The Maharashtra Real Estate Regulatory Authority (General) Regulations 2017 Form-2 [See Regulation 3] ENGI NEER'S CERT!FtCATE (To be submitted at the time of Registration of ongoing project and for withdrawal of Money from Designated Accou nt-project-wise) Date: 30/06/2021 To Shri. Mahendra Shravan Bokade & 7 Other. Gujari Ward, Bramhapuri-447206 Subject:Certificate of Cost lncurred for Development of Shri. Mahendra Shravan Bokade & 7 other.for Construction Work of Single Phase of the Layout project "Bokade Layout,, [P50900023571] situated on the Khasra No. 447, demarcated by its boundaries tayout of Naidu pise totheNorth, Boundaries of Delanwadi - Bramhapuri totheSouth, layout of Naidu pise and wairkar to theEast, layout of Tushar Raut to the West, Division- Nagpur, Village- Bramhapuri, Taluka- Bramhapuri District-Chandrapur,PlN: 441205 admeasuring 12100.00 Sq.m. area being jointly developed by Shri. Mahendra shravan Bokade & 7 other. Ref: MahaRERA Registration Number P5O9OOO23571 Sir, lSachin Kadhikhave have undertaken assignment as Licensed Surveyor of certifvine percentage of Completion of Construction Work of Single Phase of the Layout project "Bokade Layout,, [P50900023571] situated on the Survey No. 44TDivision- Nagpur, Village- Bramhapuri, Taluka- Bramhapuri District-Chandrapur,PlN: 441205 admeasuring 12100.00 Sq.m. area being jointly developed by Shri. Mahendra Shravan Bokade & 7 Other. L. Following technical professionals are appointed by owner/promoter:- i. W/Shri/S"m+Sacn6Xq4h*["*as Licensed Surveyor; ii. A#s/Sfrri/Sm+_ as Structural Consultant; iii, Shri. as MEp Consultant; iv. Shri. Sachin Kadhikhayeas euantity Surveyor; 2. we have estimated the cost of the completion to obtain occupation certificate completion certificate, of the civil, MEP and Allied works, of the Layout project. our estimated cost calculations are based on the Drawings/ plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated bysachin Kadhikhayequantity survivor appointed by Developer/Engineer, and the assumption of the cost of material labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated cost of completion of the Layout project under reference as Rs'49,50,ooo l- (Total of Table A and B). The estimatedTotal cost of project is with reference to the civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate/ completion certificate for the layout from the Nagar Parishad Brahmapuri being the planning Authority under whose jurisdiction the aforesaid project is being lmplemented. 4 The Estimated cost lncurred till date is calculated at RS.Rs.7,01,000/-(Total of table A and B). The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 5 The balance cost of completion of the civil, MEp and Allied works of the Layout of the subject project to obtain occupation certificate/ completion certificate fromNagar Parishad Brahmapuri(Planning Authority) is estimated at Rs.42,4g,ooo/- (Total of table A and B), 6 lcertifythe cost of the civil, MEP and allied workforthe aforesaid project as completed on the date of this certificate is as given in Table A and B below: TABLE-B be nrenared for the entire hase of the Real Estate Project Sr.No Amounts t ffi Rs49,50,000 /- works including amenities and Facilities in the layout as on date of Registration Cost incurred as on(based on the Estimated cost) Rs.7,01,000/- 2 L4.L6% 3 work done in Percentage (as Percentage of the Estimated cost) 4 Balance Cost to be lncurred (Based on Estimated cost) Rs.42,49,000/- N.A. 5 Cost lncurred on Additional/ Extra items as on not included in the Estimated Cost (Annexure A) Yours Faithfully (License No. N ) rJlo lal.l - 51 1.29g The Maharashtra Real Estate Regulatory Authority (General) Regulations 2017 *Note t. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/ Completion Certificate' 2. (*)euantity survey can be done by office of Engineer or can be done by an independent by the euantity Surveyor, whose certificate of quantity calculated can be relied upon The Engineer. ln case of independent quantity survivor being appointed by developer' name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of engineer, The name of the person the office of engineer, who is (*). responsible for the quantity calculated should be mentioned at the place marked 3. The estimated cost includes all labour, material equipment and machinery required to carry out entire work. 4. As this an estimated cost any division in quantity required for development of the real estate project will result amendment of the cost inquired / to be inquired' 5. All components of work with specification are indicative and not exhaustive. Annexure List of Extra / additional ltems executed with Cost (which were not part of the original estimated of tota! cost)NlL