FORM-2 ENGINEER'S CERTIFICATE (To be submitted for with drawal of Money from Designated Account- Project wiso-Dec-2022) Date 18 02 2023 To Dhariwal and Chhoriya Developers LLP, Chhoriya Realty, Ofice No 401, 4th Floor Adinath Shopping Center, Adinath Society. Pune Satara Road, Opp Hotel Panchami, Pune 411037. Subject: Certificate of Cost Incurred for Development of R.M. Dhariwal Greens Phase 2 having MahaRERA Registration Number: P51000012173 being developed by Dhariwal and Chhoriya Developers LLP. Sir, 1 IAvinash s. Wadgaokar have undertaken assignment of certifying Estimated Cost for R.M. Dhariwal Greens Phase 2 having MahaRERA Registration Number: P51000012173 being developed by Dhariwal and Chhoriya Developers LLP 2. We have estimated the cost of Civil, MEP, and allied works required for completion of the apartment and proportionate completion of internal and external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the Drawings /plans made available to us for the project under reference by the developer and consultants and the schedule of items and quantity for the entire work as calculated by Mr.Dinesh Y. Moundekar QuantitySurveyor* appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. 3 We estimate Total Estimated Cost of completion of the Infrastructural work in the aforesaid project under reference as Rs 1,87,79,225/- (Total of table A and Table B) at the time of registration. The estimated Total Cost of project is with reference to the Civil, MEP and allied wWorks required for completion of project as per specifications mentioned in agreement of sale and for the purpose of obtaining completion certificate for the plotted Development from the Yavatmal Municipal Council being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4 The Estimated Cost Incurred till date is calculated at Rs. 1,85,09,069/- (Total of Table A & Table B). The amount of Estimated Cost Incurred is calculated on the basis of input materials/Services used and unit cost of these items. 5 The Balance cost of Completion of the Civil, MEP, and Allied works in the layout, as per Specifications mentioned in agreement of sale, of the project is estimated at Rs. 2,70,156/- (Total of Table A & Table B). 6. Icertify that the Cost of the Civil, &development and allied work for in the layout, as per Specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A And Table B below : FORM-2 (TABLE A) Building/ Wing bearing Number RH 54to59 Sr. No. Particular Amount 1 Total Estimated cost of the building/ wing as on date of Registration is 01.09.2017 Rs. 12864576 Cost incurred as on 30.12.2022 2 (based on the Estimated cost ) Rs. 12594420 3 Work done in percentage (As ercentage of the estimated cost) % 97.90% 4 Balance Cost to be Incurred (Based on Estimated Cost) RS. 270156 5 Cost Incurred on 30.12.2022 Additional / Extra Items as on not included in the Estimated Cost (AnnexureA) Rs. FORM-2 (TABLE A) Building/ Wing bearing Number RH 83 to 86 Sr. Particular Amount No. 1 Total Estimated cost of the building/ wing Jas on date of Registration is 01.09.2017 Rs. Cost incurred as on 30.12.2022 2 Rs. (based on the Estimated cost ) 3 Work done in percentage % 0.00% (As ercentage of the estimated cost) Balance Cost to be Incurred 4 Rs. (Based on Estimated Cost) 5 |Cost Incurred on 30.12.2022 Additional/Extra Items Rs. as on not included in the Estimated Cost (AnnexureA) FORM-2 (TABLE A) Building Wing bearing Number RH 99 to 100 Sr. No. Particular Amount 1 Total Estimated cost of the as on date of Registration is building/ 01 wing Rs 09.2017 Cost incurred as on 2 30.12.2022 (based on the Estimated cOst ) Rs 3 Work done in percentage (As ercentage of the estimated cost) 0 00% 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs Cost Incurred on 30.12.2022 Additional / 5 Extra Items as on not included in the Estimated Cost Rs (AnnexureA) FORM-2 (TABLE A) Building/Wing bearing Number PB 101 Sr. Particular Amount No. 1 Total Estimated cost of the building/ wing as on date of Registration is 01.09.2017 Rs. 940717 Cost incurred as on 30.12.2022 2 Rs. 940717 (based on the Estimated cost) Work done in percentage (As ercentage of the estimated cost) 100.00% 4 Balance Cost to be Incurred Rs. (Based on Estimated Cost) 5 Cost Incurred on 30.12.2022 Additional / Extra Items Rs. as on not included in the Estimated Cost (AnnexureA) (to be prepared for the entire FORM-2 (TABLE B) Sr. registered phase of the Real Estate R.M.Dhariwal Greens No Project) Yavatmal -Phase-2 1 Total Estim ated cost of the Particular Amount amenities and Internal and as on date of facilities in the layout External Development Works including 2 Cost incurred Registration is 01.09.2017 as on Rs. 4973932 (based on the Estimated 30.12.cost) 2022 Rs. 4973932 Work done in percentestimated (As ercentage of the age cost) % 100% 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs. 5 Cost Incurred on as on not included30.12.2022 in the AdditionalW Extra Items Rs. Estimated Cost (AnnexureA) onkar, Yours Faithfully Enging Reg.No. A-17089 JYn Avinash S. Wadgaohkar s Agreed and Acccpted by, Signature of Promoter Name: Anmol K. Chhoriya * Note 1 The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/Completion Certificate. 2 (*)Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of find ependent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (")and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked(*). 3 The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4 As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. 5 Allcomponents of work with specifications are indicative and no texhaustive.