Mob.94221399{ VASTUPUHTI ASSOCIATES Architectural, lnterior & Civil Consultant Add.Shende Plot , Ramnager Chandrapur Pin- 442401 (M.S.) Prop :- Kailash V.Dhabekar B.E. ( Civil ) Ref No. Date :- ENGINEER'S CERTIFICATE To Mr. Santosh s. kolettiwar, The Proprietor, Pratham Construction,chandrapur Subject: Certificate of Cost hrcurred for Development of !f!!@!!!$gf[situated on the Plot 4329.4330,4331.4332 bearing Diverted Sheet no. 42 demarcated by its toulTtfartes (latitude and longitude of the end points) to the North 4328 to the South 4337 to the East ROAD to the West 4333 of Chandrapur Division village CHANDRAPUR taluka Chandrapur Districtg@41[3pgl PIN 442401 admeasuring area being developed by Ref:MahaRERA Registration Number : APPLIED Sir, I have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered underMahaRERA,beingeuitaingGj/B.i;k(,oftheBuildinbearingSHEETNo {!of Division ViIIageCHANDRAPUR Taluka CHANDRAPUR District Chandrapur admeasuring 469.31 sq.mts. are a being developed by PRATHAM CONSTRUCflTON Following technical professionals are appointed by Owner/ Promoter:- (i) AR.PARTN|TA MESHRAM - Architect (ii Er " P.S. PATANKAR, NAGPUR - Stiuctural Engineer& Consultant (iii) s.u.DoKE & BRoTHERS, CHANDRAPUR - MEP Consultant (i") ER. KAILASH DHABEKAR - Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEp and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs.- lflmmtfhe estimated Total Cost of project is with reference to the Civil ,MEP and allied works required to be completed for the purpose of obtaining occupation certificate/completion certificate for the building(s) from the being the Planning Authority under whose jurisdiction the aforesaid project is being implemented 4. The Estimated Cost lncurred till date is calculated at Rs. 30.00000 /- . The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 5. TheBalancecostof CompletionoftheCivil ,MEPandAlliedworksoftheBuilding(s) ofthesubjectprojecttoobtain Occupation Certificate/Completion Certificate from MHADA (Planning Authority) is estimated at Rs 12000000/-. 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLEA BLOCK- A ir. No ,articulars \mounts otal Estimated cost of the building --------as on date of ts. -1,50,000001* lost incurred as on -------- ls. -30,00000[" l0 o/o asPercentage of the esti matedcost) Cost to be lncurred ls. 1,2000000/- t lncurred on Additional /Extra ltems Nil--- on not included in the Estimated Cost(Annexure A) Table A BLOCK- B&C ir. No qmounts 'articulars I'otal Estimated cost of the building Block B&C as on date of NOT APPLICABLE legistration is lost incurred as on t5/07 /2077 \OT APPLICABLE ffork done in Percentage NOT APPLICABLE asPercentage of the estimatedcost) lalance Cost to be lncurred !OT APPLICABLE ,Based onEstimated Cost) lost lncurred on Additional /Extra ltems {OT APPLICABLE \s on not included in the Estimated Cost(Annexure A) Table A Buil BLOCK. D ir. No )a rticula rs \mounts l-otal Estimated cost of the building Block D as on date of lOT APPLICABLE tegistration is lost incurred as onl5l07/2017 \OT APPLICABLE ffork done in Percentage NOT APPLICABLE asPercentage of the estimatedcost) lalance Cost to be lncurred NOT APPLICABLE ,Based onEstimated Cost) lost lncurred on Additional /Extra ltems lOT APPLICABLE \s on not included in the Estimated Cost(Annexure A) TABLEB (to be prepared for the entire registered phase of the Real Estate Project) lr.No )a rti cu la rs \mounts Total Estimated cost of the lnternal and External Development Works including amenities and !OT APPLICABLE Facilities in the layout as on late of Registration. lost incurred as on !OT APPLICABLE based on the Estimated cost) ,ly'ork done in Percentage NOT APPLICABLE 'as Percentage of the estimated cost) lalance Cost to be incur:red !OT APPLICABLE ,Based on Estimated Cost) lost Incurred on Additional /Extra ltems !OT APPLICABLE As on not included in ;he Estimated Cost(Annexure A) Yours Faithfully signature fKh,\t}z License No. ... EN-10Y Ur. faifa*t V. pfrabekar H,','lltifJllt1[Eii?,:;?