Nanded Waghala Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Building Permit No - 245422 Permit No. : DDMCW/B/2024/APL/03678 Proposal Code : DDMCW-24-14192 Date : 30/03/2024 WING GROUND PARKING FLOOR,TYPICAL FIRST SECOND THIRD FOURTH FIFTH Building Name : Floors : A(Residential) SIXTH FLOOR PLAN WING GROUND PARKING FLOOR,TYPICAL FIRST SECOND THIRD FOURTH FIFTH Building Name : Floors : B(Residential) SIXTH FLOOR PLAN WING GROUND PARKING FLOOR,TYPICAL FIRST SECOND THIRD FOURTH FIFTH Building Name : Floors : C(Residential) SIXTH FLOOR PLAN To, i)Pritam Lalnchankumar Kandi , Laxmi Prashant Waghmare, PRO RESIDENTIAL BUILDING ON GUT NO 213 (PT) MO TARODA KH NANDED ii) Amarnath Ibitdar (Engineer) Sir/Madam, With reference to your application No DDMCW202400140, dated 16-02-2024 for the grant of sanction of Commencement Certificate under Section 18/44 of The Maharashtra Regional and Town Planning Act, 1966 read with - , to carry out development work / Building on Plot No GUT NO 213 (PT), City Survey No./Survey No./Revenue S.No./Khasra No./Gut No. GUT NO 213 (PT), Final Plot No. GUT NO 213 (PT), Sector No. , Mouje MO TARODA KH NANDED situated at Road / Street , Society . The Commencement Certificate / Building Permit is granted under Section 18/45 of the said Act, subject to the following conditions : 1. The land vacated in consequence of the enforcement of the set back line shall form part of the public street. 2. No new building or part thereof shall be occupied or allowed to be occupied or permitted to be used by any person until Occupancy permission has been granted. 3. The Development permission/Commencement Certificate shall remain valid for a period of one year commencing from the date of its issue. 4. This permission does not entitle you to develop the land which does not vest in you. 5. This permission is being issued as per the provisions of UDCPR. If any permission is required to be obtained from any department of the state or central government under the provisions of any other laws / rules , it shall be binding on the owner/ developer to obtain such permission from the concerned authority. 6. Information Board to be displayed at site till Occupation Certificate. 7. If in the development permission reserved land/amenity space/road widening land is to be handed over to the authority in the lieu of DEVELOPMENT RIGHTS if any, then necessary possession receipt, registered transfer deed alongwith change in name on record of rights shall be executed in the name of authority with in 6 month from the commencement certificate. 8. All the provision mentioned in UDCPR,as may be applicable, shall be binding on the owner/developer. 9. Provision for recycling of Gray water ,where ever applicable shall be completed prior to completion certificate and design, drawing with completion certificate shall be submitted along with the application for occupancy certificate. 10. Lift Certificate from PWD should be submitted before Occupation Certificate, if applicable. 11. Permission for cutting of tree, if necessary, shall be obtained from the tree authority. Also the certificate/letter for plantation of trees on the land, if required under the provision of tree act, shall be submitted before occupation certificate. 12. All guidelines mentioned in the environment and forest climate change department, Govt. of Maharashtra, letter no CAP-2023/CR-170,TC-2, shall be followed, if applicable 1/2 Nanded Waghala Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Building Permit No - 245422 Permit No. : DDMCW/B/2024/APL/03678 Proposal Code : DDMCW-24-14192 Date : 30/03/2024 13. Authority will not supply water for construction. 14. Areas/cities where storm water drainage system exists or designed, design and drawings from Service consultant for storm water drainage should be submitted to the concerned department of the authority before Commencement of the work and completion certificate of the consultant in this regard shall be submitted along with the application for occupancy certificate. 15. The owner/developer shall submit the completion certificate from the service consultant for completion of the septic tank or proper connection to the sewerage system of the authority or sewage treatment plant (where ever necessary) 16. If it is observed that permission is obtained by submitting fake or false documents it will be cancelled automatically 17. If it is observed that location shown on part of development plan is not correct permission will be cancelled automatically Municipal Commissioner, Nanded Waghala Municipal Corporation, Scan QR code for verification of authenticity. 2/2