GANESHMORE ARCHITECTS&ASSOCIATES SAIBHAVAN, OPP.DENABANK ANANDNAGARCORNER, ANDED431602. 9422554662, 9922404662. FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 20/04/2025 To, The M/s MS Developers, Add:H.No. 26 /B, SHANKAR NIWAS, Somesh Colony, Near Govt.Rest House, Nanded-431602, Subject: Certificate of Percentage of Completion of Construction Work of Prayagraj A having MahaRERA Registration Number P51100055397 being developed by M/s MS Developers (Q-4(January-March) 2024-25) Sir, I Ganesh S. More & associates have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of Prayagraj A having MahaRERA Registration Number P51100055397 being developed by M/s M S Developers Based on Site Inspection, with respect to Layout/each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Page 1 TABLE-A Layout/Building/Wing Number “ Prayagraj A” (to be prepared separately for each Building /Wing of the Project) Sr. Tasks /Activity Percentage of Actual No. (2) Work Done (As on (1) date of the Certificate) (3) 1 Excavation 100 2 Basement (if any) 100 3 Podiums (if any) NA 4 Plinth 100 5 Stilt Floor 00 6 Slabs of Super Structure 40 7 Internal walls, Internal Plaster, Floorings, Doors and 00 Windows within Flats/Premises 8 Sanitary Fittings within the Flat/Premises 10 9 Staircases, Lifts Wells and Lobbies at each 00 Floor level, Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 00 Completion of terraces with waterproofing of the Building/Wing 11 Installation of Lifts, water pumps, Fire Fighting Fittings 00 and Equipment as per CFO NOC, Electrical fittings, Mechanical Equipment, compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in Agreement of Sale. Any other activities. Page 2 TABLE-B Common Areas (Internal & External Development Works) in respect of the entire Registered Phase/Project Number P51100055397 Sr.N Common areas and Facilities, Proposed Percentage of Details o. Amenities (Yes/No) Actual Work Done (As on date of the Certificate) (1) (2) (3) (4) (5) 1 Internal Roads & Footpaths No NA 2 Water Supply YES 00 3 Sewerage (Chamber lines, Septic YES 00 Tank, STP) 4 Storm Water Drains NO NA 5 Landscaping & Tree Planting NO NA 6 Street Lighting NO NA 7 Community Buildings NO NA 8 Treatment and disposal of sewage NO NA and sullage water 9 Solid Waste management & NO NA Disposal 10 Water conservation, Rain water NO NA harvesting 11 Energy management NO NA 12 Fire protection and fire safety NO NA requirements 13 Electrical meter room, sub-station, NO NA receiving station 14 Others (Option to Add more) NO NA Page 3