The Maharashtra Real Estate Regulatory Authority (General) Regulations 2017 Form-2 [See Regulation 3] ENGINEER’S CERTIFICATE Date: 13/03/2020 To Mr. Vinod Ambadas Navghade & Mr. Rajendra Vithobaji Nimje C/o Ambadas Navghade, Sonuli Khurd, Post: Balapur, Tahsil – Nagbhid, District – Chandrapur Pin Code - 441205, Subject: Certificate of Cost Incurred for Development of ‘Shri Sai’ Residential layout of the Single Phase [MAHA RERA Number ] situated on the Plot bearing Survey no. 43/2A, Mouza Delanwadi, Tehsil Brahmapuri, District Chandrapur demarcated by its boundaries (latitude and longitude of the end points) Gat No.44 to the North , Gat No. 43/1 to the South, Remaining part of Gat No.43/2 to the East, D.P. Road to the West, Division - Nagpur Taluka - Bramhapuri, District - Chandrapur, PIN 441206 admeasuring 3000 Sq.Mts. area being developed by Mr. Vinod Ambadas Navghade & Mr. Rajendra Vithobaji Nimje . Ref: MahaRERA Registration Number [ ] Sir, I/We , Abhipray Manapure have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Layout Project registered under MahaRERA, being Layout Project of the Single Phase situated on the Survey no. 43/2A, Mouza Delanwadi, Tehsil Brahmapuri, District Chandrapur, PIN 441205 admeasuring 3000 Sq.Mts. area being Developed by Mr. Vinod Ambadas Navghade & Mr. Rajendra Vithobaji Nimje . 1.Following technical professionals are appointed by Owner / Promoter:- • Shri Abhipray Manapure as L.S / Architect ; • Shri __________________ as StructuralConsultant; • Smt Abhipray Manapure as MEP Consultant; • M/s Abhipray Manapure as SiteSupervisor 1. We have estimated the cost of the completion to obtain Occupation certificate Completion Certificate, of the Civil, MEP and Allied works, of the Building (s) of the project. Our estimated cost calculations are based on the Drawings/ plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Abhipray Manapure quantity Survivor appointed by Developer/Engineer, and the assumption of the cost of material labour and other inputs made by developer, and the site inspection carried out by us. 2. We estimate Total Estimated Cost of completion of the Layout of the aforesaid project under reference as Rs.3,35,000/- (Total of Table B). The estimated Total cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate/ completion certificate for the building(s) from the Bramhapuri Nagar Parishad being the planning Authority under whose jurisdiction the aforesaid project is being Implemented. 3. The Estimated cost Incurred till date is calculated at Rs.NIL (Total of Table B). The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 4. The balance cost of Completion of the civil, MEP and Allied works of the Layout of the subject project to obtain Occupation Certificate/ completion Certificate from Bramhapuri Nagar Parishad (Planning Authority) is estimated at Rs.3,35,000/- (Total of Table B). 5. I certify the cost of the Civil, MEP and allied work for the aforesaid project as completed on the date of this certificate is as given in Table A and B below: TABLE -A Building/Wing bearing Number or called Not Applicable (to be prepared separately for each Building/Wing of the real Estate project) Sr. Particulars Amounts No 1 Total Estimated Cost of the Building/Wing as on date of NA registration is applied 2 Cost incurred as on ___________(based on the Estimated cost) NA 3 Work done in Percentage (as Percentage of the Estimated cost) NA 4 Balance Cost to be Incurred (Based on Estimated cost) NA 5 Cost Incurred on Additional/ Extra items as on ________ not NA included in the Estimated Cost (Annexure A) (to be Frepared Jorthe €nrne recistered phase ot the RealEstate p!oje.t) Tolal Enimared cost ofthe lnterna and External Development ]9 L.( / Works ln.luding amenil€s and Faciilies in the lavolt a5 on 29/02/2020 date of ReEistration h 7 co r 'lureda.on 29 0//,/020 (o"seo onrhe Lst'rareo (otr) work done in Percentaee {as PercenFge ofrhe Estimated cost) Ba ance con to be hcutred (Bas€d on Est mated cos0 Costlncuded on Additiona / Extra items as on_ / not ini lded in the Estimated cost (AnnexreA) ","d44 1293 The Mahararhtra Rea EstateRegulatoryAuthority(General)ReCuations2017 r. The scope of work is to.ompete entke RealEstate Projeci as per d.awings approved from !ihe to time so as to obtain occupatlon certificate/comp et on c€rt fjcai€. 2. (')auanutysuryevcai bedon€ by oiiic€ ofEngiieerorcan be done bvan independ€nt Quantity sudeyor, whose cenlncate of quantty ca culat€d can b€ reli€d upon by th€ Eng neer. ln case oi independ€nt quantity survivor bei.g appointed by deve oper. The nam€ has to be mentioned at the pLace mark€d (r) and in cas€ quantity are beins calculated bv oliice ofengineer, The name of the person the ofiice of eneineer, who s responsble for the quantityca cu ated shou d be mentioned atthe pla.e narked ('). 3. The e5t mated cost ncludes a labour, mat€ral €qu pment and machine.y required to 4. As thG an estimated cost anv divsion in quantjiy requked ior d€velopment ofthe real esratep@jectwi resu t amendmentotthe cost inquned /to be inquired. s. Al componencolworkwithspecif catonarelndicativeandnotexhausuve. annexurea List ot Extra / .dditional ltens exe.ut€d with cost lwhich were not pa.i orthe originalesrimated ottotal.ost)