FORM 1 ARCHITECT’S CERTIFICATE Date: 15/04/2026 To M/S. GVC Developers, Nanded. Subject: Certi cate of percentage of Work of completion of construction work of GVC GANGADHAM SKYILA having MahaRERA Registration Number P51100055475 (Only Applicable after project Registration) being developed by GVC DEVELOPERS. Sir, I/We have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of GVC GANGADHAM SKYILA having MahaRERA Registration Number P51100055475 (Only Applicable after project Registration, being developed by GVC DEVELOPERS ) Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project.I certify that as on the date of this certi cate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. . fi fi Table A (GVC GANGADHAM SKYILA) Sr. No. Tasks/Activity Percentage of work done 1 Excavation 100 % 2 Stilt Floor 0% 3 Plinth 100% 4 Podium NA 5 11 number of Slabs of Super Structure, 11 out of 11 100% slabs are completed 6 Internal walls, Internals Plaster, Floorings within Flats/Premises, 95% Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and 95% Underground Water Tanks 9 The External plumbing external plaster, elevation, completion of Terraces with 20% waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings 0% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Certificate Table B - Common Areas (Internal and External Development Works) Common areas and facilities Is Available Percentage of (Yes / No) Actual Work Done Details (As on date of the (2) (3) Certi cate) (4) (5) Internal Roads & Footpaths Yes 0.00 WORK YET TO BE STARTED Water Supply Yes 0.00 WORK YET TO BE STARTED Sewerage (Chamber, Lines, Septic Yes 0.00 WORK YET TO Tank , STP) BE STARTED Storm Water Drains No 0.00 NA Landscaping & Tree Planting Yes 0.00 WORK YET TO BE STARTED Street Lighting Yes 0.00 WORK YET TO BE STARTED Community Buildings No 0.00 NA Treatment And Disposal Of No 0.00 NA Sewage And Sullage Water Solid Waste Management And No 0.00 NA Disposal Water conservation /Rain water Yes 0.00 WORK YET TO harvesting BE STARTED Energy managemcnt Yes 0.00 WORK YET TO BE STARTED Fire protection and re safety Yes 0.00 WORK YET TO requirements BE STARTED Electrical meter room, sub-station, Yes 0.00 WORK YET TO receiving station BE STARTED Aggregate area of recreational No 0.00 NA Open Space 15 Open Parking No 0.00 NA Yours Faithfully AR. SHAILESH P. DANDANE CA/2005/37015. Spiro Designs. fi fi