ER. DHARMENDRA KUMAR PANDIT CIVIL ENGINEER (Reg. No.-CBCEM/R/2018/APL/00014) BUILDING PLANNER, DESIGNER, ESTIMATOR, MOBILE: VASTU CONSULTANT& INTERIOR DESIGNER. 8275084141 Email- dharmendrakumarpandit@yahoo.com 9325994141 VASTU VIEW er.d.pandit4141@gmail.com OFFICE ADD: OPP. DR. K. B. GAURKAR CLINIC, RAMNAGAR ROAD, CHANDRAPUR. (M.S.) PIN CODE-442401 ENGINEER'S CERTIFICATE To MR. ANKLESH N.. KHAIRE, CHANDRAPUR Subject: Certificate of Cost Incurred for Development ADITYA PLAZA situated on the Plot 175/2J bearing Diverted Survey no. 175/2Jdemarcated by its boundaries (latitude and longitude of the end points) to the North PLOT NO- OPEN PART OFSUR. NO. 175/2 to the South BALLARPUR ALLAPALLI ROAD to the East PLOT OF MR.SHAILESH KHANDELWALto the West PLOTOF MR.KALIKAPRASAD V. GUPTAof Chandrapur Division village BALLARPUR taluka BALLARPUR District Chandrapur PIN 442701 admeasuring area 927.50 SQ.M being developed byMR.ANKLESH N.KHAIRE Ref:MahaRERA Registration Number APPLIED Sir, Ihave undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being Building(s) /Block(s) of the Buildings situated on the plot 175/2J_bearing SUR. NO175/2J of Division Village BALLARPUR Taluka BALLARPUR District Chandrapur admeasuring 927.50 sq.mts. are a being developed by MR. ANKLESH N.KHAIRE Following technical professionals are appointed by Owner/ Promoter (i) ER. DHARMENDRA PANDIT (Architect,) (ii AAJ CONSULTANTS (Structural Engineer& Consultant) (i) MR. PRAMOD CHITRIV (MEP Consultant) (iv) ER. DHARMENDRA PANDIT (Quantity Surveyor) 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the buildingls) of the aforesaid project under reference as Rs.-20000000.00- The estimated Total Cost of project is with reference to the Civil MEP and allied works required to be completed for the purpose of obtaining occupation certificate/completion certificate for the buildingls) from the being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4.The Estimated Cost Incurred till date is calculated at Rs. 1,17/3,784of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate/Completion Certificate from MHADA (Planning Authority) isestimated at Rs 82,86,216 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLEA Building BLOCK-A Sr. No Particulars Amounts 1 Total Estimated cost of the building - s on Rs.-2,00,00000/- date of Registration is 2 Cost incurred as on- Rs. 1,17,13 784 3 Work done in Percentage 58 56 acDarcantaaa oaf tha actimatadcoctl RS. 82,86, 2/6 Balance Cost to be Incurred Racad anEctimatad Cost Cost Incurred on Additional /Extra Items Nil As on not included in the Estimated Cost(Annexure A) Table A Building BLOCK- B&C Sr. No Particulars Amounts 1 Total Estimated cost of the building Block B&C as NOT APPLICABLE on date of Registration is Cost incurred as on 15/09/2021 NOT APPLICABLE Work done in Percentage NOT APPLICABLE acParcantaaa af tha actimatadcactl NOT APPLICABLE Balance Cost to be Incurred Racad anEctimatad Cact NOT APPLICABLE 5 Cost Incurred on Additional /Extra Items As on not included in the Estimated Cost(Annexure A) Table A Building BLOCK- D Sr. No Particulars Amounts 1 Total Estimated cost of the building Block D as on NOT APPLICABLE date of Registration is NOT APPLICABLE Cost incurred as on 15/03/202. NOT APPLICABLE Work done in Percentage acDarcantaaa af tha actimatadcact NOT APPLICABLE Balance Cost to be Incurred Racad anEctimatad Cactl NOT APPLICABLE Items 5 Cost Incurred on Additional /Extra Estimated As on not included in the Cost(Annexure A) TABLEB phase of the Real Estate Project) (to be prepared for the entire registered Sr .No Particulars Amounts Internal and External 1 Total Estimated cost of the NOT APPLICABLE and Development Works including amenities Facilities in the layout as on. date of Registration. 2 Cost incurred as on NOT APPLICABLE (based on the Estimated cost) Work done in Percentage NOT APPLICABLE (as Percentage of the estimated cost) NOT APPLICABLE 4 Balance Cost to be Incurred (Based on Estimated Cost) NOT APPLICABLE Cost Incurred on Additional /Extra Itemns As on not included in the Estimated Cost(Annexure A) Yours Faithfully Signatur (License No. (CBCEMIR|2018/APL/00014) KUMAR PANDIT Er. DHARMENDRA Reg. No. CBCEM/R/2018/APL/00014 Building Planner, Designer Estimator & Interior