FORM-2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Projec{ and for withdrawal of Money from Designated Account- Project wise) Dale:2910812017 To, The Sai Devlopers, ghatanji Subject : Certificate of Cost lncuned for Development of [Project Name] for Construction of sai shopping complex building(s)/ A & B Wing(s) of the - Phase ( MahaRERA Registration Number) situated on the Plot bearing C.N. No./CTS No./Survey No./ Final Plot No. 3 & 41 73,7612 demarcated by its boundaries ( latitude and longitude of the end points) Layout road to the North, open plot to the South, plot no 5 to 10 to the East, Yavatmal road to the West of Division Amaraw, Village Ghatanji, Taluka Ghatanii, District Yavatmal, PIN 445301 admeasuring 1241.95 sq.mts. area being developed by [Promoter] Ref : MahaREM Registration Number Sir, l/ We Srikant Mehar have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being sai shopping complex Building(sy A & B Wing(s) of the_-_ Phase situated on the plot bearing C.N. No./CTS No./Survey No./ Final Plot No. 3 & 4173,76/2 of Division Amaravti Village Ghatanii Taluka Ghatanji District Yavatmal PIN 445301 admeasuring 1241,95 sq.mts. area being developed by [Owner/Promoter] 1. Following technical professionals are appointed by Owner / Promoter :- (i) M/s /Shriismt Anand Jain as L.S. / Architect ; ___-. (ii) M/s /Shri/Smt as Structural Consultant /Shri/Smt (iii) M/s . as MEP Consultant (iv) M/s /Shri/Smt as Quantity Surveyor * 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under - reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by _-_ quantity Surveyor* appointed by Developer/Engineer, and the assumption ofthe cost of material, labour and other inputs made by developer, and the site inspection carried out by us. -t aforesaid project 3. We estimate Total Estimated Cost of completion of the building(s) of the Total under reference aS Rs. 1,13,35,530/. (Total of Table A and B). The estimated completed for cost of project is with reference to the civil, MEP and allied works required to be building(s) from the purpose of obtaining occupation certificate / completion certificate for the the - being the planning Authority under whose jurisdiction the aforesaid project is being imPlemented. 4. The Estimated cost lncuned till date is calculated at Rs. t,t3,35'530/- Total of Table A and B)-. The amount of Estimated cost lncurred is calculated on the base of amount of Total Estimated Cost. of the Buitding(s) of 5. The Balance cost of Completion of the Civil, MEP and Allied works from the subject project to obtain occupation certificate / completion certificate ,l,13,35,530/- I -------(planning A and B). Authority) is estimated at Re' ( Total of Table 6, I certify that the cost of the civil, MEP and allied work for the aforesaid Projecl as completedonthedateofthiscertificateisasgiveninTableAandBbelow: TaaLs A Building M/ing bearing Number--- or called Bulilding A (shopping complex) (to be prepared separately for each Building M/ing of the Real Estate Project) Sr. No Particulars Amounts 1) Total Estimated cost of the buildingtuing Rs. 60,19,647/- as on 29/08/2017 date of Registration is 2 Cost incurred as on 2910812017 Rs. 52,35,0001 (based on the Estimated cost ) 3 Work done in Percentage 87% (as Percentage of the estimated cost ) 4 Balance Cost to be lncurred Rs. 7,84,647r- (Based on Estimated Cost) 5 Cost lncuned on Additional /Extra ltems Rs. nil as on 29/08/2017not included in the Estimated Cost (Annexure A) Tmle A ai EuildirB /llVing bearing Number--- or called Bulilding B (Aparknent) (to bc prepared separately for each Building M/ing of the Real Estate Project) Sr. No Particulars Amounts i 1) Total Estimated cost of the buildingulving Rs.53,15,88'l/- as on 29/08/2017 date of Registration is 2 Cost incr.rned as on 29/08f2017 Rs. 9,31,600/- (based on the Estimated cost ) Work done in Percentage 18 olo (as Percentage of ihe estimated cost ) Balance Cost to be lncuned Rs.43,84,284/- (Based on Estimated Cost) Cost lncuned on Additional /Extra ltems Rs. nil as on 29/08/20{7 not included in the Estimated Cost (Annexure A) TleLe B (to be prepared for the entire registered phase of the Real Estate Project) Sr. No. Particulars Amounts (1) (2) (3) f ) Total Estimated cost of the lntemal and Extemal Development Works including amenities and Facilities in the layout as on 29/08/2017 date of Registration is 1) Cost incurred as on 29/08/2017 Rs nil (based on the Estimated cost). 2l Work done in Percentage nil % (as Percentage of the estimated cost). 3) Balance Cost to be lncuned Rs. nil (Based on Estimated Cost). 4l Cost lncurred on Additional /Extra ltems nil as on 29/08/2017 not included in the Estimated Cost (Annexure A). ,ffi Yours Faithfully, iignature of Engineer. icence No.M(6/SP.Q 3ll, z4l2- * Note : 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/Completion Certificate. 2. (.) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. I ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") and in case quantity are being calculated by office of Engineer, the name of the person in the offce of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incuned / to be incurred. 5. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra/Additional ltems executed with Cost (which were not part of the original Estimate of Total Cost)