FORM-2A ENGINEER’S CERTIFICATE FOR QUALITY ASSURANCE (site supervisor’s cer cate) To Shagun Associates, Nanded. Quality Assurance Cer cate (Cer cate no 006 for the Financial year ending March 2020) Subject : Cer cate for quality of materials used and quality of Construc on and workmanship for the Work of GVC SHAGUN CITY PHASE 1 having MahaRERA Registra on Number P51100015116 being developed by Shagun Associates Sir, I Sunil Shirsat have undertaken an assignment of supervision of this real estate project. Our Responsibility: – I/We are responsible for carrying out the work in accordance with the development permission and as per the approved plan and submit cer cate of supervision of work and to carry out material tes ng in-situ or in the authorized laboratory and to ensure quality of work and workmanship as per prescribed speci ca ons, and as per NBC and or other relevant code of prac ce. 1. lnput Materials, Fixtures and Fi ngs I/We hereby cer fy that all Construc on material. Fixtures and Fi ngs with regard to the ooring, Electrical. Sanitary ngs etc and ameni es to be provided by the Promoter in the said Project, building and the Apartment as are as per speci ca ons men oned in Schedule of Ameni es and Speci ca ons of Agreement of Sale. For those items, where no speci ca ons have been men oned in agreement of sale. the materials. Fixtures and Fi ngs used conform to the relevant BIS Standards / IS Na onal Building codes or as per industry standards. 2. Workmanship - I/we hereby cer fy that work has been carried out under our supervision. We further cer fy that workmanship and quality is sa sfactory and up to the mark and the work has been acceptable within the permissible limits of devia ons as per relevant code of prac ce. 3. Structural engineer: – Promoters has engaged structural engineer Mr.Sandesh Pa l having Licenses no. 576-a having o ce at Pune cell no. 9921195058 fl ti ti ti ti ti tti ti ti ti ti ti ti fi fi ti ti ti ti ti tti fi fi ti fi tti ti ti fi ti fi tti fi ti ti ti fi fi ti ti ffi ti The structural design of buildings in this project has been done under his supervision The formwork and concrete mix design has been done as per lS 10262:2009 or as per other relevant codes as applicable. His periodic checks and cer cates for STABILITY and SAFETY have been kept on record. 4. Preserva on of records: – Record of all test results of this project have been properly kept in the prescribed formats and will be preserved at least up to the defect liability period or for the period as required by any other provision of law. 5. Please specify materials or any other item of work which were not conforming to the speci ca ons as men oned in the Agreement for sale: ———————————— ————————————– Yours Faithfully, Signature of Engineer (Site Supervisor) Name : Sunil Shirsat License no. YDOH597FVE Phone no.9404648143 Place : Nanded. 15/04/2020 fi ti ti ti ti fi