Jatpura Ward No. 6, Sindiban Mohalla, Chandrapur. Contact : {M) 9860248100, 9403819454 Email : paril8780@rediffmail.com Registration No. - CA/2004134527 Ref. No. - Date: ENGINEER'S CERTIFICATE To MRS. PRATIBHA V. BHUSARI CHANDRAPUR Subject: Certificate of Cost Incurred for Development PRABHULEELA APPARTMENT situated on the Sheet No.-94,plot No.-L9,2Ll2,27ilearing Diverted Survey no. 13179 demarcated by its boundaries (latitude and longitude of the end points) to the North PIOT NO- LAND SHRI.NARULE to the South ROAD to the East PLOT OF MR. ANAAD KHANKE to the West CONSTRUCTION OF SHARDA BAWATE of Chandrapur Division village CHANDRAPUR taluka BALLARPUR District Chandrapur PIN 442701 admeasuring area 296.26 Sq.M being developed by MR. MRS. PRATI V.P. ER,S & Ref:MahaRERA Registration Number APPLIED Sir, I have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being Building(s) /Block(s) of the Buildings situated on the plot Lg,ZOlz.2t2 bearing SUR. NO-13 L79-of Division Village CHANDRAPURTaIuka BALLARPUR District Chandrapur admeasuring 295.26sq.mts. are a being developed by MRS.PRATIBHA V.BHUSARI . Following technical professionals are appointed by Owner/ Promoter:- (i) AR.PARINITA MESHRAM (Architect,) (ii ER. suDESH MALODE (Structural Engineer& consultant) (iii) MR. UMESH TELANG (MEP Consultant) (i") AR.PARINITA MESHRAM (Quantity Surveyor) 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEp and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by euantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under referenceasRs.@TheestimatedTotalCostofprojectiswithreferencetotheCivil ,MEp and allied works required to be completed for the purpose of obtaining occupation certificate/completion certificate for the building(s) from the being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost lncurred till date is calculated at Rs 51,48 ,OOO/-. The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil , MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate/Completion Certificate from MHADA (Planning Authority) is estimated at Rs 88,37,000/-. 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLEA Building BLOCK- A Sr. No Particulars Amounts Iotal Estimated cost of the building -----:--€ls oD Rs. -1,39,85,00O/- Cate of Registration is 3ost incurred as on ls. -51,48,000/- rffork done in Percentage )% f ^-r.t^-aanla-^ +h^ ac*ima*aelaacl\ ^f + Balance Cost to be lncurred Rs. 88,37,000/- lD^-^-J ^^ E-+i-a+a,I a^-+\ 5 Cost lncurred on Additional/Extra ltems Nil--- As on not included in the Estimated Cost(Annexure A) Table A Bu ildine BLOCK- B&C ir. No Particulars \mounts t Iotal Estimated cost of the building Block B&C as NOT APPLICABLE on date of Registration is 2 lost incurred as on ]-5/O7l2OL7 NOT APPLICABLE 3 Work done in Percentage NOT APPLICABLE (asPercentage of the estimatedcost) 4 3alance Cost to be lncurred NOT APPLICABLE iBased on Estimated Cost) 3ost lncurred on Additional/Extra ltems !OT APPLICABLE {s on not included in the Estimated 3ost(Annexure A) Table A Buildi BLOCK lr. No >a rticu la rs Amounts t Iotal Estimated cost of the building Block D as on NOT APPLICABLE Cate of Registration is Cost incurred as on 1510712017 NOT APPLICABLE l Work done in Percentage NOT APPLICABLE asPercentage of the estimatedcost) 4 Balance Cost to be lncurred \OT APPLICABLE (Based onEstimated Cost) ) Cost lncurred on Additional/Extra ltems NOT APPLICABLE As on not included in the Estimated Cost(Annexure A) TABLEB (to be'prepared for the entire registered phase of the Real Estate Project) Total Estimated cost of the lnternal and External Development Works including amenities and Facilities in the layout as on late of Registration. Cost incurred as on NOT APPLICABLE (based on the Estimated cost) ] Work done in Percentage NOT APPLICABLE (as Percentage of the estimated cost) + 3alance Cost to be lncurred \OT APPLICABLE iBased on Estimated Cost) ) 3ost lncurred on Additional /Extra ltems \OT APPLICABLE As on not included in [he Estimated Cost(Annexure A) 'lrV) Yours Faithfully Signatur (License No.... CAl2OO4l34527 ) }3le