Form L [See Regulation 3] ARCH ITECT,S CE RTI FICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 3L/L2/2021 To, Shri. Mahendra Shravan Bokade &7 Other. Gujari Ward, Bramhapuri-4412OG Subject:Certificate of Percentage of Completion of Construction Work of Single Phase of the Layout Project "Bokade Layout"IP50900023571] situated on theKhasra No.447, demarcated by its boundarieslayout of Naidu pisetotheNorth, Boundaries of Delanwadi BramhapuritotheSouth,layout of Naidu pise and Wairkarto theEast, layout of Tushar Rautto the West, Division- Nagpur, Village- Bramhapuri, Taluka-Bramhapuri District- Chandrapur,PlN:441206 admeasuring 12100.00Sq.m. area being jointly developed by Shri. Mahendra Shravan Bokade & 7 Other. Sir, lSachin Kadhikhavehave undertaken assignment as Licensed Surveyor of certifying Percentage of Completion of Construction Work of Single Phase of the Layout Project "Bokade Layout"[P50900023571] situated on theKhasra No. 44TDivision- Nagpur, Village- Bramhapuri, Taluka- Bramhapuri, District-Chandrapur, PIN: 441206 admeasuring 12100.00 Sq.m. area being jointly developed by Shri. Mahendra Shravan Bokade & 7 Other. +n#/S h rilsmt5Aghrn Kaflhjkheyea s Li ce ns e d S u rve yo r; (i) l\4#/shri/smt as StructuralConsultant (ii) M#/Shri/s'{m+ as MEPConsultant (iiD M/s /Sh ri/Sachin Kadhikhave as Qua ntitySu pervisor Based on site lnspection with respect to Layout Project of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for complete layout of the aforesaid Real Estate as registered vide number under MahaRERA is [p5090002357L1as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. Table A Sr. Tasks /Activity Percentage of work No Done 1, Excavation NA 2 1 number of Basement(s) and plinth NA 3 0 number of Podiums NA 4 l Stilt Floor NA 5 4 number of Slabs of Super Structure NA 5 lnternal walls, lnternal Plaster, Floorings within NA Flats/Premises, Doors and Windows to each of the Flat/Premises 7 sanitary Fitting within the Flat/premises, Electrical fittings NA within the Flat /premises 8 5tatrcases, Litts Wells and lobbies at each floor level NA connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, NA completion of terraces with waterproofing of the Building/Wing L0 lnstallation of lifts, water pumps, Fire Fighting fittings anO NA Equipment as per CFO NOC, Electrical Fitting to Common Areas, electro, mechanical Equipment, Compliance to condition of environment/CRz NOC , Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing and all other requirements as may be required to Obtain Occupation / Completion certificate TABLE-B phase lnternal and External Development work in Respect of the entire Registered Common areas and Facilities, Proposed Percentage of Details Sr. no Amenities (Yes/No) work done WBM t lnternal Roads and footPaths YES 23% YES o% We 2 Water Supply Sewerage (chamber, lines, Septic Tank, No o% 3 STP) YES o% Strorm Water 4 Storm Water Drains . Drains Landscaping and tree Planting YES 0% Tree Plantation 5 Street lighting YES 0% Street Light 6 Community buildings No o% 7 Treatment and disposal of sewage and No o% 8 sullage water Solid waste management and disposal No o% 9 Rain Water 10 Water conservation, Rain water YES o% harvesting harvesting L7 Energy Management No o% L2 Fire protection and fi re safety No o% Requirement Electrical meter room, Substation, YES 0% Transformer 13 receiving station L4 Other (Option to Add More) No o% Yours Faithfully .N Civil Engineer (License No. ?1i,)?lilil;".',.. vlDc-6963, MGP'lti '