-. ER. DHARME,NDRA KIJMAR PAI\DIT CryIL ENGINEER No.-CBCEM/R/20 1 81APLI000 1 4 ) BUILDING PLANNER, DESIGNER, ESTIMATOR, MOBILE :- VASTU CONSULTANT & INTERIOR DESIGNER. 821 5084141 Email - dharmendrakumarpandit@ yahoo.com : 9325994t41 er.d. pand it4l 4l@ gmail.com OFFICE ADD :- OPP. DR. K. B. GAURKAR CLINIC, RAMNAGAR ROAD, CHANDRAPUR. O4.S.) PIN CODE-442401 ENGINEER'S CERTIFICATE To MR. ANKLESH N.. KHAIRE, CHANDRAPUR Subject: Certificate of Cost Incurred for Development ADITYA PLAZA situated on the Plot L75l2l bearing Diverted Survey no. LTiiEldemarcated by its boundaries (latitude and longitude of the end points) to the North PLOT NO- OPEN PART OF SUR. NO.- 17512 to the South BALLARPUR AILAPALII ROAD to the East PLOT OF MR. SHAILESH KHANDELWAL to the West PIOT OF MR. KA|IKAPRASAD V. GUPTA of Chandrapur Division village BALLARPUR taluka BALLARPUR District Chandrapur PIN 442701 admeasuring area 927.5O SQ.M being developed by MR. ANKLESH N. KHAIRE Ref:MahaRERA Registration Number APPLIED Sir, I have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being Building(s)/Block(s)of the Buildings situated on the plot L75l2l bearing SUR. NOL75/2 J _of Division Village BALTARPUR Taluka BALLARPUR District Chandrapur admeasuring 927.5O sq.mts. are a being developed by MR. ANKTESH N. KHAIRE. Following technical professionals are appointed by Owner/ Promoter:- (i) ER. DHARMENDRA PANDTT (Architect,) (ii AAJ CONSULTANTS (Structural Engineer& Consultant) (iii) MR. PRAMOD CH|TR|V (MEP Consultant) (i") ER. DHARMENDRA PANDIT (Quantilv Surweyor) 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Ourestimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire rruork as calculated by QuantitySurveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs.-2Og@ggO0EThe estimated Total Cost of project is with reference to the Civil ,MEP and allied works required to be completed for the purpose of obtaining occupation certificate/completion certificate for the building(s) from the being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost lncurred till date is calculated at Rs. 0.00/- . The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil , MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate/Completion Certificate from MHADA (Planning Authority) is estimated at Rs 2,00,00000/-. 6. lcertifythattheCostoftfruCirif,nffpandalliedworkfortheaforesaidProjectascompletedon the date of this certificate is as given in Table A and B below: TABTEA Building BLOCK- A Sr. No Particulars \mounts 'otal Estimated cost of the building --------as on ls. -2,00,00000/- 1 late of Registration is L 3ost incurred as on ------ ls. -0.00/- ! Work done in Percentage )% l^-n^-^^^+^^^ ^f +L^ ^-+i*^+^I I Balance Cost to be lncurred ls. 2,00,00000/- ln^^^l ^-r^ri-^r^l ^^-+\ t Cost lncurred on Additional/Extra ltems Nil--- As on not included in the Estimated Cost(Annexure A) Table A Buildine BLOCK- B&C 5r. No rarticulars Amounts 1 l-otal Estimated cost of the building Block B&C as NOT APPLICABLE rn date of Registration is lost incurred as on t5/O7l2OI7 NOT APPLICABLE 3 Work done in Percentage NOT APPLICABLE J +L^ ^^+:-^+^l 4 Balance Cost to be lncurred NOT APPLICABLE ,h ^ -^ F-!:-- i - - - -t -!^ ^- -t\ 5 lost lncurred on Additional/Extra ltems !OT APPLICABLE \s on not included in the Estimated Sost(Annexure A) Table A Buildi n BLOCK Sr. No Pa rticu la rs Amounts Iotal Estimated cost of the building Block D as on NOT APPLICABLE date of Registration is ) lost incurred as on 1510712017 NOT APPLICABLE //ork done in Percentage NOT APPLICABLE ^f +L^ ^^+:--+^l t Jalance Cost to be lncurred NOT APPLICABLE rh--^l -..r-!:-^!^l ^^^r\ 3ost lncurred on Additional/Extra ltems NOT APPLICABLE As on not included in the Estimated 3ost(Annexure A) TABLEB (to be prepared forthe entire registered phase of the Real Estate Project) articulars Total Estimated cost of the lnternaland External Development Works including amenities and OT APPLICABLE Facilities in the layout as on _ of Registration. Cost incurred as on \OT APPLICABLE Ibased on the Estimated cost) l Work done in Percentage NOT APPLICABLE (as Percentage of the estimated cost) t Jalance Cost to be lncurred \OT APPLICABLE iBased on Estimated Cost) 5 lost lncurred on Additional /Extra ltems \OT APPLICABLE As on not included in :he Estimated Cost(Annexure A) Yours Faithfully Signatur ..._- ) (License No. I cnz;rl iB lzois /APL looor+ ) -ffi -'- DHARMEN Er. DkAi(u rvuB.lll't - No. CBCEM/R12018'APU00014 Reo. DlT Building Planner' Designer Estimator & lnterior