NITIN M.ZADE TICENCED ENGINEER L.S. NO. NtT.2445 NMC 573 NO. 21, KUBER REGENCY NEAR AtL INDIA REPORTER PRESS CONGRESS NAGAR., NAGPUR. PH. NO.9822947996 Annexure - B [.oRM - 2 [See Regutation Ol ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of ongoing project and for withdrawal of Money from Designated Bank Account) Date:31-12-2021 TO, Tushar Santosh Kumar Agarwal, H imayath nagar, Hyderabad. Subject: certificate of cost rncurred for Deveropment of ,,vaishno city, having MahaREM Registration Number p50900046440 (onry appricabre after project Registration) Developed by Tushar Santosh Kumar being Aganrva!. Sir, 1. Itwe Nitin M Zade have undertaken assignment ofcertirying Estimated cost for,,vaishno having MahaREM Registration Number psogoool6440 city,, (on1y Jppticabte after project Registration) being Developed by Tushar Santosh Kumar Aganrval. 2. we have estimated the cost of civil, MEP and Allied works required for completion of the apartments & proportionate completion of internal & external works of the project as per mentioned in the Agreement of sale' the specifications Our estimated cost calculations are based Drawings/Plans made available to on the us for the Project under Reference by consultants' The schedule of ltems & the Devetopers / Quantity required for the entire work as calculated by litin M Zade Quantity surveyor* appointed by the Deveroper/Engineer, the assumption material' labour & other inputs made of the cost of by the Developer, and the site lnspection carried out by us to ascertain / confirm the above analysis given to us. We estimate Total Estimated Cost of completion of the aforesaid Project mentioned under reference at Rs. 33,00,000/-Total of Table A & B) at the time of Registration. The estimated Total Cost of Project is with reference to the Civil, MEP & Allied Works completion of the apartments & proportionate completion of internal & external works, as per the specifications mentioned in the Agreement of Sale & for the purpose of obtaining Occupation Certificate / Completion Certificate for the Building(s) / Wing(s) / Layout / Plotted Development from the SDO Warora being the Planning Authority under whose jurisdiction the aforesaid Project is being implemented. The Estimated Cost incurred till date is calculates to Rs. 14,78,450/-Total of Table A & B). The Amount of -Estim-a.te.d..c..o.st j.n-qurred.is..caJcul.a.tpd.-qn.!h-e.basi-s.-qf.inBut.materiaLq./..seryr.eps.us.e.d..& -un it. -c-o-s.t .qf..th.es -e. -lte.m.s. The Balance Cost of completion of the Civil, MEP & Allied Works for completion of Apartments & prpportionate completion of internal & externalworks, as per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimated at Rs.18,21,550/- (Total of Table A & B). I Certify that the cost of Civil, MEP & Allied Work for apartments & proportionate internal & external works, as per the specifications mentioned in Agreement of Sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B below: TABLE - A Building / Wing / Layout / Plotted Development bearing Number 230 or called Valshno Ctty (to be prepared separately of each Building / Wing / Layout / Plotted Development of the Real Estate Project) S. No. Particulars Amount (in Rs.) 1. Total Estimated Cost of Building / Wing / Layout / Plotted 33,00,000/- Development as on date of Reqistration is 2. Cost incurred as on date of Certificate 14,78,450t- 3. Work Done in Percentage (as Percentage of Estimated 44.800/o Cost) 4. Balance Cost to be incurred ** ((based on Estimated 18,21,5501- Cost) 5. Cost incurred on Additional/ Extra ltems not included in the Estimated Cost fiable-C) TABLE. B Internal & External Development works in respect of Registered phase S. No. Particulars Amount (in Rs.) 1. Total Estimated Cost of lnternal & External Development NA Works including amenities & facilities in the Layout as on date of Registration is 2. Cost incurred as on date of Certificate NA 3. Work Done in Percentage (as Percentage of Estimated NA lqq0 4. Balance Cost to be incurred ** ((based on Estimated NA Cost) 5. Cost incurred on Additional/ Extra ltems not included in NA the Estimated Cost (Tabte-C) Yours faithfully, \ __{ Signature & Name (lN BLOGK LETTERS) with Stamp of Engineer \) /A/or /ess than Bachetor's Desree Hotder or equivatent as per section 2(u) or the A@"r#ii? AI;,rZifn"""" LocalAuthority License Number (if appticabte) #;".,i'irf;ilj M Agreed & Accepted by: Signature of Promoter Name:Tushar Santosh kumar Agarwal Date:31-12-2023 Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. (.) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) & in case quantity are being calculated by office of Engineer, the name of person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). ("*) Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate project will result in an amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative & not exhaustive Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABLE - C List of Extra / Additional / Deleted Items considered in the cost (which were not parts of the original Estimate of rotal cost) S. No. !!lt of Extra / Additionat / Deleted ttems Amount (in Rs.) 1 2.