ANNEXEURE A FORM 1 (SEE REGULATION3) ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Account) Date : 6/01/02024 To, The Shewalkar Developers Limited, Plot no.1 sheet no.3 C Plot no.6 sheet no.2D,Wani,Yawatmal-445304 Subject : Certified of Percentage of Completion of Construction work RAM SHEWALKAR PARISAR having MahaRERA Registration Number P51000009928 (Only applicable after Project Registration) being developed by Promoters Name. Sir, I /We Vishwash Gupta have undersigned assignment as Architect/Licensed Surveyor of certifying percentage of completion of construction work of RAM SHEWALKAR PARISAR having MahaRERA registration number P51000009928 (only applicable after project registration being developed by promoter Shewalkar Developers Limited Based on site inspection, with respect to Layout/ each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on date of this certificate, the percentage of work done for each of Building/Wing of the Real Estate Project under MahaRERA is as per TABLE A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in TABLE B. TABLE A Layout/Building/Wing Number _ASHOSHI CLUSTER_( to be prepared separately for each Layout/Building/Wing Project) Sr No. Task / Activity Percentage of Actual Work (1) (2) Done (As on date of the Certificate) (3) 1 Excavation 100 2 Basement (if any) N/A 3 Podium (if any) N/A [Type text] 4 Plinth 100 5 Stilt Floor N/A 6 Slab of Super Structure 100 7 Internal Wall, Internal Plaster, Flooring, Doors & 100 windows within Flats & Premises 8 Sanitary Fitting with Flat & Premises 100 9 Staircase, Lifts Wells and Lobbies at each floor 100 level Overhead and Underground Water Tanks. 10 External Plumbing and External Plaster elevation 100 completion of terraces and waterproofing of the Building Wings. 11 Installation of lifts, water pumps, fire fighting 100 fitting and equipments as per CFO NOC Electrical Fitting, Mechanical equipments, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby, plinth protection paying of area appurtenant to Building Wings. Compound wall and all other requirements as may be required to complete project as per specification in agreement of Sale. Any other activities TABLE B Common Area ( Internal & External DevelopmentWorks) in respect of the Registered Phase / Project Number Sr No. Common Area & Proposed Percentage of Details (1) Facilities Yes/No Actual Work Done (5) (2) (3) (As on date of the Certificate) (4) 1 Internal Road & Yes 100 As per Foothpath sanction 2 Water Supply Yes 100 As per sanction 3 Sewerage (Chamber Yes 100 As per Lines, Septic Tanks, sanction STP) 4 Storm Water Drains Yes 100 As per sanction 5 Landscaping and Tree Yes 100 As per Planting sanction 6 Street Lighting Yes 100 As per sanction 7 Community Building N/A N/A N/A 8 Treatment and N/A N/A N/A Disposal of sewage [Type text] and sullage water 9 Solid waste N/A N/A N/A management & disposal 10 Water Conservation/ N/A N/A Rain Water Harvesting 11 Energy Management N/A N/A N/A 12 Fire protection and fire N/A N/A N/A safety requirements 13 Electrical meter room, Yes 100 As per sub-station, receiving sanction station 14 Other (Option to Add - More) TABLE A Layout/Building/Wing Number _REHGA CLUSTER COMMERCIAL_( to be prepared separately for each Layout/Building/Wing Project) Sr No. Task / Activity Percentage of Actual Work (1) (2) Done (As on date of the Certificate) (3) 1 Excavation 100 2 Basement (if any) N/A 3 Podium (if any) N/A 4 Plinth 100 5 Stilt Floor N/A 6 Slab of Super Structure 100 7 Internal Wall, Internal Plaster, Flooring, Doors & 100 windows within Flats & Premises 8 Sanitary Fitting with Flat & Premises 100 9 Staircase, Lifts Wells and Lobbies at each floor 100 level Overhead and Underground Water Tanks. 10 External Plumbing and External Plaster elevation 100 completion of terraces and waterproofing of the Building Wings. 