FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 15/06/2020 To M/S. Shagun Associates, Nanded. Subject: Certi icate of Percentage of Completion of Construction Work for GVC SHAGUN CITY PHASE II for Construction of Residential building MahaRERA Registration Number P51100017950 situated on the Plot bearing Plot No. GUT NO 228 VILLAGE KAUTHA TQ AND DIST NANDED demarcated by its boundaries (latitude- 19.16481090000000” N and longitude - 72.85327150000000“ E of the end points) to the North by GUT NO 228 LAND OF SHIVAJI KALE AND OTHERS, to the South by GUT NO 228 LAND OF K SONTAKKE AND OTHERS, to the East LAND GUT NO 108, to the West by boundary of LAND GUT NO 174 of Division Aurangabad, Village Kautha Taluka- Nanded, District - Nanded , PIN – 431603 admeasuring 2736.00 sq.mts. area being developed by M/S. SHAGUN ASSOCAITES. Sir, I Ar. SOURABH KARANDIKAR, From M/S. PPLANITECH CONSULTANTS have undertaken assignment as Architect of Certifying Percentage of Completion of Construction Work for GVC SHAGUN CITY PHASE II, situated on the Plot No. GUT NO 228, Village Kautha Taluka- Nanded, District - Nanded, being developed by M/S. SHAGUN ASSOCIATES 1. Following technical professionals are appointed by Owner / Promoter :- (i) Mr. SOURABH KARANDIKAR as Architect ; (ii) Mr. SANDESH PATIL as Structural Consultant (iii) Mr. SUNIL SHIRSAT as Site Engineer Based on Site Inspection & information given by site engineer and owner/developers, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide n u m b e r u n d e r M a h a R E R A i s a s p e r t a b l e A h e r e i n b e l o w. T h e percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A (L-1,L-2,L-3,L-4,L-5) Sr. No. Tasks/Activity Percentage of work done f 1 Excavation 100 % 2 Stilt Floor 0% 3 Plinth 100% 4 Podium NA 5 Number of Slabs of Super Structure completed 100% 6 Internal walls, Internals Plaster, Floorings within Flats/Premises, 100% Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 100% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and 100% Underground Water Tanks 9 The External plumbing external plaster, elevation, completion of Terraces 100% with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings 100% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Certificate Table A (L-6,L-7,L-8,L-9,L-10) Sr. No. Tasks/Activity Percentage of work done 1 Excavation 100 % 2 Stilt Floor 0% 3 Plinth 100% 4 Podium NA 5 Number of Slabs of Super Structure completed 100% 6 Internal walls, Internals Plaster, Floorings within Flats/Premises, 100% Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 100% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and 100% Underground Water Tanks 9 The External plumbing external plaster, elevation, completion of Terraces 100% with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings 100% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Certificate Table A (A-1,A-2,A-3,A-4,A-5) Sr. No. Tasks/Activity Percentage of work done 1 Excavation 100 % 2 Stilt Floor 0% 3 Plinth 100% 4 Podium NA 5 Number of Slabs of Super Structure completed 100% 6 Internal walls, Internals Plaster, Floorings within Flats/Premises, 50% Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 25% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and 25% Underground Water Tanks 9 The External plumbing external plaster, elevation, completion of Terraces 25% with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings 0% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Certificate Table A (A-40) Sr. No. Tasks/Activity Percentage of work done 1 Excavation 100 % 2 Stilt Floor 0% 3 Plinth 100% 4 Podium NA 5 Number of Slabs of Super Structure completed 100% 6 Internal walls, Internals Plaster, Floorings within Flats/Premises, 50% Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 25% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and 25% Underground Water Tanks 9 The External plumbing external plaster, elevation, completion of Terraces 25% with waterproofing of the Building/Wing 10 Installation of lifts, water pumps, Fire Fighting Fittings 0% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of area appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Certificate Table B Internal & External Development works in Respect of the entire Registered Phase Sr. No. Common areas and P r o p o s e d Percentage of Work Details Facilities, Amenities (Yes/No) done 1. Internal Roads & Yes 100 Footpaths 2. Water Supply Yes 100% 3. Sewage (chamber, lines, Septic Tank, Yes 100% STP) 4. Storm Water Drains Yes 100% 5. Landscaping & Tree Yes 100% Planting 6. Street Lighting Yes 100 7. C o m m u n i t y No 00 Buildings 8. Treatment and disposal of sewage No 00 and sludge water 9. Solid Waste m a n a g e m e n t & No 00 Disposal 10. Water conservation, Rain W a t e r No 0% harvesting 11. E n e r g y No 00 management 12. Fire protection and fire s a f e t y No 00 requirements 13. Electrical meter room, sub-station, No 0% receiving station 14. Recreational Open Space No 00 15/06/2020