Annexure A FORM 1 [See Regulation 3] ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date: 21/02/2022 To, The G. S. Fort Realtors Through Partners Shri. Gajanan Moreshwar Nilawar & Others Chandrapur Subject: Certificate of Percentage of Completion of Construction Work of G.S. Heights having MahaRERA Registration Number Applied(Only applicable after Project Registration) being Developed by G. S. Fort Realtors. Sir, I / We have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of G S Heights having MahaRERA Registration Number Applied(Only applicable after Project Registration) being Developed by G. S. Fort Realtors. Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Layout / Building / Wing Number __ (to be prepared separately for each Layout/Building/Wing of Project) S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 0% 2. Basements (if any) 0% 3. Podiums (if any) 0% 4. Plinth 0% 5. Stilt Floor 0% 6. Slab of Super Structure 0% 7. Internal Walls, Internal Plaster, Floorings, Doors, 0% windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 0% 9. Staircases, Lift Wells & Lobbies at each Floor Level 0 % Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 0 % Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings 0 % and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal & External Development Works) in respect of the Registered Phase / Project Number S. Common Areas & Facilities Proposed Percentage of actual Work Details No. (Yes / NO) Done (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths 0% 2. Water Supply 0% 3. Sewerage (Chamber, Lines, 0% Septic Tank, STP) 4. Strom Water Drains 0% 5. Landscaping & Tree Planting 0% 6. Street Lighting 0% 7. Community Buildings 0% 8. Treatment & Disposal of Sewage 0% and Sullage Water 9. Solid Waste Management & 0% Disposal 10. Water Conservation / Rain Water 0% Harvesting 11. Energy Management 0% 12. Fire Protection & Fire Safety 0% requirements 13. Electrical Meter Room, Sub- 0% Station, Receiving Station 14. Others (Option to Add more) 0% Yours faithfully, Signature & Name Er. VIKRANT BHUTE License Number (CA/2005/35533) Agreed &Accepted by: Signature of Promoter Name: G. S. Fort Realtors Date: 21/02/2022