FORM-2 (To be ENGINEER' submitted for withdrawal S CERTIFICATE of Money from Designated Account- Project To wise-Dec-2022) Date: 18.02.2023 Dhariwal and Chhoriya Developers LLP, Chhoriya Realty, Office No 401, 4th Floor Road, Opp Hotel Adinath Shopping Center, Panchami, Pune 411037. Adinath Society, Pune Satara Subject: Certificate of Cost Incurred for Development of R.M. MahaRERA Registration Number: Dhariwal Greens Phase 3 having Developers LLP. P51000015553 being developed by Dhariwal and Sir, Chhoriya 1 IManish V. Pande have undertaken Greens Phase 3 having assignment of certifying Estimated Cost for R.M. by Dhariwal and MahaRERA Registration Number: Dhariwal 2. We Chhoriya Developers LLP have estimated the cost P51000015553 being developed of Civil, MEP, and apartment and proportionate completion of allied works required for internal and completion of the specifications mentioned in agreement of sale. Our external works of the project as per Drawings /plans made available to us for the estimated cost calculations are based on the project Consultants and the schedule of items and quantity for under reference by the developer and Y. Moundekar Quantity the entire work as Surveyor* appointed by calculated by Mr.Dinesh cost of material, labour and other inputs made by Developerl Engineer, and the assumption of the us to developer, and the site inspection carried out by 3. ascertain/confirm We estimate Total the above analysis given to us. Estimated Cost of completion the Infrastructural work in the of under reference as Rs aforesaid project 49,73,932/- (Total of Table B) at the time of Total Cost of project is with reference to the Civil, MEP and allied worksregistration. The estimated project as per specifications required for mentioned in agreement of sale and for the purposecompletion of of obtaining completion certificate for the plotted Development from the the Planning Authority under Yavatmal MunicipalCouncil being whose jurisdiction the aforesaid project is being 4 The Estimated Cost Incurred till date is calculated at implemented. amount of Estimated Cost Incurred is Rs.49,73,932/- (Total of Table B). The calculated on the basis of input unit cost of these items. materials/Services used and 5. The Balance cost of Completion of the Civil, MEP, and Allied works in the layout, as per Specifications mentioned in agreement of sale, of the project is B). estimated at Rs 0- (Total of Table 6 Icertify that the Cost of the Civil, & development and allied work for in the layout, as per Specifications mentioned in agreement of sale, of the aforesaid Project as date of this certificate is as given in Table B completed on the below : FORM-2 (TABLE B) (to be prepared for the entire registered phase of the Real Estate Project) R.M.Dhariwal Phase-3 Greens Sr. No Particular Amount Total Estimated cost of the Internal and External Works including amenities and Development as on date of Registration is facilities in the layout Rs 4973932 08.03.2018 2 Cost incurred as on 30,12.2022 (based on the Estimated cost ) Rs. 4973932 3 Work done in percentage (As ercentage of the estimated cost) % 100% 4 Balance Cost to be Incurred (Based on Estimated Cost) RS. Cost Incurred on 30.12.2022 Additional/ Extra 5 Items Jas on not included in the Estimated Cost (AnnexureA) Rs. 0 Yours Faithfully Gngine g.No. 7089 dndeel vanl Avinash S. Wadqashkar Agreed and Acccpted by, Signature of Promoter Name: Anmol K. Chhoriya * Note 1 The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/Completion 2 (*)Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of find ependent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*)andin case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked(*). 3 The estimated cost includes alllabour, material, equipment and machinery required to carry out entire work. 4 As this is an estimated cost, any deviation inquantity required for development of the Real estate Project will result in arnendment of the cost incurred/to be 5 All components of work with specifications are indicative and no texhaustive.