FORM-2 ENGINEER'S CERTIEICATE (To be submitted for withdrawal of Money from Designatod Account- Projoct wise-June-2023) Date 18 072023 To Dhariwal and Chhorlya Developers LLP, Chhoniya Realty, Office No 401, 4th Floor Adinath Shopping Center, Adinath Society, Pune Satara Road, Opp Hotel Panchami, Pune 411037. Subject: Certificate of Cost Incurred for Development of R.M. Dhariwal Greens Phase 2 having MahaRERA Registration Number: P51000012173 being developed by Dhariwal and Chhoriya Developers LLP. Sir. 1 IAvinash S. Wadgaonkar have undertaken assignment of certifying Estimated Cost for R.M. Dhariwal Greens Phase 2 having MahaRERA Registration Number: P51000012173 being developed by Dhariwal and Chhoriya Developers LLP 2 We have estimated the cost of Civil, MEP, and allied works required for completion of the apartment and proportionate completion of internal and external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the Drawings /plans made available to us for the project under reference by the developer and consultants and the schedule of items and quantity for the entire work as calculated by Mr.Dinesh Y. Moundekar Quantity Surveyor* appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection caried out by us to ascertain/confirm the above analysis given to us. 3 We estimate Total Estimated Cost of completion of the Infrastructural work in the aforesaid project under reference as Rs 1,87,79,225/- (Total of table Aand Table B) at the time of registration. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required for completion of project as per specifications mentioned in agreement of sale andfor the purpose of obtaining completion certificate for the plotted Development from the Yavatmal Municipal Council being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4 The Estimated Cost Incurred tlldate is calculated at Rs. 1,85.09,069/-(Total of Table A&Table B). The amount of Estimated Cost Incurred is calculated on the basis of input materials/Services used and unit cost of these items. 5 The Balance cost of Completion of the Civil, MEP, and Allied works in the layout, as per Specifications mentioned in agreement ofsale,of the project is estimated at Rs. 2,70,156/-(Total of Table A& Table B). 6 Icertify that the Cost of the Civil, &development and allied work for in the layout, as per Specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A And Table B below : FORM-2 (TABLE A) Building/ Wing bearing Number RH 54 to59 Sr. Amount Particular No. Total Estimated cost of the building/ wing Rs. 12864576 1 as on date of Registration is 01.09.2017 Cost incurred as on 30.12.2022 Rs. 12594420 2 (based on the Estimated cost ) Work done in percentage % 97.90% 3 J(As ercentage of the estimated cost) Balance Cost to be Incurred Rs. 270156 4 (Based on Estimated Cost) Cost Incurred on 30.12.2022 Additional /Extra Items Rs. 5 |as on not included in the Estimated Cost (AnnexureA) FORM-2 (TABLE A) Building/ Wing bearing Number RH 83 to 86 Sr. Particular Amount No. Total Estimated cost of the building/ wing Rs. Jas on date of Registration is 01.09.2017 Cost incurred as on 30.12.2022 Rs. 2 (based on the Estimated cost ) Work done in percentage %| 0.00% 3 (As ercentage of the estimated cost) Balance Cost to be Incurred |Rs. (Based on Estimated Cost) Cost Incurred on 30.12.2022 Additional / Extra Items Rs. 5 as on not included in the Estimated Cost (AnnexureA) FORM-2 (TABLE A) Building/ Wing bearing Number RH 99 to 100 Amount Sr. Particular No. Total Estimated cost of the building/ wing Rs. as on date of Registration is 01.09.2017 Cost incurred as on 30.09.2022 Rs. 2 (based on the Estimated cost ) Work done in percentage % 0.00% (As ercentage of the estimated cost) Balance Cost to be Incurred Rs. 4 (Based on Estimated Cost) / Extra ltems Cost Incurred on 30.09.2022 Additional Rs. (AnnexureA) as on not included inthe Estimated Cost 5 FORM-2 (TABLE A) PB 101 Building/ Wing bearing Number Amount Sr. Particular No. 940717 Total Estimated cost of the building/ wing Rs. 01.09.2017 as ondate of Registration is Cost incurred as on 30.12.2022 Rs. 940717 2 (based on the Estimated cost ) Work done in percentage % 100.00% I(As ercentage of the estimatedcost) 3 Balance Cost to be Incurred Rs. 4 (Based on Estimated Cost) Additional / Extra ltems Cost Incurred on 30.12.2022 Rs. (AnnexureA) 5 Jas on not included in the Estimated Cost FORM-2 (TABLE B) R.M.Dhariwal Greens the Real Estate Project) (to be prepared for the entire registered phase of Yavatmal -Phase-2 Particular Amount Sr. No External Development Works including ITotal Estimated cost of the Internal and |Rs. 4973932 layout 1 amenities and facilities in the is01.09.2017 Jas on date of Registration 31.06.2023 Rs. 4973932 JCost incurred as on 2 l(based on the Estimated cost) % 100% Work done in percentage 3 estimated cost) |(As ercentage of the Rs. Balance Cost to be Incurred (Based on Estimated Cost) Additional/ Extra ltems Rs. Cost Incurred on 31.06.2023 5 Estimated Cost (AnnexureA) as on not included in the Yours Faithfullyadgaoy eEngine .No Avína[h S. W¡dgsonka Agreed and Acccptey Rlopero Pune Signature of Pròqoter Name: Anmol K. Chhoriya * Note Project as per drawings approved from The scope of work is to complete entire Real Estate Certificate/Completion Certificate. time to time so as to obtain Occupation be done by an independent 2 (*)Quantity survey can be done by office of Engineer or can Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. appointed by Developer, the name has to be In case of find ependent quantity surveyor being mentioned at the place marked (*)and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned the place marked(*). 3 The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4 As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. 5 All components of work with specifications are indicative and no texhaustive.