Date: 13/01/2018 To Shri Ajay Bang & Dr. Sanjay Bang, Shri Tirupati Corporation, Digras 445203 Subject: Certificate of Percentage of Completion of Construction of the First phase of Proposed Building Layout situated on the Plot bearing 11/1 Plot No 1&2 demarcated by its boundaries Road to the North, Road to the South, Road to the East & Agri land to the West of Digras, Taluka – Dogras, District- Yavatmal 445203 admeasuring total Plot area 1065.97 sq.mts. Being developed by Shri. Tirupati Corporation Ref: MahaRERA Registration Number P51000013954 Sir, I Arch. Sachin Kothari (K2 Architects) have undertaken assignment as Architect (CA/ 2000/ 26046) of certifying Percentage of Completion of construction work of the Proposed Building Layout situated on the Plot bearing 11/1 Plot No 1&2 demarcated by its boundaries Road to the North, Road to the South, Road to the East & Agri land to the West of Digras, Taluka – Digras Dogras, District- Yavatmal 445203 admeasuring total Plot area 1065.97 sq.mts. Being developed by Shri. Tirupati Corporation 1. Following technical professionals are appointed by Shri. Tirupati Corporation for their Proposed Building Layout situated on the Plot bearing 11/1 Plot No 1&2 demarcated by its boundaries Road to the North, Road to the South, Road to the East & Agri land to the West of Digras, Taluka – DigrasDogras, District- Yavatmal 445203 admeasuring total Plot area 1065.97 sq.mts. I. Arch. Sachin Kothari (K2 Architects) II. Mr. Kulkarni/ Er. Kunal R. Jajada as Structural Consultant III. Mr. Nikhil Mahindre as site Supervisor Based on Site Inspection, with respect to proposed building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the Wing of the Real Estate Project as registered vide number P51000013954 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Page 1 of 3 Table A.1 – Shri. Tirupati Corporation Sr. Percentage of Tasks /Activity No work done 1 Excavation 100% 2 Plinth 100% 3 Stilt Floor NA 4 3 number of Slabs of Super Structure 40% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors, and 5 Windows to each of the Flat/Premises 0% Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 6 Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting 7 Staircases and Lifts, Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of 8 terraces with waterproofing of the Building/Wing, 0% Installation of  Lifts NA  water pumps NA  Electrical fittings to Common Areas 0% 9  Finishing to entrance lobby/s, 0%  paving of areas appurtenant to Wing 0%  Compound Wall 0%  All other requirements as may be required to Obtain Occupation NA /Completion Certificate Page 2 of 3 Table B – Internal & External Development Works Percentage Common areas and Facilities, Proposed S.No of Work Details Amenities (Yes/No) done 1 Internal Roads & Footpaths No NA 2 Water Supply Yes 0% Sewage (chamber, lines, Septic Tank, 3 STP) Yes 0% 4 Storm Water Drains Yes 0% 5 Landscaping & Tree Planting No 0% 6 Street Lighting No NA 7 Community Buildings No NA Treatment and disposal of sewage and 8 sullage water No NA 9 Solid Waste management & Disposal No NA Water conservation, Rain water 10 harvesting Yes 0% 11 Energy management No NA Fire protection and fire safety 12 requirements No NA Electrical meter room, sub-station, 13 receiving station Yes 0% 14 Club House No NA Yours Faithfully, Page 3 of 3