NITIN M.ZADE LICENCED ENG]NEER r.s. No. NtT.2445 NMC 573 NO' 21, KUBER REGENCY NEAR ALt INDIA REPoRTER PRESS CONGRESS NAGAR., NAGPUR. PH. NO.9822947995 Annexure - B roRM - 2 [See Regulation Ol ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Bank Account) Date:30-06-2023 To, Tushar Santosh Kumar Agarwal, H imayathnagar,Hyderabad. Subject: Gertificate of cost lncurred for Development of "vaishno city,, having MahaREM Registration Number P50900045856 (Only applicable after Project Registration) being Developed by Tushar Santosh Kumar Agarwat. Sir, 1. I f+Ue Nitin M Zade have undertaken assignment of4ertifying Estimated Cost for,,Vaishno City,, having MahaREM Registration Number P50900045856 (0nly applicable after Project Registration) being Developed by Tushar Santosh KumarAgarwal. 2. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments & proportionate completion of internal & external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the DrawingsiPlans made available to us for the Project under Reference by the Developers / Consultants. The Schedule of ltems & Quantity required for the entire work as calculated by Nitin M Zade Quantity Surveyor* appointed by the Developer/Engineer, the assumption of the cost of material, labour & other inputs made by the Developer, and the Site lnspection carried out by us to ascertain / confirm the above analysis given to us. project mentioned under reference of compretion of the aforesaid 3. we estimate Totar Estimated cost atRs.44,00,000/-TotalofTableA&B)atthetimeofRegistration'TheestimatedTotalcostof of the apartments & Project is with reference to the civil, MEP & Allied works completion mentioned in the completion of internal &-external works' as per the specifications proportionate tor / compretion certificate of Sare'& for the purpose of obtaining .ccupation certificate Agreement warora being the Planning the Building(s) / wing(s) / Layout / Plotted Development from the sDo implemented' jurisdiction the aforesaid Proiect is being Authority uno., *noJ, 4.TheEstimatedcostincurredtilldateiscalculatestoRs'1g'72'684t-TotalofTableA&B)'The -servr'-ces'u$-e'd -& Amount of .EStim.a.ted..c..o..Et.!nqurr.ed.!s---c-alcutaled"qn'lh'e'basiE'-q!'input'mate-rial-s-/ q.q.s!. -q!- Ih es e- -ite-m's' u n it. of Apartments & MEp & Aried works for compretion 5. The Barance cost of compretion of the civir, mentioned in Agreement & externatworks' as per specifications proportionate completion of internal ofsale,oftheaforesaidprojectisestimatedatRs.24,2T,3ls/'(TotalofrableA&B)' internar & external for apartments & proportionate 6. r certify that the cost of civir, MEp & Aried workin Agreement of Sale, of the aforesaid Project as mentioned works, aS per the specifications completedonthedateofthiscertificateisasgiveninTableA&Bbelow: TABLE - A Building/Wing/Layout/PlottedDevelopmentbearingNumber2g3orcalled VaishnoCity(tobepreparea".pu'"t"tyoreactrBuilding/WinglLayoutl Real Estate Project) Plotted Development of the ut / Plotted o"r.tooment as on O f Estimated n Estimated t included in the Estimated Gost (Table-C TABLE - B Internal & External Development Works in respect of Registered Phase S. No. Particulars Amount (in Rs.) 1. Total Estimated Cost of lnternal & External Development NA Works including amenities & facilities in the Layout as on date of Reqistration is 2. Cost incurred as on date of Certificate NA 3. Work Done in Percentage (as Percentage of Estimated NA Cost) 4. Balance Cost to be incurred "* ((based on Estimated NA Cost) 5. Cost incurred on Additional / Extra ltems not included in NA the Estimated Cost [able-C) Yours faithfully, Signature & Name (lN BLOCK LETTERS) with Stamp of Engineer Nitin M. Zade [Not /ess than Bachelor's Degree Holder or equivalent as per Section 2(u) of the \jar egnSUlting Civil Enginee NMC Lic No.573 Local Authority License Number (if applicable) NIT Lic ilo.:2445 Agreed & Accepted by: Signat[re df Promoter Name:Tushar Santosh kumar Agarwal Date:30-06-2023 Note: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time as per specifications mentioned in the Agreement to Sale. 2. (.) Quantity Survey can be done by the office of Engineer or can be done by an independent Quantity Surveyor, who's Certificate of Quantity Calculated, can be relied up on by Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) & in case quantity are being calculated by otfice of Engineer, the name of person in the otfice of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). (**) Balance Cost to be incurred (4) may vary from difference between Total Estimated Cost (1) & actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an Estimated Cost any deviation quantity required for the Development of Real Estate project will result in an amendment of the cost inrurred / to be inorred. 4. All components of work with specifications are indicative & not exhaustive 5. Please specify if there are any deviations / qualifications. Example: Any deviation in input material used from specifications in Agreement of Sale. TABLE. C List of Extra / Additional / Deleted ltems considered in the cost (Which were not parts of the original Estimate of Total Cost) S. No. List of Extra / Additional / Deleted ltems Amount (in Rs.) 1 2. ,