Cell : 9175701535 AKSHAY DARNE Balaji Ward, Near Atram House, Ballarpur-442701 Ref.: Date: 12/05/2019 ENGINEERS CERTIFICATE To, M/s J. K. Builders and developers Ballarpur Subject : Certificate for cost incurred for development C. N. No/CTS No./Survey No./Final Plot No. 87 demarcated by its boundaries (latitude and longitude of the end points) ROAD to the north, ROAD to the south, BMC HAND-OVER LAND to the east and ROAD to the west of Chandrapur Division village BALLALRPUR taluka BALLARPUR District CHANDRAPUR PIN – 442701 admeasuring area 1980.00 Sq. M. being developed by M/S J K BUILDERS AND DEVELOPERS. (Ref.: Maharera Registration Number : APPLIED). Sir, I have undertaken assignment of certifying estimated cost for the subject Real Estate project proposed to be registered under MahaRERA, being Building(s)/Block(s) of the building situated on C. N. No/CTS No./Survey No./Final Plot No. 87 of Division CHANDRAPUR village BALLALRPUR taluka BALLARPUR District CHANDRAPUR PIN – 442701 admeasuring area 1980.00 Sq. M. being developed by M/S J K BUILDERS AND DEVELOPERS. Following technical professionals are appointed by owner/promoter. (1) AR. RAJESH SAWARKAR (ARCHITECT) (2) Mr. AMEEN SAYYED (Structural Engineer and Colonnade Consultant) (3) Mr. Lalu Rangari (MEP Consultant) (4) Mr. Akshay Darne (Site Supervisior) 2. We have estimated the cost of the completion to obtain occupation certificate/completion certificate, of the civil MEP and allied works of the Building(s) of the project. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the developer and consultants and the schedule of items and quantity for the entire work as calculated by Quantity Surveyor appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate total estimated cost of the completion of the building(s) of the aforesaid project under reference as Rs. 9,33,64,750/-. The estimated total cost of the project is with reference to the civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate/completion certificate for the building(s) from the being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The estimated cost incurred till date is calculated at Rs. 000000/- . The amount of Estimated Cost incurred is calculated on the base of amount of the Total Estimated Cost. 5. The balance cost of completion of the Civil, MEP and allied works of the building(s) of the subject project to obtain Occupation/Completion Certificate from MHADA (Planning Authority) is estimated at Rs. 9,33,64,750/-/-. 6. Certificate that the cost of the Civil, MEP and allied work of the aforesaid project as completed on the date of this certificate is as given in the Table A and B below : TABLE A Building Block – A Sr.No. Particulars Amount 1 Total estimated cost of the building ------- as on the date of Registration is Rs. 9,33,64,750/- 2 Cost incurred as on Rs. 000000/- 3 Work done in percentage 0% (as percentage of the estimated cost) 4 Balance cost to be incurred Rs. 9,33,64,750/- (Based on estimated cost) 5 Cost incurred on additional/extra items as on not included in the estimated Nil cost (Annexure A) TABLE A Building Block – B & C Sr.No. Particulars Amount 1 Total estimated cost of the building block B & C as on the date of NOT APPLICABLE Registration is 2 Cost incurred as on 15/05/2019 NOT APPLICABLE 3 Work done in percentage NOT APPLICABLE (as percentage of the estimated cost) 4 Balance cost to be incurred NOT APPLICABLE (Based on estimated cost) 5 Cost incurred on additional/extra items as on not included in the estimated NOT APPLICABLE cost (Annexure A) TABLE A Building Block – D Sr.No. Particulars Amount 1 Total estimated cost of the building block B & C as on the date of NOT APPLICABLE Registration is 2 Cost incurred as on 15/05/2019 NOT APPLICABLE 3 Work done in percentage NOT APPLICABLE (as percentage of the estimated cost) 4 Balance cost to be incurred NOT APPLICABLE (Based on estimated cost) 5 Cost incurred on additional/extra items as on not included in the estimated NOT APPLICABLE cost (Annexure A) TABLE – B ( to be prepared for the entire registered phase of the Real Estate Project) Sr.No. Particulars Amount 1 Total estimated cost of the internal and external development works NOT APPLICABLE including amenities and facilities in the layout as on date of registration. 2 Cost incurred as on NOT APPLICABLE 3 Work done in percentage NOT APPLICABLE (as percentage of the estimated cost) 4 Balance cost to be incurred NOT APPLICABLE (Based on estimated cost) 5 Cost incurred on additional/extra items as on not included in the estimated NOT APPLICABLE cost (Annexure A) Yours faithfully (AKSHAY DARNE) (Site Supervisor)