroda (Kd) Taluka Nanded District Nanded pin Code 431605 Admeasuring 278.8\ sq mts area being developed by { promoter Name } 1. Following technical profession are appointed by Owner/Promoter :- (i) M/s/Shri/Smt. Rajkumar G. Ranvirkar as L.S/Architect (ii) M/s/Shri/Smt.......................... AsStructural Consultant (iii) M/s/Shri/Smt..............,,............OfMEPConsultanr (iv) M/s/Shri/Smt Pramod Waghmare as site Supervisor Based on site inspection with respect to each of building/ Wlng of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate project as registered vide Number........ under MahaRERA is as per table A herein below. The percentage of the work executed to each of the activity of the entire phase is detailed in the Table B Table A Building/Wings Number Shri Appartment (to be prepared separately for each Building/Wings of the project_) Sr. No. Tasks/Activity Percentage of work Done 7. Excavation LOOo/o 2. 01 number of Basements (s) and Plinth 100% 3. 02 number of Podiums 70o/o 4. Stilt Floor 70o/o 5. 01 Nurnber of Slabs of Super Structure 4A% 6. lnternal walls, lnternal Plaster, Flooring within Flats/ Premises Doors and Windows each of the Flat Premises Sanitary Fitting within the Flatt' Fremises Electrical Fittings within the Flat/Premises 8. Staircase, Lift Wells and Lobbies of each Floor 40% Level connecting Staircase and lifts overhead anci Underground Water Tank 9. The External plumbing and External Plaster elevation, completion of the terraces with water proofing of the Buildings/Wing 10, lnstallation of lift, water, puffip, fire Fightting Fittings and Equipment as per CFO NOC, Electrical Fitting to Common Areas, electro, 10% Mechanical equipment, Compliance to conditions of environment /CRZ NOC Finishing to entrance lobby plinth protection, paving of areas apartment to Building/Wing, Compound WEall and All other requirements may by required to obtain occupation/completion Certificate TABLE _B lnternal & External Development work in Respect of the entire Registered Phase Sr Commons area and Proposed Perrentege Details No. facilities, Amenities (Yes/ No,) of work done t. lnternal Roads, & No Footpaths 2. Water supply Yes 0 ln Progress 3. Sewage (Chamber, Lines, Yes 0 ln Progress Ad / &-d Rajkumar 6Ranvirkai R.No. TP/NwCMCIS-l/92 Regd.Architecl DIM t Consulting Enineer YAOAV SANKUL V.I.P ROAD NEW MONOHA. NANDEI Cell No.0989089959E Sepptic Tank, STP) 4. Strom Water Drains Yes 0 ln Progress 5. Landscaping & Tree Yes 0 ln Progress Planting 6. Street Lighting No 7. Community Building No 8. Treatment and disposal of Yes 0 ln Progress sewage and sullage water 9. Soild Waste management No & Disposal 10. Water Conservation Rain Yes 0 ln Progress water harvesting Lt. Energy management No 72. Fire protection and fire Yes 0 ln Progress safety requirements 13. Electrical meter room,sub- Yes 0 ln Progress station, receiving station 14. Others (Option to Add No. more ) Yours Faithfullv RAJKUMAR G. RANVIRKAR (License No. 51/92) #{ffffi