FORM-2 ENGINEER'SCERTIEICATE (To be submitted for withdrawal of Money from Designated Account- Project wise-Sep-2022) Date: 18.10.2022 To Dhariwal and Chhoriya Developers LLP, Chhoriya Realty, Office No 401, 4th Floor Adinath Shopping Center, Adinath Society, Pune Satara Road, Opp Hotel Panchami, Pune 411037. Subject: Certificate of Cost Incurred for Development of R.M. Dhariwal Greens Phase 3 havingg MahaRERA Registration Number: P51000015553 being developed by Dhariwal and Chhoriya Developers LLP. Sir, 1. I Manish V. Pande have undertaken assignment of certifying Estimated Cost for R.M. Dhariwal Greens Phase 3 having MahaRERA Registration Number: P51000015553 being developed by Dhariwal and Chhoriya Developers LLP 2. We have estimated the cost of Civil, MEP, and allied works required for completion of the apartment and proportionate completion of internal and external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on Drawings /plans made available to us for the project under reference by the developer and consultants and the schedule of items and quantity for the entire work as calculated by Mr.Dinesh Y. Moundekar Quantity Surveyor appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the Infrastructural work in the aforesaid project under reference as Rs 49,73.932 (Total of Table B) at the time of registration. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required for completion of project as per specifications mentioned in agreement of sale and for the purpose of obtaining completion certificate for the plotted Development from the Yavatmal Municipal Council being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 5,96,872/ (Total of Table amount of Estimated Cost Incurred is calculated on B). The the basis of input materials/Services used and unit cost of these items. 5. The Balance cost of Completion of the Civil, MEP, and Allied works in the Specifications mentioned in agreement of sale, of the layout, as per of Table B). project is estimated at Rs 43,77,060- (Total 6. I certify that the Cost of the Civil, & development and allied work for in the layout, as per Specifications mentioned in agreement of sale, of the date of this certificate is as aforesaid Project as completed on the given in Table B below i P e r irojects Project anagcment Consultant FORM-2 (TABLE B) R.M.Dharlwal Greens- (to be prepared for the entire registered phase of the Real Estate Pro/ect) Phase-3 Sr. No Particular Amount Total Estimated cost of the Internal and External Development 1 Works including amenities and facilities in the layout Rs. 4973932 as on date of Registration is 08.03.2018 Cost incurred as on 30.09.2022 596872 2 Rs (based onthe Estimated cost) Work done in percentage 12% 3 (As ercentage of the estimated cost) Balance Cost to be Incurred (Based on Estimated Cost) Rs 4377060 Cost Incured on 30.09.2022 Additional Extra Items a s on not included in the Estimated Cost (AnnexureA) Rs. M a m e l e Yours Faithfully iMPower Projects Bniort nanp"2t Consi!* Manish V. Pande (IMPower Projects) Agreed and Acccpted by, Signature of Promoter Name: Anmol K. Chhoriya * Note 1 The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation 2 (*)Quantity survey can be done by office of Engineer orCertificate/Completion can be done independent Quantity Surveyor, whose certificate of by an relied upon by the Engineer. In case quantity calculated can be of find ependent appointed by Developer, the name has to be mentioned at quantity surveyor being and in case quantity are being calculated the place marked person in the office of by office of Engineer, the name of the Engineer, should be mentioned at the who is responsible for the quantity calculated 3 The estimated cost place marked(*). includes all labour, required to carry out entire work. materlal, equipment and machinery As this is an estimated cost, any deviation in the Real estate Project will result in amendment quantity required for development of components work with specifications are of the cost incurred/to be 5 All of indicative and no texhaustive.