Form L [See Regulation 3] ARCH ITECT'S CERTI FICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 3O/06/2O2L To, Shri. Mahendra Shravan Bokade &7 Other. GujariWard, Bramhapuri-44L206 Subiect:Certificate of Percentage of Completion of Construction Work of Single Phase of the Layout Project "Bokade Layout"[P50900023571] situated on theKhasra No.447, demarcated by its boundarieslayout of Naidu pisetotheNorth, Boundaries of Delanwadi BramhapuritotheSouth,layout of Naidu pise and Wairkarto theEast, tayout of Tushar Rautto the West, Division- Nagpur, Village- Bramhapuri, Taluka-Bramhapuri District- Chandrapur,PlN:441205 admeasuring 12100.00Sq.m. area being jointly developed by Shri. Mahendra Shravan Bokade & 7 Other. Sir, lSachin Kadhikhavehave undertaken assignment as Licensed Surveyor of certifying Percentage of Completion of Construction Work of Single Phase of the Layout Project "Bokade Layout"[P50900023571] situated on theKhasra No. 44TDivision- Nagpur, Village- Bramhapuri, Taluka- Bramhapuri, District-Chandrapur, PIN: 441205 admeasuring 12100.00 Sq.m. area being jointly developed by Shri. Mahendra Shravan Bokade & 7 Other. M#/S h rilSmtSaSXU Ka dliXheyea s Lice nsed S u rveyo r; tD MlslShri/smt as Structu ralConsultant tiD M/s/Shri/sm+ as MEPConsultant [iiD M/s /Shri/Sachin Kadhikhave as QuantitySupervisor Based on site lnspection with respect to Layout Project of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for complete layout I of the aforesaid Real Estate as registered vide number under MahaRERA is [P50900023571] as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. Table A @ ) Sr. Tasks /Activity Percentage of work No Done L Excavation NA 2 1 number of Basement(s) and Plinth NA 3 0 number of Podiums NA 4 l Stilt Floor NA 5 4 number of Slabs of Super Structure NA 6 lnternal walls, lnternal Plaster, Floorings within NA Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fitting within the Flat/Premises, Electrical fittings NA within the Flat /Premises 8 Staircases, Lifts Wells and lobbies at each floor level NA connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, NA completion of terraces with waterproof ing of the Building/Wing 10 lnstallation of lifts, water pumps, Fire Fighting fittings and NA Equipment as per CFO NOC, Electrical Fitting to Common Areas, electro, mechanical Equipment, Compliance to condition of environment/CRz NOC , Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing and all other requirements as may be required to Obtain Occupation / Completion certificate _I TABLE-B lnternal and External Development Work in Respect of the entire Registered phase Sr. Common areas and Facilities, Proposed Percentage of Details no Amenities (Yes/No) work done L lnternal Roads and footpaths YES t4% WBM 2 Water Supply YES o% We 3 Sewerage (chamber, lines, Septic Tank, No 0% STP) 4 Storm Water Drains YES o% Strorm Water ' Drains 5 Landscaping and tree planting YES o% Tree Plantation 5 Street lightine YES o% Street Lisht 7 Community buildings No o% 8 Treatment and disposal of sewage and No o% sullage water 9 Solid waste management and disposal No 0% 10 Water conservation, Rain water YES o% Rain Water harvesting harvesting LL Energv Management No o% L2 Fire protection and fire safety No o% Requirement 13 Electrical meter room, Substation, YES o% Transformer receiving station t4 Other (Option to Add More) No 0% (License No. ?Ji.11;;;.." ';' ,,,, VtDC-rJr'ri, r',-,P' .'::' "