AnnexureA FORM 1 (UT) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: To The ANKLESH (Name & Address of Promoter), KHAIRE Subject: Certificate of Percentage of Completion of Construction Work of ADTY7No. of Building 1 Wingts) of the C1)_LPhase of the Project [MahaRERA Registration Number) situated on the Plot bearing C.N. No/CTS No./Survey no/ Final Plot no 1 b 2 demarcated by its boundaries (latitude and longitude ofthe end points). to the North_to the Southto the East_to the West of village BalkrpiY taluka_Ballgspuo District chndtape PIN442p|_admcasuring 9L7-50sq.mts. area being developed by Promoter's Name Sir, / We DHAMNDRAhave undertaken assignment as Architect /Licensed Surveyor of certitying PAN of Percentage of Completion of Construction Work of the ADiTyh_Building(s 1)Wing(s) PLA2A 1Phase of the Project, situated on the plot bearing C.N. No/CTS No./Survey no./ Final Plot no 175/2/I of village Ballarpu taluka Ball rp District PIN424_admeasuring 927.50_sq.mts. area being developed by chan drapuy [Promoter's Name] ANKLESH Nathu)i Khajse 1. Following technical professionals are appointed by Owner/ Promoter (i) M/s/Shri/Smt_DHARmENDRA as LS./Architect; PANDIT (ii) M/s /Shri/Smt AMAN VERMA as Structural Consultant M/s /Shri/ Smt as MEP Consultant (i) (iv) M/s /Shri/Smt as Site Supervisor Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing 9 MahaRERA 1S as per under P50900023 the vide number of the activity of of the Real Estate Project as registered with respect to each of the work executed The percentage below. table A herein detailed in the Table B. entire phase is Table A the Project) /Wing of each Building separately for Building /Wing Number ( t o be prepared Percentage of work done Tasks /Activity Sr. No HA UEXcavation oo and Plinth number of Basement(s) 2 Stilt Flooor illiiinumber of Slabs of Super Structure Internal walls, Intermal Plaster, 857. 6 Floorings within Flats/Premises, Flat/Premises each of the Doors and Windows to ii MNUSanitary Fittings within the Flat Premises, ie Elecurical Fitings Within 8 Staircases, Lifts Wells and Floor level connecting Lobbies at each Staircases and Lifts, Water Tanks 35/ Overhead and Underground and extemal plaster Thextemal plumbingofiteraces completion With waterproofing bf the Büilding/Wing/!! elevation, f aNN and water pumps, Fire Fighting Fittings Installation of lifts, Common 10 Electrical fittings to as per CFO NOC, conditions Equipment Compliance to mechanical equipment, Areas, electro, to entrance lobby/s, plinth environment/CRZNOC,Finishing of of areas appurtenant to Building/Wing, protection, paving as may be required and all other requirements Compound Wall Certificate toObtain Occupation /Completion Table B entire Registered Phase Works in Respect of the Internal & External Development Percentage of Details Common areas and Proposed No Work done Facilities, Amenities (Yes/No) Internal Roads & Foothpaths No Water Supply YES 7o1. Sewarage (chamber, lines, YES 45 Septic Tank, STP) 10 4 Storm Water Drains YFS 35 5 Landscaping &Tree Planting NO 6 Street Lighting No Community Buildings NO 8 Treatment and disposal of N sewage and sullage water 9 Solid Waste management && No Disposal 10 Water conservation, Rain YES 30 water harvesting 11 Energy management NO 12 Fire protection and fire safety NO requirements 13 Electrical meter room, sub- station, receiving station YES 14 Others (Optionto Add more) Yours Faithfully of L.S/ Architect Signature & Name (IN BLOCK LETTERS) (License NO. tani Er. DHARMENDRA KUMAR PANDIT Reg. No. CBCEM/RI2018IAPL/00014 Building Planner, Designer Estimator &Interior