EORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Quarterly Update Registered Project and for withdrawal of Money from Designated Account) March 2023 Date: 15.05.2023 To, The Dhariwal and Chhoriya Developers LLP, Chhoriya Realty, Office No 401, 4th Floor Adinath Shopping Center, Adinath Society, Pune Satara Road, Opp Hotel Panchami, Pune 411037. Subject: Certificate of Percentage of Completion of Infrastructural Development Work of R.M. Dhariwal Greens Phase 3 having MahaRERA Registration Number: P51000015553 being developed by Dhariwal and Chhoriya Developers LLP. Sir, IKunal Patil have undertaken assignment as Architect / Licensed Surveyor of certify in Percentage of Completion of Construction Work of R.M. Dhariwal Greens Phase 3 having MahaRERA Registration Number: P51000015553 being developed by Chhoriya Properties and Development Company. Based on Site Inspection, with respect to Layout / each of the Building / Wing of the aforesaid Real Estate Project, Icertify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project as registered Under MahaRERA is as per Table A herein below, The Percentage of the work executed with respect to each of the activity of the entire phase is detailed Table B. FORM-1 (Table A) Building No SRH 60 to 64 & 90 to 91-Plots PHASE 3 (to be prepared separately for each Building/ Wing of the Project) Sr. Task /Activity Percentage of work No done 1 Excavation 0% 2 1number of Basement(s) and Plinth 0% Onumber of Podiums 0% 4 Stilt Floor 0% 5 |2 number of SIlabs of Super Structure 0% |Internal walls, Internal Plaster ,Floorings with in 0% |Flats/Premises,Doors and Windows to each of the Flat/Premises 7 |Sanitary Fittings within the Flat /Premises, Electrical Fittings within 0% the Flat /Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 0% Staircases and Lifts, Overhead and Underground Water Tanks |The external plumbing and external plaster, |elevation,completion of terraces with waterproofing of the 0% BuildingWing |Installationof lifts,water pumps, Fire Fighting Fittings and Equipment as per CFONOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of 10 environment/ CRZNOC, Finishing to entrance lobby/s ,plinth 0% protection, paving of areas appurtenant to Building/Wing, |Compound Walland allother requirements as may be required to |Obtain Occupation / Completion Certificate 11 Cumulative Total % work done of building 0% From 1Table B Development Worksin Respect of the entire Registered Phase I Internal & External Residency -Phase 3 Project:- NandurbarChhoriya Proposed Percentage of Detaila Facilities, Amenities (Yes/No) Work done S Common areas and No Yes 100 No Footpath Roads & Foot paths 1 lInternal 100 Water pipo line Yes Water Supply 2 100 NOSTP (chamber, lines, Septic Tank. STP) Yes 3 Sewerage NA No Storm WNater Drains 4 Yes 100 Inphase 1 5 Land scaping &Tree Planting Yes 100 Street light 6Street Lighting 100 In Phase 2 Community Buildings Yes 7 Treatment and disposal of sewage and sullage No NA 8 water No 0 NA 9 Solid Waste management &Disposal No 0 NA 10 Water conservation Rain water harvesting No NA 11 Energy management No NA 12 Fire protection and fire safety requirements 13 Electrical meter room,sub- station, receiving Yes 100 Layout Electrification station Yes 100 In Phase 1 14 Aggregate area of recreational open space NA 15 Open Parking 2No 16 Entrance Gate and Compound Wall Yes 100 In Phase 1 Yours Faithfully, KUNAL R. PATV Benal Patil Consulting Architect ING AR Agreed and Accepted by. Signature of Promoter Name:Anmol K. Chhoriya