Nanded Waghala Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Revised Building Permit No - 260981 Permit No. : DDMCW/RB/2024/APL/00042 Proposal Code : DDMCW-23-105252 Date : 25/05/2024 Reference:- Building Permission No. : DDMCW/B/2024/APL/03624 Approval date : 09/03/2024 SANGAM PARKING FLOOR PLAN,FIRST FLOOR PLAN,TYPICAL SECOND TO SEVENTH Building Name : Floors : DEVELOPERS(Residential) FLOOR PLAN To, i)Pravin Omprakash Pokarna,sheshrao Gangadhar Fadse,venkatesh Laxmanrao Parsewar, PLOT NO.40,41,50&51,GUT NO.236,AT-KAUTHA,NANDED. ii) Sachin Bhasme (Architect) Sir/Madam, With reference to your application No RDDMCW202400477, dated 28-04-2024 for the grant of Revised Building Permission & Commencement Certificate under Section 18/44 of The Maharashtra Regional and Town Planning Act, 1966 read with Maharashtra Municipal Corporations Act, 1949 , to carry out development work / Building on Plot No 40,41,50&51, City Survey No./Survey No./Revenue S.No./Khasra No./Gut No. 236, Final Plot No. 40,41,50&51, Sector No. -, Mouje KAUTHA situated at Road / Street -, Society KAUTHA . The Commencement Certificate / Building Permit is granted under Section 18/45 of the said Act, subject to the following conditions : 1. The land vacated in consequence of the enforcement of the set back line shall form part of the public street. 2. No new building or part thereof shall be occupied or allowed to be occupied or permitted to be used by any person until Occupancy permission has been granted. 3. The Development permission/Commencement Certificate shall remain valid for a period of one year commencing from the date of its issue. 4. This permission does not entitle you to develop the land which does not vest in you. 5. This permission is being issued as per the provisions of sanctioned Development Plan and Development Control Regulations. Any other statutory permission, as required from State and Central Govt. Departments/ undertakings shall be taken by the applicant. If any irregularity is found at later date, the permission shall stand cancelled. 6. Information Board to be displayed at site till Occupation Certificate. 7. If in the development permission reserved land/amenity space/road winding land is to be handed over to the authority in the lieu of incentive FSI, if any, then necessary registered transfer deed shall be executed in the name of authority with in 6 month from the commencement certificate. 8. All the provision mentioned in UDCPR,as may be applicable, shall be binding on the owner/developer. 9. Provision for recycling of Gray water , where ever applicable shall be completed of the project before completion of the building and documents to that if at shall be submitted along with the application form of occupancy. 10. Lift Certificate from PWD should be submitted before Occupation Certificate, if applicable. 11. Permission for cutting of tree, if necessary, shall be obtained from the tree authority. Also the certificate/letter for plantation of trees on the land, if required under the provision of tree act, shall be submitted before occupation certificate. 12. All guidelines mentioned in the environment and forest climate change department, Govt. of Maharashtra, letter no CAP-2023/CR-170,TC-2, shall be followed, if applicable 13. Authority will not supply water for construction. 1/2 Nanded Waghala Municipal Corporation APPENDIX D-1 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE Revised Building Permit No - 260981 Permit No. : DDMCW/RB/2024/APL/00042 Proposal Code : DDMCW-23-105252 Date : 25/05/2024 14. Areas/cities where storm water drainage system exists or designed, design and drawings from Service consultant for storm water drainage should be submitted to the concerned department of the authority before Commencement of the work and completion certificate of the consultant in this regard shall be submitted along with the application for occupancy certificate. 15. The owner/developer shall submit the completion certificate from the service consultant for completion of the septic tank or proper connection to the sewerage system of the authority or sewage treatment plant (where ever necessary) 16. If it is observed that permission is obtained by submitting fake or false documents it will be cancelled automatically 17. If it is observed that location shown on part of development plan is not correct permission will be cancelled automatically Signature Not Verified Digitally signed by Dr.Maheshkumar Uttamrao Doiphode Date: 2024.05.25 19:22:28 IST Reason: Approved Certificate Location: Nanded Waghala Municipal Corporation Project Code : DDMCW-23-105252 Application Number : RDDMCW202400477 Proposal Number : 260981 Certificate Number : DDMCW/RB/2024/APL/00042 Municipal Commissioner, Nanded Waghala Municipal Corporation, Scan QR code for verification of authenticity. 2/2