GANESHMORE ARCHITECTS&ASSOCIATES SAIBHAVAN, OPP.DENABANK ANANDNAGARCORNER, NANDED431602. 9422554662,9922404662. Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 30.06.2026 To, MSDEVELOPERS NANDED, MAHARASHTRA, 431602 Subject : Certificate of percentage of Work of completion of construction work of Prayagraj A having MahaRERA Registration Number 51100055397 (Only Applicable after project Registartion) being developed by MSDEVELOPERS Sir, I/We GANESH MORE have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of Prayagraj A having MahaRERA Registration Number P51100055397 (Only Applicable after project Registration, being developed by MSDEVELOPERS ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing Number: Prayagraj A/NA Sr. Tasks/Activity Percentage of Actual No. Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 100.00 3 Podiums (if any) 0.00 4 Plinth, 100.00 5 Stilt Floor 100.00 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, 60.00 Floors and windows within Flats/Premises 8 Sanitary Fitting within the Flat/Premises 60.00 9 Staircases, lifts Wells and Lobbies at 50.00 each Floor level Overhead and Underground Water Tanks 10 External plumbing and external plaster, 50.00 elevation, completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire 10.00 Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection ,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table B - Common Areas (Internal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and Is Available Percentage Details facilities (Yes / No) of Actual Work done (As on date of the Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & No 0.00 NA Footpaths 2 Water Supply Yes 50.00 Borewell 3 Sewerage Yes 50.00 Chamber line (Chamber, Lines, Septic Tank , STP) 4 Storm Water Drains No 0.00 NA 5 Landscaping & Tree No 0.00 NA Planting 6 Street Lighting No 0.00 NA 7 Community Buildings No 0.00 NA 8 Treatment And No 0.00 NA Disposal Of Sewage And Sullage Water 9 Solid Waste No 0.00 NA Management And Disposal 10 Water conservation No 0.00 NA /Rain water harvesting 11 Energy managemcnt No 0.00 NA 12 Fire protection and Yes 0.00 Fire Safety fire safety requirements requirements 13 Electrical meter Yes 0.00 Sub Station room, sub-station, receiving receiving station Station 14 Aggregate area of No 0.00 NA recreational Open Space 15 Open Parking Yes 0.00 Work in Progress