Annexure A FORM 1 [See Regulation 3] ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 16/12/2023 To, Date: 01/04/2025 M/S G S FORT REALTORS, PATEL NAGAR, CHANDRAPUR CHANDRAPUR. Subject: Certificate of Percentage of Completion of Construction Work of “G S HEIGHTS” having MahaRERA Registration Number P50900035159 being Developed by M/S G S FORT REALTORS upto 31/03/2025 31/03/2022. Sir, I have undertaken assignment as Architect Certifying Percentage of Completion of Construction Work of “G S HEIGHTS” having MahaRERA Registration Number P50900035159 being Developed by M/S G S FORT REALTORS. Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Building G S HEIGHTS (to be prepared separately for each Layout/Building/Wing of Project) S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 50 100 2. Basements (if any) 0 100 3. Podiums (if any) NA 4. Plinth 0100 5. Stilt Floor NA 6. Slab of Super Structure 050 7. Internal Walls, Internal Plaster, Floorings, Doors, windows 050 within Flats / Premises 8. Sanitary Fittings within Flats / Premises 0 9. Staircases, Lift Wells & Lobbies at each Floor Level Overhead 0 and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, Completion 0 of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings and 0 Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal & External Development Works) in respect of the Registered Phase / Project Number S. No. Common Areas & Facilities Proposed Percentage of actual Work Details (Yes / NO) Done (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths NO 2. Water Supply YES 100% BORING 3. Sewerage (Chamber, Lines, Septic YES 0% No STP Tank, STP) 4. Strom Water Drains NA 5. Landscaping & Tree Planting NA 6. Street Lighting NA 7. Community Buildings 8. Treatment & Disposal of Sewage and NA Sullage Water 9. Solid Waste Management & Disposal NA 10. Water Conservation / Rain Water YES 0% Harvesting 11. Energy Management NA 12. Fire Protection & Fire Safety YES 0% requirements 13. Electrical Meter Room, Sub-Station, YES 0% Receiving Station 14. Others (Option to Add more) Yours faithfully, Arc Vikrant Bhute License Number (CA/2005/35533) Agreed & Accepted by: Signature of Promoter ( Partner- Gajanan Nilawar) M/S G S FORT REALTORS Date: 16/12/2023 Date:01/04/2025