FORM-2 ENGINEER'S CERTIFICATE (To be submitted for withdrawalof Money from Designated Account- Project wise - March-2023) Date: 18.05.2023 To Dhariwal and Chhoriya Developers LLP, Chhoriya Realty, Office No 401, 4th Floor Adinath Shopping Center, Adinath Society, Pune Satara Road, Opp Hotel Panchami, Pune 411037. Subject: Certificate of Cost Incurred for Development of R.M. Dhariwal Greens Phase 3 having MahaRERA Registration Number: P51000015553 being developed by Dhariwal and Chhoriya Developers LLP. Sir, 1. I Avinash s. Wadgaonkar have undertaken assignment of certifying Estimated Cost for R.M. Dhariwal Greens Phase 3 having MahaRERA Registration Number: P51000015553 being developed by Dhariwal and Chhoriya Developers LLP 2 We have estimated the cost of Civil, MEP, and allied works required for completion of the apartment and proportionate competion of internal and external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the Drawings /plans made available to us for the project under reference by the developer and Consultants and the schedule of items and quantity for the entire work as calculated by Mr.Dinesh Y. Moundekar Quantity Surveyor* appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. We estimate Total Estimated Cost of completion of the Infrastructural work in the aforesaid project 3 under reference as Rs 49,73,932/- (Total of Table B) at the time of registration. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required for completion of project as per specifications mentioned in agreement of sale and for the purpose of obtaining completion certificate for the plotted Development from the Yavatmal Municipal Council being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. The Estimated Cost Incurred till date is calculated at Rs.49,73,932/- (Total of Table B). The 4. amount of Estimated Cost Incurred is calculated on the basis of input materials/Services used and unit cost of these items. The Balance cost of Completion of the Civil, MEP, and Allied works in the layout, as per 5. Specifications mentioned in agreement of sale, of the project is estimated at Rs 0/- (Total of Table B) 6. I certify that the Cost of the Civil, & development and allied work for in the layout, as per Specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table B beloW FORM-2 (TABLE A) Building/Wing bearingNumber SRH-Plot 32 to 38 Sr. No. Particular Amount Total Estimated cost of the building/ wing as on date of Registration is 18 03 2019 Rs Cost incurred as on 30 06 2022 (based on the Estimated cost ) Rs 3 Work done in percentage (As ercentage of the estimated cost) % 000% 4 Balance Cost to be Incurred (Based on Estimated Cost) RS 5 Cost Incurred on 30.06.2022 Additional /Extra Items as on not included in the Estimated Cost (AnnexureA) Rs FORM-2 (TABLE A) 39 to 42& Building/ Wing bearing Number SRH-Plot 87 to 89 Sr. No. Particular Amount Total Estimated cost of the building/ wing 1 Rs. as on date of Registration is 18.03.2019 2 |Cost incurred as on 30.06.2022 (based on the Estimated cost ) Rs 3 |Work done in percentage |(Asercentage of the estimated cost) % 0.00% 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs. 0 Cost Incurred on 30.06.2022 Additional / Extra ltems 5 as on not included in the Estimated Cost (AnnexureA) Rs FORM-2 (TABLE A) 60 to 64& Building/Wing bearing Number SRH-Plot 90 to 91 Sr. Particular Amount No. 1 Total Estimated cost of the building/ wing Rs. 0 as on date of Registration is 18.03.2019 Cost incurred as on 30.06.2022 2 Rs. (based on the Estimated cost ) Work done in percentage 0.00% 3 (As ercentage of the estimated cost) Balance Cost to be Incurred Rs. (Based on Estimated Cost) Cost Incurred on 30.06.2022 Additional /Extra ltems Rs. 5 as on not included in the Estimated Cost (AnnexureA) FORM-2 (TABLE B) to be prepared for the entire registered phase of tho Roal Estate Project) R.M.Dhariwal Greens Yavatmal -Phase-2 Sr. Particular Amount No Total Estimated cost of the Internal and External Development Works including the layout Rs 1 lamenities and facilities in 4973932 01.09.2017 as on date of Registration is Cost incurred as on 31.03.2023 Rs 4973932 2 l(based on the Estimated cost ) Work done in percentage % 100% 3 (As ercentage of the estimated cost) Balance Cost to be Incurred Rs. (Based on Estimated Cost) Additional/ Extra Items lCost Incurred on 31.03.2023 Rs. (AnnexureA) as on not included in the Estimated Cost 5 karEnginee Yours Faithfully Reg.No. and A-17089 Avinash S. Wadgaonkar Agreed and Acccpted by, Signature of Promoter Name: Anmol K. Chhoriya * Note from Real Estate Project as per drawings approved 1 The scope of work is to complete entire Certificate/Completion Cetificate. time to time so as to obtain Occupation Engineer or can be done by an independent 2 (*)Quantity survey can be done byoffice of calculated can be relied upon by the Engineer. Quantity Surveyor, whose certificate of quantity appointed by Developer, the name has to be surveyor being In case of find ependent quantity office of mentioned at the place marked (*)and in case quantity are being calculated by Engineer, who is responsible for the quantity Engineer, the name of the person in the office of calculated should be mentioned at the place marked(*). equipment and machinery required to carry out 3 The estimatedcost includes all labour, material, entire work. 4 As this is an estimated cost, any deviation in quantity required for development of the Real incurred/to be incurred. estate Project will result in amendment of the cost indicative and no texhaustive. D AllComponents of work with specifications are