PARINITA P. MESHRAM JATPURA WARD NO - 6, SINDIBAN MOHOLLA,CHANDRAPUR Res.- (07172) 277L53 , Mob.- 9860248100 REGTSTRATTON NO. - CA 120A4 I 34s27 ENGINEER'S CERTIFICATE To MR. BHASKAR WADSAKAR, WADASKAR BUILDERS & DEVELOPERS, BALLARPUR Subject: Certificate of Cost Incurred for Development...........situated on the Plot - 3 bearing Diverted Survey no: 17515 demarcated by its bounclariE5fiatitude and longitude of the end points)to the North LAYOUT PLOT NO- 5,6 & 7 to the South 12.00 M WIDE SERVICE ROAD to the East FDCM ROAD the West TAYOUT PLOT NO.-2 of Chandrapur Division village BALLARSHA taluka BALLARPUR District Chandrapur PIN 442701 admeasuring area 1216.25 SQ.M. being developed by WADASKAR BUILDERS & DEVELOPERS Ref:MahaRERA Registration Number APPLIED Sir, I have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under 1y13h2-g5qA, be'rng Building(s) /eloAGIof the Buildings situated on the Plot no.- 03 bearing SUR. N0-175/5 _of Division Village BATLARSHA Taluka BALLARPUR District Chandrapur admeasuring L216.25 sq.mts. are a being developed by WADASKAR BUILDERS & DEVELOPERS Following technical professionals are appointed by Owner/ Promoter:- (i) AR.PARINITA MESHRAM (Architect,) (ii MR.PATANKAR (Structural Engineer& Consultant) (iii) MR. PRASHANT WAGDARKAR (MEP Consultant) (i") AR. PARINITA MESHRAM (Quantity Surveyor) 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made availa,ble to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Quantity Surveyorx appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs.3,00,00,000/- he estimated Total Cost of project is with reference to the Civil ,MEP and allied works required to be completed for the purpose of obtaining occupation certificate/completion certificate for the building (s) frorn the being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost lncurred till date is calculated at Rs. 0000000/- . The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil , MEP and Atlied works of the Building(s) of the subject project to obtain Occupation Certificate/Completion Certificate from MHADA (Planning Authority) is estimated at Rs 00000000/-. 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLEA Building BLOCK- A ir. No rarticulars Amounts lotal Estimated cost of the building --------as on date of 1s. 3,00,00,000/- legistration is lost incurred as on -------- 1s. -00,00000/- Work done in Percentage )% (asPercentage of the estimatedcost) Balance Cost to be lncurred rs. 00000000/- IBased onEstimated Cost) lost Incurred on Additional /Extra ltems Nil-- \s on not included in the Estimated Cost(Annexure A) Table A Bu BLOCK- B&C ir. No Particulars qmounts l-otal Estimated cost of the building Block B&C as on date of NOT APPLICABLE legistration is lost incurred as on 1,5/O712077 \OT APPLICABLE ffork done in Percentage NOT APPLICABLE as Percentage of the estimatedcost) lalance Cost to be lncurred NOT APPLICABLE ,Based onEstimated Cost) lost lncurred on Additional/Extra ltems NOT APPLICABLE \s on not included in the Estimated Cost(Annexure A) Table A Building BLOCK- D lr. No )articu Ia rs \mounts 1 lotal Estimated cost of the building Block D as on date of !OT APPLICABLE legistration is lost incurred as on15/0712017 \OT APPLICABLE ffork done in Percentage NOT APPLICABLE asPercentage of the estimatedcost) lalance Cost to be lncurred \OT APPLICABLE Based onEstimated Cost) lost lncurred on Additional /Extra ltems NOT APPLICABLE qs on not included in the Estimated Cost(Annexure A) TABLEB (to be prepared for the entire registered phase of the Real Estate Project) ir.No )a rticula rs \mounts 1 Total Estimated cost ofthe lnternal and External Development Works including amenities and !OT APPLICABLE Facilities in the layout as on jate of Registration. 3ost incurred as on \OT APPLICABLE ibased on the Estimated cost) rVork done in Percentage NOT APPLICABLE as Percentage of the estimated cost) lalance Cost to be lncurred \OT APPLICABLE Based on Estimated Cost) lost lncurred on Additlonal /Extra ltems NOT APPLICABLE \s on not included in :he Estimated Cost(Annexure A) Yours Falthfully Signature q (License No. ... ffi ,re ,$E311,}ft,, *Note 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certiJicate of quantity calculated canbe relied uponby the Engineer. In case of independent quantity survey or being appointed by Developer, the name has to be mentioned at the place marked(*)an d in case quantity are being calculate d by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked(*). 3. The estimated cost includes alllab our, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in a mendment of the cost in curred / tobe incurred. 5. A11 components of work with specifications are indicative and not exhaustive. Annexure A List of Extra/ Additional lt emsexecuted with Cost (which were not part of the original Estimate of Total Cost)