FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Quarterly Update Registered Project and for withdrawal of Money from Designated Account) March 2023 Date: 15.05.2023 To, The Dhariwal and Chhoriya Developers LLP, Chhoriya Realty, Office No 401, 4th Floor Adinath Shopping Center, Adinath Society, Pune Satara Road, Opp Hotel Panchami, Pune 411037. Subject: Certificate of Percentage of Completion of Infrastructural Development Work of R.M. Dhariwal Greens Phase 2 having MahaRERA Registration Number: P51000012173 being developed by Dhariwal and Chhoriya Developers LLP. Sir, IKunal Patil have undertaken assignment as Architect / Licensed Surveyor of certify in Percentage of Completion of Construction Work of R.M. Dhariwal Greens Phase 2 having MahaRERA Registration Number: P51000012173 being developed by Chhoriya Properties and Development Company. Based on Site Inspection, with respect to Layout / each of the Building / Wing of the aforesaid Real Estate Project, Icertify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project as registered Under MahaRERA is as per Table A herein below, The Percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table A and Table B. FORM-1 (Table A) Building/ /RH 54 -59 PHASE2 (to be prepared separately for each Building/ Wing of the Project) Sr. Percentage of work No Task /Activity done 1 Excavation 100% 2 1number of Basement(s) and Plinth 100% 3 0 number of Podiums 0% 4 Stilt Floor 0% 5 2number of Slabs of Super Structure 100% 6 |Internal walls, Internal Plaster ,Floorings with in 100% Flats/Premises, Doors and Windows to each of the Flat/Premises 7 |Sanitary Fittings within the Flat /Premises, Electrical Fittings within 100% the Flat / Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 100% Staircases and Lifts, Overhead and Underground Water Tanks The external plumbing and external plaster, 9 elevation, completion of terraces ith waterproofing of the 100% Building/Wing Installation of lifts, water pumps, Fire Fighting Fitings and Equipment as per CFONOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of 10 environment/ CRZNOC, Finishing to entrance lobby/s ,plinth 70% protection, paving of areas appurtenant to Building/Wing, |Compound Walland all other requirements as may be required to Obtain Occupation /Completion Certificate 11 Cumulative Total %work done of building 98% FORM-1 (Table A) Building RH 83-86 PHASE 2 WIng of the Project) (to be propared soparately for each Bullding/ Percentage of work Sr. Task IActivity done No 0% 1 Excavation 0% 2 number of Basement(s) and Plinth 0% 3 0 number of Podiums 0% 4 Stilt Floor 0% 5 2 number of Slabs of Super Structure |Internalwalls, Internal Plaster,Floorings with in 0% 6 Flats/Premises,Doors and Windows to each of the Flat/Premises Fittings within Sanitary Fittings within the Flat / Premises, Electrical 0% 7 the Flat/Premises Staircases, Lifts Wells and Lobbies at each Floor level connecting 0% |Staircases and Lifts, Overhead and Underground Water Tanks 8 The external plumbing and external plaster, elevation, completion of terraces with waterproofingof the 0% Building/Wing Installation of lifts,water pumps, Fire Fighting Fittings and Equipment as per CFONOC, Electrical fittings to Common Areas, of electro, mechanical equipment, Compliance to conditions 0% ,plinth 10 environment/CRZNOC, Finishing to entrance lobby/s protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% E 11 Cumulative Total % work done of building FORM-1 (Table A) Building No 99-100 PHASE 2 of the Project) (to be prepared separately for each Building/ VWing Percentage of work Sr. Task IActivity done No 0% 1 Excavation 0% 1number of Basement(s) and Plinth 0% 3 O number of Podiums 0% 4 Stilt Floor 0% Structure 5 2 number of Slabs of Super in 0% |Internal walls, Internal Plaster,Floorings withof the Flat/Premises 6 Flats/Premises,Doors and Windows to each Electrical Fittings within 0% |Sanitary Fittings within the Flat / Premises, 7 the Flat/ Premises Floor level connecting 0% Staircases, Lifts Wells and Lobbies at each Water Tanks 8 Staircases and Lifts, Overhead and Underground plaster, The external plumbing and external waterproofing of the 0% elevation, completion of terraces with BuildingWing Fittings and |Installationof lifts, water pumps, Fire Fighting fittings to Common Areas, Equipment as per CFONC, Electrical Compliance to conditions of electro, mechanical equipment, lobby/s ,plinth 0% Finishing to entrance 10 environment/ CRZNOC, to Building/Wing, protection,paving of areas appurtenant requirements as may be required to Compound Wall and all other Certificate Obtain Occupation /Completion 0% of building 11 Cumulative Total % work done FORM-1 (Table A) Building PB 101 PHASE 2 (to be prepared separately for each Building/Wing of the Project) Sr. Percentage of work Task IActivity No done Excavation 100% 2 1number of Basement(s) and PIlinth 100% 3 0number of Podiums 0% 4 Stilt Floor 0% 5 2 number of Slabs of Super Structure 0% 6 |Internal walls, Internal Plaster ,Floorings with in 0% Flats/Premises,Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat / Premises, Electrical Fittings within 0% the Flat / Premises Staircases, Lifts Wells andLobbies at each Floor levelconnecting 0% |Staircases and Lifts, Overhead and Underground Water Tanks The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the 0% Building/Wing |Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFONOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of 10 environment/ CRZNOC, Finishing to entrance lobby/s plinth 0% protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to |Obtain Occupation/ Completion Certificate 11 Cumulative Total %work done of building 16% From 1Table - B Internal &External Development Works in Respect of the entire Registered Phase - 2 Project:- R.M.Dhariwal Greens Phase 2 S No Common areas and Facilities, Amenities Proposed Percentage of Details (Yes/No) Work done Internal Roads &Foot paths Yes 100 Concrete Road Water Supply Yes 100 3 Sewerage (chamber, lines, Septic Tank, 100 STP STP) Yes 4 Storm Water Drains Yes 100 Pit 5 Land scaping &Tree Planting Yes 100 OS Garden |Street Lighting Yes 100 Street light 7 Community Buildings Yes 100 Yoga Hall 8 Treatment and disposal of sewage and sullage water Yes 100 Treatment and disposal 9 Solid Waste management &Disposal Yes 100 Vermiculture pit 10 Water conservation ,Rain water harvesting Yes 100 Pit 11 Energy management Yes 100 Solar Light 12 Fire protection and fire safety requirements No 0 NA Electrical meter room, sub- station, receiving 100 Electrification 13 station Yes 14 JAggregate area of recreational open space Yes 100 Cricket and Basket ball 15 Open Parking Yes 100 Open 16 Entrance Gate and Compound Wall Yes 100 Layout Ent 17 CCTVCamera for layout security Yes 100 CCTV Camera Yours Faithfully,ONAL .PAT Kunal Patil NGARO Consulting Architect Agreed and Accepted by, Signature of Promoter Name:Anmol K. Chhoriya