i. Engg. Saehtn Vy. Kadhtkhaye d#3SSlS33i Englneer & Contrsctor Head Offrce :-Tilak Nagar BRAMHAPURI, Dlst. Chandrapur -441206 E-n8ll - sachin-wk@rediffrp g[gq;1J.-,. sachin. kadhl@gmall. com : Ref. No. FORM. 2A Dote: (See MahaRERA Order No. 5 of 2018) ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site Superyisor's Certilicate) (To be submitted at the end of Financia-l Year) Date:31-03-2023 To, The Shri. Mahendra Shravan Bokade & 7 Other. Gujari Ward, Bramhapuri-441206 QUALITY ASSURANCE CERTIFICATE (Certihcate No -2 for the Year Ending 31-03-2023) Subject: Certificate for quality materials used and quality of Construction & workmanship for the work of Bokade Layout having MahaRERA reglstration Number P50900023571 being ' developed by Mahendra Shravan Bokade & 7 Other. Sir, I Sachin Kadhikhaye have undertaken an assignment of supervision of this Real Estate project. OUR RESPONSIBILITY I / We are responsible for carrying out the work in accordance with that with development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in-situ or in authorised laboratory and to ensure quality of work & workmanship as per prescribed specifications, & as per NBC and/or other relevant code of practice. ' 11l INPUT MATERIALS, FIXTURES & FITTINGS I / We hereby certify that all Construction material, Fixtures and Fittings with regard to the flooring, Electrical, Sanitary Fittings, etc and amenities to be provided by the Promoter in the said project, building and the Apartment as are as per specifications mentioned in Annexure 'E', of Agreement to Sale. ir For those items, where no specification have been mentioned in Agreement of Sale, the Materials, Fixtures and Fittings used conform to the relevant BIS Standard / lS 7 National Building Codes or as per lndustry Standards. t2l WoRKMANSHIP ,.j I / We hereby certify that the work has been carried out under our supervision. We further certify that workmanship and quality is satisfactory and up to the mark and the work has been acceptable within the permissible limits of deviation as per relevant code of practice. t3l STRUCTURAL ENGTNEER Promoters have engaged structural engineer Mrl_having License No having Office No , Cell No The structural design of buildings in this Project has been done under his supervision. The formwork and concrete mix design has bben done as per lS 10262:2009 or as per other relevant codes as applicable. His periodic checks and certificates for STABILITy and SAFETY have been kept on record. lsl PRESERVATTON OF RECORDS Record of all test results of this Project have been properly kept in the prescribed format and will be preserved at least up to the Defect Liability Period or for the period as required by any other provision of Law. Please specify deviation in quality of materials or any other item of work which were not conforming to the specifications as mentioned in Agreement of sale. Yours faithfully, \t$f, Supervisor) \S Signature of Engineer (Site Name: Sachin Kadhikhaye Er. Sachin tttXadhikhaye Qualification (not less than Graduate)_Tilaknagar, Bramhapuri License No (if any). tCB irg.llo.CCC0IIRll0llJAPtl0000l MobireNo: 4Q236/?D// Place. I *^ ,.{il Agreed & Accepted by: Signature of Promoter Name:Mahindra Bokade Date:31-03-2023