Form 1 [See Regulation 3] ARCH ITECT'S CE RTI FICATE (To be submitted at the time of Registration of Ongoing project and for withdrawal of Money from Designated Account) Date: 31,h2/2020 To, Shri. Mahendra Shravan Bokade &7 Other. Gujari Ward, Bramhapuri-44L206 subject:certificate of Percentage of completion of construction work of single phase of the Layout Project "Bokade Layout"[P5o9ooo23s71] situated on theKhasra No.a47-, demarcated by its boundarieslayout of Naidu pisetotheNorth, Boundaries of Delanwadi BramhapuritotheSouth,tayout of Naidu pise and wairkarto theEast, layout of Tushar Rautto the west, Division- Nagpur, village- Bramhapuri, Taluka-Bramhapuri District_ chandrapur,PlN:441205 admeasuring 12100.00Sq.m. area being jointly developed by Shri. Mahendra Shravan Bokade & 7 Other. Sir, lSachin Kadhikhavehave undertaken assignment as Licensed surveyor of certifying percentage of completion of construction work of single phase of the Layout project .,Bokade Layout"[P50900023571] situated on theKhasra No. 44TDivision- Nagpur, Village- Bramhapuri, Taluka- Bramhapuri, District-chandrapur, PIN: 441206 admeasuring 12100.00 sq.m. area being jointly developed by Shri. Mahendra Shravan Bokade & 7 Other. Mr4lS tr r i/S,m+5UrliOOU4OOOUOa s Li c e n s e d S u rveyo r; ti) Aq/+/shri/smr .as StructuralConsultant (ii) MAlSfrriTS+n+_as MEpConsultant [iii) M/s /Shri/Sachin--Kadhikhare as euantitySupervisor Based on site rnspection with respect to Layout project of the aforesaid Real Estate project, I certify that as on the date of this certificate, the percentage r of Work done for complete layout of the aforesaid Real Estate as registered vide number under MahaRERA is [p50g00023571] as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. Table A Sr. Tasks /Activity' Percentage of work No Done 1, Excavation NA 2 1 number of Basement(s) and plinth NA 3 0 number of Podiums NA 4 l Stilt Floor NA 5 4 number of Slabs of Super Structure NA 5 lnternal walls, lnternal plaster, Floorings within NA Flats/Premises, Doors and Windows to each of the Flat/Premises 7 sanitary Fitting within the Flat/premises, Electrical fittings NA within the Flat /Premises 8 Staircases, Lifts Wells and lobbies at each floor level NA connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, NA completion of terraces with waterproofing of the Building/Wing 10 lnstallation of lifts, water pumps, Fire Fighting fittings and NA Equipment as per CFO NOC, Electrical Fitting to Common Areas, electro, mechanical Equipment, Compliance to condition of environment/CRz NOC , Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing and all other requirements as may be required to Obtain Occupation / Completion certificate TABLE-B lnternal and External Development Work in Respect of the entire Registered phase Sr. Common areas and Facilities, Proposed Percentage of Details no Amenities (Yes/No) work done L lnternal Roads and footpaths YES 8% WBM 2 Water Supply YES o% Well 3 Sewerage (chamber, lines, Septic Tank, No o% srP) 4 Storm Water Drains YES o% Strorm Water 'Drains 5 Landscaping and tree planting YES 0% Tree Plantation 6 Street lighting YES 0% Street Light 7 Community buildings No o% 8 Treatment and disposal of sewage and No o% sullage water 9 Solid waste management and disposal No o% 10 Water conservation, Rain water YES o% Rain Water harvesting harvesting 1,L Energy Management No o% L2 Fire protection and fire safety No o% Requirement 13 Electrical meter room, Substation, YES o% Transformer receiving station 1,4 Other (Option to Add More) No o% Yours Faithfully (License No._)