KAPAIL KAMAII BHARTI GOPAL CHAVDI, CIDCO, NANDED- 431601 MOB N0. 8788591316 AnnexureB FORM 2 [see Regulation 3| ENGINEER'SCERTIFICATE (TobesubmittedatthetimeofRegistrationofOngoingProjectandforwithdrawalofMoneyfrom Designated Account-Project Wise) Date: 02.06.2026 To, ms developers Nanded, MAHARASHTRA,431602 Subject: Certificate of Cost Incurred for Development of Prayagraj A having MahaRERA Registration Number PS1100055397 (Only Applicable after project Registartion) being developed by ms developers Sir, VWe Kapil KamajiBharti have of Certifying Estimated Cost for PrayagrajA having MahaRERA Registration Number P51100055397 (Only Applicable after project Registration, being developed by msdevelopers ) 2 We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engincer, the assumption ofthe cost of material,labour and other inputs made by developer ,and the site inspection carried out by us to ascertain /confirm the above analysis given to us. 3. We estimate Total estimated the Cost of completion of thc aforesaid projcct under reference at Rs. 28000000.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost ofproject is with reference to the Civil., MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreements of sale and for the purpose of the obtaining occupation certificate / Page 1 of4 completion certificate for the Building(s) Wing(s)/ Layout/ Plotted Development from the Nanded Waghala Municipal Corporation being the Planning Authority under whose jurisidiction the aforesaid project is bcing implemented. 4. The Estimated Cost incured till date is calculatcd at Rs. 7500000.00 (Total of Table A and B). The amount of Estimated Cost incurrecd is calculated on the basis of input materials/services used and unit cost of these items. 5.The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate Complition of internal & external works, as per specification mentioned in agreement of sale,of the Project is estimated at Rs 20500000.00 (Total of Table A and B) 6. I certifythat the Cost of the Civil, MEP and allied works the for the apartments and proportionate ate internal & externalworks,as per specification mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: Table-A Building Wing /Layout Plotted Development bearing Number :Prayagraj A/NA Sr. No. Particulars Amount (In Rs.) Total Estimated Cost of the Building/Wing/Layout Plotted |Development as on date of Registration is 28000000.00 2 Cost incurred as on date of certificate 7500000.00 3 Work done in Percentage (as Percentage of the estimated 26.79 |cost) 4 Balance Cost to be Incurred**(Based on Estimated Cost) 20500000.00 Cost Incurred on the Additional /Extra items not included in the Estimated Cost (Table-C) 0 Table B Internal and ExternalDevelopment Works in respect of the Registered Phase Sr. No. Particulars Amount (1) (In Rs.) Total Estimated Cost of the Building/Wing/Layout Plotted Development 0 as on date of Registration is |Cost incurred as on date of certificate Work done in Percentage (as percentage of the estimated cost) 4 Balance Cost to be Incurred**(Based on Estimated Cost) 5 | Cost Incurred on the Additional /Extratems not included in the Estimated Cost (Table -C) Eharati Ch Yours Faithfully KAPIL KAMAJI KHAKATI KAPILKAMAJIBHARTI Signature & Name (IN BLOCK LETTERS) Cidcosmp Nandeof Engineer [Not Less than bachelor's Degree Holder or cquivalent as per Scction 2(u)of thc Act]Local Authority license no.(if applicable) Date of Certificate: Agreed and Accepted by: Signature of Promoter M/s. M. S. Developers Namermsdevelopers Partner Date: 1.The scope of work is to complete Registercd Real Estate Project as per drawings approved rom tỉmeto time and as per specifications mentioned in agreement of sale. 2..(*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Enginecr, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3.(**) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviaion in quantity required / escalation of cost ete. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4.Allcomponcnts of workwith specifications are indicative and not exhaustive 5. Please specify if there are any deviations / qualifications. Example :Any deviations in input material used from specilications in agreement of sale. TABLEC List of Extra/Additional/Deleted Items considered in Cost. (which were not part of the original Estimate of Total Cost) Page 1 of4