Form 1 [See Regulation 3] ARCH ITECT,S CERTI FICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date 301612020 To, Shri. Mahendra Shravan Bokade &7 Other. Gujari Ward, Bramhapuri-441206 Phase of the Subject:Certificate of Percentage of Completion of Construction Work of Single ,,Bokade Layout"[P50900023571] situated on theKhasraNo.447, demarcated by Layout project its boundarieslayout of Naidu pisetotheNorth, Boundaries of Delanwadi Tushar Rautto the BramhapuritotheSouth,layout of Naidu pise and Wairkarto theEast, layout of District- west, Divlsion- Nagpur, Village- Bramhapuri, Taluka-Bramhapuri jointly by Shri' developed Chandrapur,plN:441206 admeasuring 12100.00Sq.m. area being Mahendra Shravan Bokade & 7 Other, Sir, lsachinKadhikhavehave undertaken assignment as Licensed Surveyor of certifying Percentage of completion of construction work of single Phase of the Layout Project "Bokade Layout,,[p5OgOOO23571] situated on theKhasra No. 4TDivision- Nagpur, Village- Bramhapuri, Taluka- Bramhapuri, District-Chandrapur, PIN: 441205 admeasuring 12100.00 Sq.m' area being jointly developed by Shri. Mahendra Shravan Bokade & 7 Other. +e#/S h r /SpatSeglfqKa db-i khAyea s Li c e n s e d S u rveyo r; i til MAlshri/s.m+ as StructuralConsultant tii) *q#/Shri/Smt- as MEPConsultant iiii) M/s /Shri/SachinKadhikhave as QuantitySupervisor Based on slte lnspection with respect to Layout Project of the aforesaid Real Estate Project, I for complete layout certify that as on the date of this certificate, the Percentage of Work done of the aforesaid Real Estate as registered vide number under MahaRERA is [P50900023571] as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. Table A Sr. Tasks /Rctivity Percentage of work No Done L Excavation NA 2 1 number of Basement(s) and Plinth NA 3 0 number of Podiums NA 4 l Stilt Floor NA 5 4 number of Slabs of Super Structure NA 6 lnternal walls, lnternal Plaster, Floorings within NA Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fitting within the Flat/Premises, Electrical fittings NA within the Flat /Premises 8 Staircases, Lifts Wells and lobbies at each f loor level NA connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, NA completion of terraces with waterproofing of the Building/Wing 10 lnstallation of lifts, water pumps, Fire Fighting fittings and NA Equipment as per CFO NOC, Electrical Fitting to Common Areas, electro, mechanical Equipment, Compliance to condition of environment/CRz NOC , Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing and all other requirements as may be required to Obtain Occupation / Completion certificate TABLE-B lnternal and External Development Work in Respect of the entire Registered phase Sr. Common areas and Facilities, Proposed Percentage of Details no Amenities (Yes/No) work done 7 lnternal Roads and footpaths YES 5% WBM 2 Water Supplv YES o% We 3 Sewerage (chamber, lines, Septic Tank, No o% sTP) 4 Storm Water Drains YES o% Strorm Water ' Drains 5 Landscaping and tree planting YES o% Tree Plantation 5 Street liehting YES o% Street Light 7 Community buildings No o% 8 Treatment and disposal of sewage and No 0% sullage water 9 Solid waste management and disposal No o% 10 Water conservation, Rain water YES o% Rain Water harvesting harvesting 7L Energy Management No o% L2 Fire protection and fire safetY No o% Requirement 13 Electrical meter room, Substation, YES o% Transformer receiving station L4 Other (Option to Add More) No o% Yours Faithf ully l\ \,.)t"' \. 't' (License No.-)