LICENCED ENGINEER L.S. NO. NrT.2445 NO. 21, KUBER REGENCY NEAR ALL INDIA REPORTER PRESS CONGRESS NAGAR., NAGPUR. PH. NO.9822947996 Annexure - B FORM - 2 [See Regulation 3] ENGINEER'S CERTIFICATE Money from Designated Bank Account) Date:30-09-2024 I To, Tushar Santosh Kumar Agarwal, H imayathnagar, Hyderabad. Subject: certificate of cost lncurred for Development of ,,vaishno city,, having MahaREM Registration Number P50900046440 (Only applicable after Project Registration) being Developed by Tushar Santosh KumarAgarwat. Sir, 1. l /We Nitin M Zade have undertaken having MahaRERA Registration Number P50900046440 (0nly applicabte after project Registration) being Developed by Tushar Santosh KumarAgarwal. t 2. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Cohsultants' The Schedule of ltems & Quantity required for the entire work as calculated by Nitin M Zade Quantity Surveyor* appointed by the Developer/Engineer, the assumption of 6e codt ot material, labour & other inputs made by the Developer, and the Site lnspection carried out by us to ascertain / confirm the above analysis given to us. *a}rr- - 3, We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at !s' 33,00,000/'Total of Table A & B) at the time of Registration. The estimated Totat Cost of Project is with reference to the Civil, MEP & Allied Works completion of the apartments & proportionate completion of internal & external works, as per the specifications mentioned in the Agreement of sale & for the purpose of obtaining occupation certificate / completion certificate for the Building(s) / Wing(s) / Layout / Plotted Development from the SDg Warora being the planning Authority under whose jurisdiction the aforesaid project is being implemented. a 4. The Estimated Cost incurred till date is calculates to Rs. 14,78,450/-Total of Table A & B). The Amount of Estlm.a.te.d..Q.q.qt.Jn.qur!'.ed. js..calsutaLed..qn.lhe.bas.Ls..qf" j.nput.mate.ria.ts./..qeryr-c.es.us.e.d .& .un rt q-o.s!..qf. t.h.e.Ee .ite.ms. r5. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & proportionate completion of internal & external works, as per specifications mentioned in Agreement of Sale, of the aforesaid project is estimated at Rs.lg,2l,550/- (Total of rable A & B). 6. I Cprtify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid project as completed on the date of this certificate is as given in Table A & B below: TABLE - A Building / Wing I Layoul / Plotted Development bearing Number 23O or called a vaishno city (to be prepared separatery of each Building wing Layout / Plotted Development of the Real Estate project) / I S. No. Particulars Amount (in Rs.) 1. Total Estimated Cost of Buitding I WingJ Ltou, ptotted 33,00,000/- as on date of Registration is 2. Cost incurred as on date of Certificate 14.78.450t- 3. Work Done in Percentage (as percentage qEsttmated 44.80Y0 i4. Balance Cost to be incurred *" ((based on Estimated 18,21,5501- 5. Cost incurred on Additional / Extra ttemi not inctuOeO in the Estimated Cost (Table-C TABLE - B Internal & External Development works in respect of Registered phase S. No. Particulars Amount (in Rs.) 1 Total Estimated Cost of lnternal & External Oevetoprnent NA Works including amenities & facilities in the Layout as on date of Registration is 2. Cost incurred as on date of Certificate NA 3. Work Done in Percentage (as percentage of Estirn.ated NA Cost) 4. Balance Cost to be incurred ** ((based on Estimated NA eost) 5. Cost incurred on Additional / Extra ltems not included in NA the Estimated Cost (Tabte-C) Yours faithfully, Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer 1ffot /ess than Bachelor's Degree Hotder or equivalent as per section 2(u) of the Actl Local Authority License Number (if appticable) v*r Nitin M. Zade Consulting Civil Enginee NMC Lic No. 573 NIT Lic No.:2445 Agreed & Accepted by: <$,'!L'+-' I l Signature of Promoter Name:Tushar Santosh kumar Aganrual Date:30-09-2024 Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to sale. 2' (") Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated i should be mentioned at the place marked (.). (**) Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate project will result in an amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative & not exhaustive Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABLE. C List of Extra / Additional / Deleted Items considered in the cost (which were not parts of the original Estimate of rotal cost) S. No. List of Extra / Additional / Deleted ltems Amount (in Rs.) 1. 2.