11 Installation of lifts, water pumps, fire fighting 100 fitting and equipments as per CFO NOC Electrical Fitting, Mechanical equipments, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby, plinth protection paying of area appurtenant to Building Wings. Compound wall [Type text] and all other requirements as may be required to complete project as per specification in agreement of Sale. Any other activities TABLE B Common Area ( Internal & External DevelopmentWorks) in respect of the Registered Phase / Project Number Sr No. Common Area & Proposed Percentage of Details (1) Facilities Yes/No Actual Work Done (5) (2) (3) (As on date of the Certificate) (4) 1 Internal Road & Yes 100 As per Foothpath sanction 2 Water Supply Yes 100 As per sanction 3 Sewerage (Chamber Yes 100 As per Lines, Septic Tanks, sanction STP) 4 Storm Water Drains Yes 100 As per sanction 5 Landscaping and Tree Yes 100 As per Planting sanction 6 Street Lighting Yes 100 As per sanction 7 Community Building N/A N/A N/A 8 Treatment and N/A N/A N/A Disposal of sewage and sullage water 9 Solid waste N/A N/A N/A management & disposal 10 Water Conservation/ N/A N/A N/A Rain Water Harvesting 11 Energy Management N/A N/A N/A 12 Fire protection and fire N/A N/A N/A safety requirements 13 Electrical meter room, Yes 100 As per sub-station, receiving sanction station 14 Other (Option to Add - - - More) [Type text] TABLE A Layout/Building/Wing Number _ AGNIMITRA CLUSTER COMMERCIAL ( to be prepared separately for each Layout/Building/Wing Project) Sr No. Task / Activity Percentage of Actual Work (1) (2) Done (As on date of the Certificate) (3) 1 Excavation 100 2 Basement (if any) N/A 3 Podium (if any) N/A 4 Plinth 100 5 Stilt Floor N/A 6 Slab of Super Structure 100 7 Internal Wall, Internal Plaster, Flooring, Doors & 100 windows within Flats & Premises 8 Sanitary Fitting with Flat & Premises 100 9 Staircase, Lifts Wells and Lobbies at each floor 100 level Overhead and Underground Water Tanks. 10 External Plumbing and External Plaster elevation 100 completion of terraces and waterproofing of the Building Wings. 11 Installation of lifts, water pumps, fire fighting 100 fitting and equipments as per CFO NOC Electrical Fitting, Mechanical equipments, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby, plinth protection paying of area appurtenant to Building Wings. Compound wall and all other requirements as may be required to complete project as per specification in agreement of Sale. Any other activities TABLE B Common Area ( Internal & External DevelopmentWorks) in respect of the Registered Phase / Project Number Sr No. Common Area & Proposed Percentage of Details (1) Facilities Yes/No Actual Work Done (5) (2) (3) (As on date of the Certificate) (4) 1 Internal Road & Yes 100 As per Foothpath sanction [Type text] 2 Water Supply Yes 100 As per sanction 3 Sewerage (Chamber Yes 100 As per Lines, Septic Tanks, sanction STP) 4 Storm Water Drains Yes 100 As per sanction 5 Landscaping and Tree Yes 100 As per Planting sanction 6 Street Lighting Yes 100 As per sanction 7 Community Building N/A N/A N/A 8 Treatment and N/A N/A As per Disposal of sewage sanction and sullage water 9 Solid waste N/A N/A N/A management & disposal 10 Water Conservation/ N/A N/A N/A Rain Water Harvesting 11 Energy Management N/A N/A N/A 12 Fire protection and fire N/A N/A N/A safety requirements 13 Electrical meter room, Yes 100 As per sub-station, receiving sanction station 14 Other (Option to Add - - - More) TABLE A Layout/Building/Wing Number _ AMRUTZARI CLUSTER COMMERCIAL ( to be prepared separately for each Layout/Building/Wing Project) Sr No. Task / Activity Percentage of Actual Work (1) (2) Done (As on date of the Certificate) (3) 1 Excavation 100 2 Basement (if any) N/A 3 Podium (if any) N/A 4 Plinth 100 5 Stilt Floor N/A 6 Slab of Super Structure 100 7 Internal Wall, Internal Plaster, Flooring, Doors & 100 [Type text] windows within Flats & Premises 8 Sanitary Fitting with Flat & Premises 100 9 Staircase, Lifts Wells and Lobbies at each floor 100 level Overhead and Underground Water Tanks. 10 External Plumbing and External Plaster elevation 100 completion of terraces and waterproofing of the Building Wings. 11 Installation of lifts, water pumps, fire fighting 100 fitting and equipments as per CFO NOC Electrical Fitting, Mechanical equipments, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby, plinth protection paying of area appurtenant to Building Wings. Compound wall and all other requirements as may be required to complete project as per specification in agreement of Sale. Any other activities TABLE B Common Area ( Internal & External Development Works) in respect of the Registered Phase / Project Number Sr No. Common Area & Proposed Percentage of Details (1) Facilities Yes/No Actual Work Done (5) (2) (3) (As on date of the Certificate) (4) 1 Internal Road & Yes 100 As per Foothpath sanction 2 Water Supply Yes 100 As per sanction 3 Sewerage (Chamber Yes 100 As per Lines, Septic Tanks, sanction STP) 4 Storm Water Drains Yes 100 As per sanction 5 Landscaping and Tree Yes 100 As per Planting sanction 6 Street Lighting Yes 100 As per sanction 7 Community Building N/A N/A N/A 8 Treatment and N/A N/A N/A Disposal of sewage and sullage water 9 Solid waste N/A N/A N/A management & [Type text] disposal 10 Water Conservation/ N/A N/A N/A Rain Water Harvesting 11 Energy Management N/A N/A N/A 12 Fire protection and fire N/A N/A N/A safety requirements 13 Electrical meter room, Yes 100 As per sub-station, receiving sanction station 14 Other (Option to Add - - - More) TABLE A Layout/Building/Wing Number _ SNEHAGOTRI CLUSTER COMMERCIAL ( to be prepared separately for each Layout/Building/Wing Project) Sr No. Task / Activity Percentage of Actual Work (1) (2) Done (As on date of the Certificate) (3) 1 Excavation 100 2 Basement (if any) N/A 3 Podium (if any) N/A 4 Plinth 100 5 Stilt Floor N/A 6 Slab of Super Structure 100 7 Internal Wall, Internal Plaster, Flooring, Doors & 100 windows within Flats & Premises 8 Sanitary Fitting with Flat & Premises 100 9 Staircase, Lifts Wells and Lobbies at each floor 100 level Overhead and Underground Water Tanks. 10 External Plumbing and External Plaster elevation 100 completion of terraces and waterproofing of the Building Wings. 11 Installation of lifts, water pumps, firefighting fitting 100 and equipments as per CFO NOC Electrical Fitting, Mechanical equipments, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby, plinth protection paying of area appurtenant to Building Wings. Compound wall and all other requirements as may be required to complete project as per specification in agreement of Sale. [Type text] Any other activities TABLE B Common Area ( Internal & External Development Works) in respect of the Registered Phase / Project Number Sr No. Common Area & Proposed Percentage of Details (1) Facilities Yes/No Actual Work Done (5) (2) (3) (As on date of the Certificate) (4) 1 Internal Road & Yes 100 As per Foothpath sanction 2 Water Supply Yes 100 As per sanction 3 Sewerage (Chamber Yes 100 As per Lines, Septic Tanks, sanction STP) 4 Storm Water Drains Yes 100 As per sanction 5 Landscaping and Tree Yes 100 As per Planting sanction 6 Street Lighting Yes 100 As per sanction 7 Community Building N/A N/A N/A 8 Treatment and N/A N/A N/A Disposal of sewage and sullage water 9 Solid waste N/A N/A N/A management & disposal 10 Water Conservation/ N/A N/A N/A Rain Water Harvesting 11 Energy Management N/A N/A N/A 12 Fire protection and fire N/A N/A N/A safety requirements 13 Electrical meter room, Yes 100 As per sub-station, receiving sanction station 14 Other (Option to Add - - - More) Yours Faithfully, [Type text] Ar.Vishwash Gupta Agree and Accepted Name :Ashutosh R Shewalkar Date : [Type text]